| Implementation of updated Technical Specifications of Energy Efficiency Level-II Distribution Transformers and stoppage of use of Energy Efficiency Level-I Distribution Transformers |
29/09/2025 |
| Implementation of updated Technical Specifications of Energy Efficiency Level-II Distribution Transformers and stoppage of use of Energy Efficiency Level-I Distribution Transformers |
10/06/2025 |
| Implementation of updated Technical Specifications of Energy Efficiency Level-II Distribution Transformers and stoppage of use of Energy Efficiency Level-I Distribution Transformers |
22/04/2025 |
| Circular No-14 Auto approval of contract demand reduction for HT consumers |
27/05/2024 |
| Approved agencies for supply of LT/HT Meters directly to consumers |
07/11/2023 |
| Circular No-13 Guidelines for connecting HV spare cables in parallel with the Main cable |
30/08/2020 |
| Earthing of HT Metering Cubicle |
16/01/2020 |
| Circular No-11 Failure of Power Transformers and need to follow maintenance schedule thereof |
21/07/2020 |
| Implementation of CEA guideline for Validity period of type test |
22/06/2020 |
| Testing Circular -09 Utilizing dry type resin cast Metering/protection CTs &PTs and stoppage of oil filled CTs/PTs in r/o MSEDCL’s HT consumer and Substations thereof |
18/06/2020 |
| MSEDCL TESTING CIRCULAR REGARDING STANDARD CT RATIO |
14/05/2020 |
| Revised Guidelines regarding Metering in respect of HT/EHV/Open Access consumers |
25/02/2020 |
| Utilization of ABT meter (SEM) for HT roof-top Solar Generation projects |
25/02/2020 |
| Approval for use of latest technology material in MSEDCL i.e. Natural Ester, HT Covered conductor and Fault Passage Indicator |
04/12/2019 |
| Amendment AB switch circular |
26/11/2019 |
| Circular for Stipulation of Transformer Capacity while load sanction in respect of HT consumers |
12/04/2019 |
| Inspection and testing of electrical installations upto notified voltage as per Reg.30 & Reg. 43 of CEA (Measures relating to Safety and Electric Supply) Regulations 2010, amended on 2015 and amended on 2018.Circular for Stipulation of Transformer Capacity while load sanction in respect of HT consumers |
19/08/2019 |
| Providing AB switches at 11/22/33kV HT consumers Installation for isolation. |
19/08/2019 |
| Circular : Guidelines for proper installation of 40-200Amp CT Embedded Energy Meter for avoiding the PT missing event |
29/10/2018 |
| Circular-Guidelines for observing electrical safety and reduction in Accidents thereof |
24/08/2018 |
| Circular- Utilization of existing installed ABT meter (SEM) as Net meter for Soalar rooftop projects |
26/04/2018 |
| Circular- Guidelines regarding Metering in respect of HT/EHV consumers |
16/04/2018 |
| Circular reagarding guidelines for keeping spare metering CTs and PTs in r/o EHV consumers/Generators |
20/01/2018 |
| Implementation of revised energy performance standard for Distribution Transformers up to 2500 KVA rating |
28/04/2017 |
| Guidelines for ensuring separate earthing of solar roof-top PV project and safety thereof |
03/08/2016 |