| 93 |
Ref.No.:CE(Dist)/M-I/General/Stamp Duty/No:22603 |
10/07/2025 |
Payment of Stamp Duty for various instruments in accordance with the amended Maharashtra Stamp Act, 1958. |
 |
| 92 |
CE(Planning)/GIS Mapping/01840 |
16/01/2025 |
Guidelines for Infrastructures mapping through GIS with the help of PM Gati Shakti APP |
 |
| 91 |
ED(Dist-II)/M-I/NSC-Guidelines/35530 |
14/11/2024 |
Infrastructure development for release of new connections/Enhancement of Load – Guidelines thereof |
 |
| 90 |
CE(Dist)/M-I/PS/Infra Guidelines/023715 |
01/08/2024 |
Infrastructure Development for release of New Connections – Revised Guidelines thereof |
 |
| 89 |
Ref.Director(Op.)/Dist./M-I/NC-Circular/37112 |
20/12/2023 |
Release of New Service Connections (Excluding Ag. Connections)-Guidelines thereof |
 |
| 88 |
CE(Dist)/M-I/NC/NC-Refund/15894 |
02/06/2023 |
Refund of expenditure on Infrastructure Development for release of New Connections under New Consumer/Connection (NC)-Refund Scheme. |
 |
| 87 |
CE(Dist.)/M-III/Schedule of Charges/14106 |
18/05/2023 |
Schedule of Charges (SoC) for various services of MSEDCL (with effect from 1st April- 2023.) |
 |
| 86 |
CE(Dist)/M-I/General/DDF Centages FY 2022-23/3905 |
13/02/2023 |
Loading of centages in estimates for DDF, DPDC, Scheme works FY 2022-23 |
 |
| 85 |
CE(Dist)/ M-I/ NC/ 8353 |
04/04/2022 |
Supplementary Guidelines for Infrastructure Development to release New Connection |
 File size: (1.32 MB, PDF) |
| 84 |
मु.अ.(वितरण)/भांका–१ /जीप्रयो/१२६८७ |
07/06/2021 |
Dr. Babasaheb Ambedkar Jivan Prakash Yojana Circular |
 |
| 83 |
CE(Dist)/ M-I/ Bus Duct/ 6659 |
19/03/2021 |
Guidelines and delegation of power for approv Rising Mains Bus Duct in Multi Storied buildings |
 |
| 82 |
CE(Dist.)/M-I/NSC/ 6660 |
19/03/2021 |
Supplementary guidelines for Infrastructure development to release new connections |
 File size: (1.14 MB, PDF) |
| 81 |
CE(Dist.)/M-III/ Schedule of Charges/ 09078 |
07/04/2020 |
Schedule of Charges (SoC) for various services of MSEDCL (with effect from 1st April- 2020.) |
 File size: (290.82 KB, PDF) |
| 80 |
CE(Dist)/M-1/F-516/NSC-Augmentation/No 30441 |
04/11/2019 |
Guidelines for Infrastructure development to release new connections-requirement of land for establishment of distribution transformer in case of augmentation at same place |
 File size: (607.96 KB, PDF) |
| 79 |
ED (Dist-II)/LT-Conn sanction/26331 |
18/09/2019 |
Revised delegation of powers to Sanction Estimate of new LT Connections. |
 File size: (292.28 KB, PDF)  File size: (10.67 KB, PDF) |
| 78 |
CE(Dist)/D-III/FN-506/NSC/27609 |
30/09/2019 |
Guidelines for infrastucture devlopment to release new connections. |
 File size: (884.21 KB, PDF) |
| 77 |
CE(Dist)/RE-I/27494 |
27/09/2019 |
Designation of the officers /offices competent to receive & settle applications for compensation under the SoP & List of Executive Engineer |
 File size: (709.18 KB, PDF)
 File size: (320.25 KB, PDF) |
| 76 |
CE(Dist)/D-III/FN-506/NSC/27609 |
30/09/2019 |
Guidelines (Additional) for Infrastructure Development to release new connection. |
 File size: (884.21 KB, PDF) |
| 75 |
E.D.(Dist-II ) /Guidelines/NonSoP/25388 |
11/09/2019 |
Guidelines for sanctioning of power supply to Existing / New Consumers demanding power
supply on higher voltage level (Non SoP level) than specified in MERC Standard of
Performance (SoP) Regulations. 2014. |
