Maharashtra State Electricity Distribution Co. Ltd.

Renewable Energy Circulars

Circular Sr. No. Name of the Circular Date of the Circular
12 Authorization for signing Lease Agreement under BESS Scheme.
File size: (195.60 KB, PDF)
07.08.2025
11 Authorization for signing Development and Sub-Development Agreement under LIS Solarization Scheme.
File size: (487.82 KB, PDF)
20.03.2025
10 Installation of Rooftop Solar in the premises of Sugar factories having EPA/PPA with MSEDCL for their Bagasse based Cogeneration plant
File size: (126.74 KB, PDF)
18.03.2024
9 Submission of invoices in r/o RE Generation for Interstate through WEB Portal of MSEDCL
File size: (745.81 KB, PDF)
28.06.2023
8 Facility for online payment of open access charges in respect of renewable energy generators through NCE portal
File size: (1.77 MB, PDF)
23.06.2023
7 मुख्यमंत्री सौर कृषी वाहिनी योजनेंतर्गत कृषी वाहिनीचे सौर ऊर्जीकरण करण्याच्या दृष्टीने लागणाऱ्या जमीनीचा भाडेपट्टा निश्चित करण्याचे सुधारित धोरण व आवश्यक जमीनी सुलभरित्या व शिघ्रगतीने उपलब्ध करण्याबाबत आवश्यक सहाय्य देण्याबाबत.
File size: (588.47 KB, PDF)
16.11.2022
6 Guidelines for online application to the consumers opting 100% Renewable Energy for levy of Green Power Tariff- Amendment I
File size: (10.99 MB, PDF)
25.08.2022
5 MSEDCL’s Renewable Energy Circular No.05 dated-16.06.2022 regarding Procedure for purchase of 10% banked Wind/Solar energy by MSEDCL
File size: (1.08 MB, PDF)
16.06.2022
4. Guidelines for online application to the consumers opting 100% Renewable Energy for levy of Green Power Tariff.
File size: (1.61 MB, PDF)
12.04.2022
3. Procedure for levy of Green Power Tariff to the consumers opting for 100% Renewable Energy
File size: (1.53 MB, PDF)
23.03.2022
2. Circular for Procedure of Change in Name/Ownership of Renewable Energy Generators,
File size: (1.05 MB, PDF)
A. Joint Application Form
File size: (69.55 KB, PDF)
B. Draft Undertaking
File size: (19.15 KB, PDF)
C. Draft PPA for Change in Name
File size: (34.77 KB, PDF)
D. Draft PPA for Change in Ownership
File size: (34.94 KB, PDF)
09.07.2019
1. Circular for Commissioning Procedure of connectivity/commissioning of solar power projects under MSKVY
File size: (77.33 KB, PDF)
04.12.2018

Urja
Empowering the Consumer