Skip to main content

Maharashtra State Electricity Distribution Co. Ltd.

पुण्यश्लोक

Tenders

Corrigendum-1 to the RfS Document for Tender of Medium Term (5 years) through Battery Energy Storage Systems (BESS) of 1000 MW/4000 MWh (1 Cycle/Day) with 500 MW/2000MWh Green Shoe Option for MSEDCL Under Tariff-Based Competitive Bidding

(Click here to view)
(Size: 1.09 MB, Format: PDF)
Language: English
msedcl_logo
Urja

Empowering the Consumer