 File size: (2.86 MB, PDF) |
| 74 |
CE(Dist.)/RE/RE-1/16280 |
13/06/2019 |
MERC Order in case no. 102 of 2019 Dtd. 20.05.2019 (Regarding exempting the timelines for releasing the connections to Agriculture and Residential consumers & determination of compensation thereof) |
 File size: (425.29 KB, PDF) File size: (425.29 KB, PDF) |
| 73 |
CE (Dist)/D-III/R&M/11102 |
07/05/2019 |
Guidelines for execution of R & M works and utilization of funds thereof. |
 File size: (3.96 MB, PDF) |
| 72 |
CE(Dist.)/RE-I/11839 |
07/05/2019 |
Circular about unplanned and frequent power outages in MIDC and other areas |
 File size: (1.55 MB, PDF) |
| 71 |
ED/Dist-II/16213 |
12/06/2019 |
Circular regarding Removal of illegally fixed communication cables on MSEDCL Structures |
 File size: (1.05 MB, PDF) |
| 70 |
CE(Dist_/RE/RE-1/16280 |
13/06/2019 |
Circular regarding MERC order in case no. 102 of 2019 dtd 20.05.2019. |
 File size: (425.29 KB, PDF) File size: (425.29 KB, PDF) |
| 69 |
CE (Dist)/D-III/NSC/14157 |
21/05/2019 |
Clarification guidelines for development of infrastructure by an applicant for NSC and refund of the expenditure on infrastructure. |
 File size: (488.39 KB, PDF) |
| 68 |
CE (Dist)/D-III/Technical/7949 |
19/03/2019 |
Supplementary guidelines for Infrastructure development to release new connections |
 File size: (2.24 MB, PDF) |
| 67 |
CE (Dist)/D-III/7500 |
15/03/2019 |
Distribution Circular Regarding Revised guidelines- Preparation of estimates for shifting of existing distribution electrical infrastructure due to road widening, construction of bridges, etc by National Highway Authority of India (NHAI), Public Works Department (PWD) , MSRDC, Railways, Local bodies, ec under DDF |
 File size: (3.74 MB, PDF) |
| 66 |
CE (Dist.)/ Solar/2472 |
24/01/2019 |
implementation of Mukhyamantri Saur Krushi Pump Yojana |
 File size: (3.27 MB, PDF) |
| 65 |
CE (Dist.)/ D-III/ NSC/30011 |
20/12/2018 |
Infrastructure Development for release of new connection |
 File size: (33.21 MB, PDF) |
| 64 |
CE (Dist.)/ D-III/ Ag./ DFF/30175 |
21/12/2018 |
Extending the facility of DDF for releasing Agricultural connection on HVDS and for conversion of existing Ag connection from LVDS to HVDS |
 File size: (1.81 MB, PDF) |
| 63 |
CE/MIVIC/MSC-I/29811 |
19/12/2018 |
Approved vendor list of LT Capacitors required for Agriculture pumps) |
 File size: (1.23 MB, PDF) |
| 62 |
CE (Dist.)/ D-IV/ C.No. 195 of 2017/ SoC/29320 |
14/12/2018 |
Corrigendum Circular No. 29320 – Schedule of charges (case No. 195 of 2017) |
 File size: (561.83 KB, PDF) |
| 61 |
CE (Dist.)/ Testing/ 40-200A Meter / Guidelines /25597 |
29/10/2018 |
Circular : Guidelines for proper installation of 40-200Amp CT Embedded Energy Meter for avoiding the PT missing event. |
 File size: (1.59 MB, PDF) |
| 60 |
CE (Dist.)/ D-III/ NHAI/ T-87/24724 |
19/10/2018 |
Additional guidelines for preparation of estimates for shifting of existing distribution electrical infrastructure due to road widening, construction of bridges etc, by National Highway Authority of India (NHAI), Public Water Department (PWD), Local Bodies, etc. |
 File size: (1.22 MB, PDF) |
| 59 |
CE (Dist.)/ D-IV/ C.No.195 of 2017/ SoC/23862 |
08/10/2018 |
Circular for revised Schedule of Charges (SoC) w.e.f. 1st Sept-2018, MERC Case No. 195 of 2017 dt. 08.10.2018. |
 File size: (1.35 MB, PDF) |
| 58 |
