| Implementation of updated Technical Specifications of Energy Efficiency Level-II Distribution Transformers and stoppage of use of Energy Efficiency Level-I Distribution Transformers (Size: 371.20 KB, Format: PDF) |
29/09/2025 |
| Implementation of updated Technical Specifications of Energy Efficiency Level-II Distribution Transformers and stoppage of use of Energy Efficiency Level-I Distribution Transformers (Size: 824.61 KB, Format: PDF) |
10/06/2025 |
| Implementation of updated Technical Specifications of Energy Efficiency Level-II Distribution Transformers and stoppage of use of Energy Efficiency Level-I Distribution Transformers (Size: 666.79 KB, Format: PDF) |
22/04/2025 |
| Circular No-14 Auto approval of contract demand reduction for HT consumers (Size: 1.09 MB, Format: PDF) |
27/05/2024 |
| Approved agencies for supply of LT/HT Meters directly to consumers (Size: 6.36 MB, Format: PDF) |
07/11/2023 |
| Circular No-13 Guidelines for connecting HV spare cables in parallel with the Main cable (Size: 1.10 MB, Format: PDF) |
30/08/2020 |
| Earthing of HT Metering Cubicle (Size: 545.49 KB, Format: PDF) |
16/01/2020 |
| Circular No-11 Failure of Power Transformers and need to follow maintenance schedule thereof (Size: 1.77 MB, Format: PDF) |
21/07/2020 |
| Implementation of CEA guideline for Validity period of type test (Size: 871.82 KB, Format: PDF) |
22/06/2020 |
| Testing Circular -09 Utilizing dry type resin cast Metering/protection CTs &PTs and stoppage of oil filled CTs/PTs in r/o MSEDCL’s HT consumer and Substations thereof (Size: 741.94 KB, Format: PDF) |
18/06/2020 |
| MSEDCL TESTING CIRCULAR REGARDING STANDARD CT RATIO (Size: 1.73 MB, Format: PDF) |
14/05/2020 |
| Revised Guidelines regarding Metering in respect of HT/EHV/Open Access consumers (Size: 1.81 MB, Format: PDF) |
25/02/2020 |
| Utilization of ABT meter (SEM) for HT roof-top Solar Generation projects (Size: 831.31 KB, Format: PDF) |
25/02/2020 |
| Approval for use of latest technology material in MSEDCL i.e. Natural Ester, HT Covered conductor and Fault Passage Indicator (Size: 2.34 MB, Format: PDF) |
04/12/2019 |
| Amendment AB switch circular (Size: 813.22 KB, Format: PDF) |
26/11/2019 |
| Circular for Stipulation of Transformer Capacity while load sanction in respect of HT consumers (Size: 851.27 KB, Format: PDF) |
12/04/2019 |
| Inspection and testing of electrical installations upto notified voltage as per Reg.30 & Reg. 43 of CEA (Measures relating to Safety and Electric Supply) Regulations 2010, amended on 2015 and amended on 2018.Circular for Stipulation of Transformer Capacity while load sanction in respect of HT consumers (Size: 2.67 MB, Format: PDF) |
19/08/2019 |
| Providing AB switches at 11/22/33kV HT consumers Installation for isolation. (Size: 1.24 MB, Format: PDF) |
19/08/2019 |
| Circular : Guidelines for proper installation of 40-200Amp CT Embedded Energy Meter for avoiding the PT missing event (Size: 1.59 MB, Format: PDF) |
29/10/2018 |
| Circular-Guidelines for observing electrical safety and reduction in Accidents thereof (Size: 3.50 MB, Format: PDF) |
24/08/2018 |
| Circular- Utilization of existing installed ABT meter (SEM) as Net meter for Soalar rooftop projects (Size: 928.73 KB, Format: PDF) |
26/04/2018 |
| Circular- Guidelines regarding Metering in respect of HT/EHV consumers (Size: 3.23 MB, Format: PDF) |
16/04/2018 |
| Circular reagarding guidelines for keeping spare metering CTs and PTs in r/o EHV consumers/Generators (Size: 2.12 MB, Format: PDF) |
20/01/2018 |
| Implementation of revised energy performance standard for Distribution Transformers up to 2500 KVA rating (Size: 1.10 MB, Format: PDF) |
28/04/2017 |
| Guidelines for ensuring separate earthing of solar roof-top PV project and safety thereof (Size: 140.98 KB, Format: PDF) |
03/08/2016 |