Statistics of LT New Service connections (Non AG) Applications from 01-APR-2024

State Statistics of LT New Service connections (Non AG) Applications
Report generated as on 18-Jul-2025
Service Infra Status Area Notified Timeline (Days) Number Of Applications Received Number Of Applications Approved Maximum (Days) Minimum (Days) Mean (Days) Mode (Days) Median (Days) Compliance
Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 40978 39650 85 1 13 9 9 97%
Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 173216 162734 103 1 27 39 24 94%
Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 31343 29746 98 2 21 21 18 95%
Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 61120 48622 106 7 24 10 18 80%
Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 33564 21690 101 23 49 60 53 65%
Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 4672 3189 103 18 39 44 40 68%
Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 363 338 56 13 16 13 14 93%
Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1783 1613 101 30 30 30 30 90%
Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 243 224 74 34 34 34 34 92%
Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 374 280 74 18 21 23 21 75%
Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 246 155 99 75 75 75 75 63%
Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 27 17 26 6 14 6 14 63%
Statistics of LT New Service connections (Non AG) Applications
Report generated as on 18-Jul-2025
Region Zone Circle Division Service Infra Status Area Notified Timeline (Days) Number Of Applications Received Number Of Applications Approved Maximum (Days) Minimum (Days) Mean (Days) Mode (Days) Median (Days) Compliance
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 334 287 27 0 2 0 1 86%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1879 1643 78 0 7 2 5 87%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 6 6 11 0 2 0 1 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 20 17 32 0 6 0 4 85%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 677 638 95 0 7 1 4 94%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 543 477 54 0 12 6 8 88%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 4 4 12 1 5 1 4 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 4 3 11 6 8 6 6 75%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 3216 2903 36 0 11 7 10 90%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 58 23 62 2 24 8 22 40%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 20 20 32 3 13 7 11 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 22 22 22 22 22 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL II DIVN Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1423 1298 78 0 12 7 10 91%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL II DIVN Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 99 33 45 0 24 18 18 33%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL II DIVN Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 6 30 0 9 9 6 86%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1296 1230 78 0 11 7 8 95%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 221 40 81 0 11 0 6 18%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 3 0 1 0 1 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 0 0 0 0 0 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE Sillod Division Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 848 831 47 0 7 2 7 98%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE Sillod Division Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 68 33 85 2 40 35 35 49%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 396 362 28 0 4 1 3 91%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION I Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 2867 2622 66 0 5 1 3 91%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION I Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 5 5 5 5 5 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 823 805 100 0 5 0 3 98%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1578 1426 89 0 18 10 14 90%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 2 9 6 8 6 8 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 9 9 9 9 9 50%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 344 334 47 0 8 2 5 97%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1037 731 86 0 20 7 14 70%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 0 0 0 0 0 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 3 19 1 10 1 9 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 724 631 83 0 9 1 6 87%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 737 441 88 0 13 3 8 60%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 7 20 0 6 6 6 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 881 693 84 0 12 1 8 79%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 338 196 91 0 23 17 19 58%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 8 8 44 0 10 0 1 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 3 24 5 14 5 13 75%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 355 307 68 0 11 2 8 86%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 610 458 70 0 12 4 9 75%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 19 1 9 1 7 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 195 189 71 0 10 0 8 97%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 172 171 33 0 6 7 7 99%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 875 715 89 0 14 1 12 82%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 982 909 64 0 8 1 6 93%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 10 10 10 10 10 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 4 19 1 7 1 4 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 7 7 15 0 6 0 5 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 494 448 59 0 14 2 12 91%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1002 550 73 0 24 26 22 55%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 1 1 1 1 1 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 4 6 0 2 0 1 67%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 754 692 90 0 17 3 12 92%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 913 604 75 0 17 1 15 66%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 4 41 0 17 0 14 67%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 16 16 16 16 16 50%
CH. SAMBHAJINAGAR REGION NANDED ZONE HINGOLI CIRCLE HINGOLI DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1919 1849 98 0 11 7 8 96%
CH. SAMBHAJINAGAR REGION NANDED ZONE HINGOLI CIRCLE HINGOLI DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 22 17 79 0 30 0 26 77%
CH. SAMBHAJINAGAR REGION NANDED ZONE HINGOLI CIRCLE HINGOLI DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 8 0 3 0 1 75%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE BHOKAR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1373 1330 85 0 10 2 6 97%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE BHOKAR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 60 53 84 3 31 25 25 88%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE BHOKAR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 28 9 20 9 23 75%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1412 1367 101 0 15 4 11 97%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 15 3 44 11 32 11 41 20%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 8 1 5 1 6 75%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 3 3 3 3 3 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 63 61 49 1 12 4 9 97%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1713 1680 87 0 11 2 7 98%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 2 1 6 6 6 6 6 50%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 11 5 73 11 27 11 17 45%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 7 7 25 0 7 0 4 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 921 872 99 0 7 1 5 95%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 22 10 55 4 16 9 9 45%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 1 0 0 0 0 0 50%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1217 1192 95 0 24 16 16 98%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 453 442 93 0 21 8 17 98%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 35 4 73 23 44 23 41 11%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 3 2 47 18 33 18 33 67%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 1 15 15 15 15 15 50%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 4 4 54 4 31 4 34 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1685 1557 98 0 17 0 9 92%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 23 3 32 4 20 4 25 13%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 0 0 0 0 0 0 