CE/Dist/T/Safety/EI/20529 |
24/08/2018 |
Circular-Guidelines for observing electrical safety and reduction in Accidents thereof. |
 File size: (3.50 MB, PDF) |
| 57 |
CE(Dist)/D-III/Non DDF Stoppage/147472 |
15/06/2018 |
Circular-Stoppage of Non- DDF CC&RF scheme for release of power supply to prospective consumers- Amendment to circular thereof. |
 File size: (932.32 KB, PDF) |
| 56 |
क्र. मु.अ. (वितरण)/डी-३/NHAI Circular/२३७९९ |
28/09/2017 |
परिपत्रक विषय – राष्ट्रीय महामार्ग प्राधिकरण, सार्वजनक बांधकाम विभाग, स्थानिक संस्था यांचेमार्फत रस्ता रुंदीकरण / नवीन रस्ते बांधणे / पुल बांधणी कामासाठी विद्युत वाहिनी स्थलांतर करताना मार्गदर्शक सुचना |
 File size: (972.36 KB, PDF) |
| 55 |
CE(Dist)/D-III/NSC/10992 |
15/05/2018 |
Circular- Infrastructure development for release of new connections |
 File size: (20.30 MB, PDF) |
| 54 |
CE/Testing/NET/ABT Meter/9692 |
26/04/2018 |
Circular- Utilization of existing installed ABT meter (SEM) as Net meter for Soalar rooftop projects. |
 File size: (928.73 KB, PDF) |
| 53 |
ED(Dist)/D-III/Non DDF Stoppage/9245 |
23/04/2018 |
Circular- Stoppage of Non DDF CC&RF scheme |
 File size: (728.97 KB, PDF) |
| 52 |
CE/Testing/HT-EHV/Metering/Circular/CM-CF/8378 |
16/04/2018 |
Circular- Guidelines regarding Metering in respect of HT/EHV consumers |
 File size: (3.23 MB, PDF) |
| 51 |
ED(Dist)/D-III/Physical verification of Assests/1593 |
22/01/2018 |
Circular for Physical verification of MSEDCL assets |
 File size: (1.19 MB, PDF) |
| 50 |
CE/Testing/Spare/CTPT insp./Std. Guidlines/1507 |
20/01/2018 |
Circular reagarding guidelines for keeping spare metering CTs and PTs in r/o EHV consumers/Generators |
 File size: (2.12 MB, PDF) |
| 49 |
CE/Dist/D-IV/MERC/31793 |
29/12/2017 |
Amendment in Circular No. 25079 dt. 12.10.2017, for refund of SLC, ORC & Meter Cost Refund to Consumers. |
 File size: (311.53 KB, PDF) |
| 48 |
CE/Dist/D-III/DTC Capacity & Metering /29874 |
07/12/2017 |
Use of commensurate capacity DTC and provision of DTC metering. |
 File size: (315.09 KB, PDF) |
| 47 |
CE/Dist/D-IV/MERC/25079 |
12/10/2017 |
Refund of SLC ORC Meter Cost to the consumers |
 File size: (1.64 MB, PDF) |
| 46 |
CE/Dist/D-IV/MERC/25079 |
12/10/2017 |
Circular – Refund of SLC, ORC & Meter Cost to consumers |
 File size: (1.95 MB, PDF) |
| 45 |
CE/Dist/D-III/23799 |
28/09/2017 |
Guidelines – Preparation of estimates for shifting of existing distribution electrical infrastructure due to road widening, construction of bridges etc. by National Highway Authority of India (NHAI), Public Works Deptt. (PWD), Local bodies, etc.) |
 File size: (2.38 MB, PDF) |
| 44 |
CE/MMC/SM/e-auction/002312 |
21/07/2017 |
Circular dtd. 21-07-2017 for Timely disposal of scrap/obsolete materials lying at various zones through e-auction |
 File size: (436.26 KB, PDF) |
| 43 |
मु.अ. (वितरण )/ग्रावि /परिपत्रक /१५८७१ |
07/06/2017 |
परिपत्रक : सन्माननीय लोक प्रतिनिधी यांना त्यांच्या विभागातील कामकाजाबाबत अवगत करण्याबाबत |
 File size: (1.45 MB, PDF) |
| 42 |
CE(Dist)/R-III/AG-Pump/DDF/14025 |
07/06/2017 |
Revised Guidelines for releasing new Agriculture connections under DDF scheme. |
 File size: (647.69 KB, PDF) |
| 41 |
CE/Testing/Star Rated/DT/9923 |
28/04/2017 |
Implementation of revised energy performance standard for Distribution Transformers up to 2500 KVA rating |
 File size: (1.10 MB, PDF) |
| 40 |
CE/DIST/D-IV/7846 |
06/04/2017 |
