| 1 |
General Guidelines for the consumers desiring connectivity of Roof-top Renewable Energy Generating System with MSEDCL’s Network under MERC Net Metering Regulations, 2015 |
 File size: (96.99 KB, PDF) |
| 2 |
ANNEXURE-1 Procedure for Net Metering |
 File size: (11.30 KB, PDF) File size: (11.30 KB, PDF) |
| 3 |
ANNEXURE-2 Application Form |
 File size: (11.30 KB, PDF) File size: (11.30 KB, PDF) |
| 4 |
ANNEXURE-3 Net Metering Connection Agreement |
 File size: (17.60 KB, PDF) |
| 5 |
Commercial Circular 258: Connectivity to the Distribution network of MSEDCL for Consumers installing solar PV projects/systems below 1 MW on Rooftop or any mounting structure in their premises under the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015— Procedure for Application, methodology for Metering & Billing, etc. |
 File size: (9.72 MB, PDF) |
| 6 |
Commercial Circular No.276: (Amendment to Commercial Circular No.258) |
 File size: (136.70 KB, PDF) |
| 7 |
Commercial Circular No.307 (Second Amendment to Commercial Circular No.258) |
 File size: (387.93 KB, PDF) |
| 8 |
Commercial Circular No.310 (Third Amendment to Commercial Circular No.258) |
 File size: (768.29 KB, PDF) |