Circular Notified voltage |
 File size: (1.98 MB, PDF) |
| 39 |
CE/DIST/D-III/Circular/Safety/1084 |
17/01/2017 |
Circular – Preventive measures to reduce accidents |
 File size: (1.06 MB, PDF) |
| 38 |
CE/DIST/T/24615 |
03/08/2016 |
Guidelines for ensuring separate earthing of solar roof-top PV project and safety thereof |
 File size: (140.98 KB, PDF) |
| 37 |
CE(Dist)/D-III/MERC/SOC/399387 |
03/11/2007 |
Recovery of Supervision Charges |
 File size: (69.42 KB, PDF) |
| 36 |
CE(Dist)/D-IV/Centages/DDF works /24007 |
29/07/2016 |
Recovery of Centages for DDF Scheme Works |
 File size: (1.85 MB, PDF) |
| 35 |
CE(Dist)/D-III/Main Tran Cap less than 1000 kva/23650 |
27/07/2016 |
Maintenance schedule of transformers of capacities less than 1000 KVA |
 File size: (1.67 MB, PDF) |
| 34 |
CE(Dist)/D-III/Continuous Supply/HT Consumer/07388 |
04/03/2016 |
Maintaining continuous supply to HT Consumer by reducing Planned/Forced outages-Directives thereof |
 File size: (975.21 KB, PDF) |
| 33 |
CE(Dist)/D-III/Continuous Supply/HT Consumer/07388 |
04/03/2016 |
Maintaining continuous supply to HT Consumer by reducing Planned/Forced outages-Directives thereof |
 File size: (975.21 KB, PDF) |
| 32 |
CE(Dist)/D-III/43000 |
31/12/2015 |
Waival of 1.3% supervision charges of the works carried out by MIDC Authority under DDF schemes in MIDC / Industrial cluster area |
 File size: (1.19 MB, PDF) |
| 31 |
CE(Dist)/D-IV/39028 |
10/11/2015 |
पंचायत /ग्रामपंचायत कार्यालयात महावितरणचे अधिकारी व कर्मचारी यांची नावे व भ्रमणध्वनी क्रमांक असलेले फलक लावणेबाबत |
 File size: (1.76 MB, PDF) |
| 30 |
CE(Dist)/D-III/Req. of Land/39010 |
09/11/2015 |
Supplement to Circular No. CE(Dist)/D-III/Req. of Land/28792 Dt:17.07.2015 |
 File size: (3.07 MB, PDF) |
| 29 |
CE(Dist.)RE-III/Tenders/36360 |
3/10/2015 |
To Avoid Sending of un-necessary copies of correspondence to H.O. |
 File size: (42.77 KB, PDF) |
| 28 |
CE(Dist.)/RE-III/Tenders/33936 |
11/09/2015 |
Qualitative and Quantitative inspection of works carried out for Ag.Pump energization under special package and Backlog Funds. |
 File size: (2.86 MB, PDF) |
| 27 |
CE/Dist./32900 |
03/09/2015 |
Effective Implementation (Circular No.CE/Dist./32900 Dt.03.09.2015) |
 File size: (218.04 KB, PDF) |
| 26 |
CE(Dist.)/Ag pump/EE/RE-I/29874 |
31/07/2015 |
Task Force for Inspection of AG Energisation Works,under special package and Backlog scheme |
 File size: (55.49 KB, PDF) |
| 25 |
CE(Dist.)/D-III/29450 |
24/07/2015 |
Revision of Delegation of powers in case of administrative approval / sanction of DDF proposals costing more than Rs.10 Crs. |
 File size: (268.91 KB, PDF) |
| 24 |
CE(Dist)/D-III/Req. of Land/ 28792 |
17/07/2015 |
Revised Guidelines for Requirement of adequate land for Distribution Transformer Centers and Substations while releasing connection to
Residential/Commercial/Industrial etc. complexes/township/establishments, having multiple numbers of connections. |
 File size: (508.46 KB, PDF) |
| 23 |
Dir(O)/MSEDCL/SS&online Cap/28777 |
16/07/2015 |
CIRCULAR :Providing and maintaining 33/11KV Substation & HT Line Capacitors |
 File size: (1.30 MB, PDF) |
| 22 |
CE(Dist.)/R-III/Tenders/24267 |
28/05/2015 |
Agricultural Pump energization -Sub Division wise tender orders to be places at circle level-powers for Price Negotiations thereof |
 File size: (1.14 MB, PDF) |
| 21 |
CE(Dist.)/RE-III/Tenders/22784 |
21/05/2015 |
Modification in guidelines in common tender documents for Ag pump energization |
 File size: (46.06 KB, PDF) |
| 20 |
CE(Dist.)/D-IV/Unemployed Engrs Scheme/22200 |
15/05/2015 |
CIRCULAR :Allocation of Works by Lottery System to Unemployed Engineers |
 File size: (773.80 KB, PDF) |
| 19 |
CE(Dist.)/R-III/21521 |
08/05/2015 |
Action Plan for improvement in pro-active response/detail monitoring of various issues by Executive Engineer |
 File size: (1.26 MB, PDF) |
| 18 |
CE(Dist.)/D-III/EHV/Circular/27960 |
06/09/2014 |
Guidelines for framing proposals regarding Establishment of new EHV substations / Augmentation / Additional Power Transformers. |
 File size: (1.71 MB, PDF) |
| 17 |
CE(Dist.)/RE-III/Tenders/19875 |
20/06/2014 |
Guidelines for submission of proposals to AG. Turnkey Contracts.. |
 File size: (1.34 MB, PDF) |
| 16 |
CE(Dist.)/RE-III/Circular/16375 |
28/05/2014 |
Guidelines for Use of RSJ pole for erection of Transformer DP Structure. |
 File size: (48.98 KB, PDF) |
| 15 |
CE(Dist.)RE-1/Ag.PUMP/15531 |
19/05/2014 |
Chronological Order for releasing Ag Pump Connections. |
 File size: (38.58 KB, PDF) |
| 14 |
CE(Dist.)/RE-III/Tenders/20016 |
16/04/2015 |
Forwording of sample total turnkey tender document for Ag.pump energization. |
 File size: (1.14 MB, PDF) |
| 13 |
CE(Dist.)/RE/Ag.Pump/4900 |
12/02/2014 |
Revise Guidelines for releasing of new Agriculture connections. . . clarification thereof. |
 File size: (941.93 KB, PDF) |
| 12 |
Dir(proj)/3090 |
30/01/2014 |
Execution of paid pending Ag pump Energisation works under full turnkey contract |
 File size: (1,007.79 KB, PDF) |
| 11 |
CE(Dist.)/RE/Ag.Pump/3030 |
29/01/2014 |
Revise Guidelines for releasing of new Agriculture connections.. |
 File size: (902.66 KB, PDF) |
| 10 |
CE(Infra)/30208 |
11/11/2013 |
Inspection of Ag Pump energization works.. |
 File size: (637.53 KB, PDF) |
| 9 |
CEC/Coporate/BND 0240 |
25/02/2013 |
Enhancement in the limit of expenditure on hiring of vehicles for flying squads. |
 File size: (1.08 MB, PDF) |
| 8 |
CE/DIST-III/SOC/24500 |
30/08/2012 |
Revision in Schedule of Charges. |
 File size: (2.76 MB, PDF) |
| 7 |
CE/Dist/D-III/16037 |
08/06/2012 |
Redelegation of powers for technical sanction for works related to LT & HT connections under all schemes. |
 File size: (2.24 MB, PDF) |
| 6 |
CE/Dist/D-III/15754 |
06/06/2012 |
Requirement of adequate land for Distribution Transformer Centers and Substations while releasing connection to bigger societies/builders. |
 File size: (1.36 MB, PDF) |
| 5 |
CE(Dist)/D-III/Circular/25680 |
19/06/2008 |
Procedure to plan for electrifying areas preparation of schemes (DPRs) and releasing new connections |
 File size: (40.37 KB, PDF) |
| 4 |
CE(Dist)/D-III/Circular/25680 |
19/06/2008 |
राज्यातील निरनिराळ्या भागांच्या विद्युतीकरणासाठी योजना आखणे , तपशीलवार प्रकल्प अहवाल तयार करणे नवीन विद्युत जोडण्या देणे यासाठीची कार्यपद्धती |
 File size: (64.92 KB, PDF) |
| 3 |
क्र. मु.अ. (वितरण)/डी-३/परिपत्रक /२२१९७ |
20/05/2008 |
नवीन सेवा जोडण्या देण्याकरिता व क्षमता वाढ करण्याकरिता मार्गदर्शक सूत्रे |
 File size: (54.83 KB, PDF) |
| 2 |
CE(Dist)/D-III/Circular/22197 |
20/05/2008 |
Guidelines for releasing new connections and augmentation |
 File size: (81.54 KB, PDF) |
| 1 |
Ref : CE/Dist/D-III/MERC/ |
03/09/2007 |
Refund of meter cost |
 File size: (94.10 KB, PDF) |