0%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 1 1 1 1 1 100%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2134 1974 61 0 5 1 3 93%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 132 84 53 1 10 1 2 64%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 74 66 71 0 13 1 7 89%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 10 5 55 0 25 0 20 50%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1318 1256 53 0 8 2 6 95%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 55 12 55 7 26 13 24 22%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 73 73 47 0 7 0 1 100%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 0 0 0 0 0 0 0%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 4861 4599 72 0 9 4 8 95%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 448 285 69 3 28 26 26 64%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 44 36 48 0 14 0 12 82%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 3 31 13 20 13 17 60%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2061 1972 50 0 4 1 3 96%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 90 70 42 1 19 35 12 78%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 38 34 28 0 5 3 3 89%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 1 27 27 27 27 27 33%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 611 596 20 0 4 1 3 98%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1803 1167 75 0 7 4 5 65%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 16 15 8 0 2 1 1 94%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 14 10 46 0 8 1 4 71%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 462 460 15 0 3 1 2 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1248 1162 66 0 5 3 4 93%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 12 12 7 0 2 0 1 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 24 22 38 0 4 2 2 92%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 291 278 19 0 2 0 1 96%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 179 165 21 0 3 1 2 92%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 11 11 20 0 4 1 1 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 3 2 35 0 18 0 18 67%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 193 189 14 0 2 1 1 98%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1894 1742 71 0 16 0 8 92%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 18 17 9 0 1 0 0 94%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 16 12 69 0 14 1 4 75%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 406 399 8 0 2 2 2 98%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 3590 2495 94 0 9 0 5 69%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 22 22 4 0 2 1 1 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 34 22 15 0 3 0 1 65%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 3548 3319 42 0 5 2 3 94%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1628 1619 89 0 16 7 10 99%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 68 62 56 0 11 2 6 91%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 21 16 55 0 14 1 9 76%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1036 1011 37 0 4 1 3 98%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2455 2407 28 0 5 3 4 98%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2250 1958 70 0 9 1 6 87%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 2108 1765 49 0 8 2 5 84%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 36 33 35 0 4 1 1 92%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 47 47 25 0 4 2 3 100%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 50 42 68 0 13 0 11 84%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 24 22 45 0 8 3 5 92%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 810 800 43 0 6 2 5 99%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 3240 2932 78 0 7 1 5 90%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 18 18 53 0 13 2 6 100%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 40 34 69 0 11 1 6 85%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 929 847 84 0 11 7 8 91%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 53 16 62 0 23 0 20 30%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 547 498 75 0 18 0 16 91%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 742 708 87 0 14 2 10 95%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 18 6 72 0 39 0 35 33%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 28 17 9 2 6 7 7 61%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 30 30 30 30 30 100%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 1 0 0 0 0 0 0 0%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 899 828 92 0 13 1 8 92%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 174 118 79 0 13 12 12 68%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 10 10 10 10 10 100%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE BHUSAWAL UCR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1113 926 74 0 25 10 24 83%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE BHUSAWAL UCR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 156 43 60 1 29 29 29 28%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE BHUSAWAL UCR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 12 0 6 0 6 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE CHALISGAON DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1010 989 71 0 8 3 5 98%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE CHALISGAON DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 60 33 44 1 11 4 4 55%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE CHALISGAON DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 2 0 0 0 0 0 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE DHARANGAON DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1618 1566 98 0 19 4 17 97%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE DHARANGAON DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 39 9 68 0 29 40 26 23%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE DHARANGAON DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 17 16 23 4 11 6 6 94%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 364 354 100 0 20 8 18 97%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1119 1074 81 0 13 0 8 96%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 32 5 56 6 25 6 24 16%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 122 37 74 0 28 17 17 30%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 47 46 74 0 11 0 5 98%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 430 337 98 0 25 6 20 78%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 22 11 32 0 10 2 2 50%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 9 9 9 9 9 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 834 794 77 0 16 8 13 95%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 23 6 74 1 25 1 19 26%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 67 1 28 1 22 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 23 23 23 23 23 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE SAVADA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1340 1285 94 0 18 4 14 96%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE SAVADA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 54 44 90 1 27 19 20 81%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 885 815 83 0 16 5 11 92%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 56 8 75 6 27 6 24 14%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 9 39 0 12 0 3 90%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 49 49 49 49 49 100%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE SHAHADA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 634 622 64 0 7 1 3 98%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE SHAHADA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 566 13 79 6 36 6 32 2%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE SHAHADA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 22 11 17 18 18 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1147 1114 26 0 4 2 3 97%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 121 117 21 1 5 1 4 97%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 22 20 7 0 3 1 2 91%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 2 2 2 2 2 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 6845 6599 85 0 6 2 4 96%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 269 115 98 0 5 3 3 43%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 17 7 32 0 12 0 7 41%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 0 0 0 0 0 0 0%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2038 1886 54 0 5 3 3 93%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 9 8 37 7 17 10 14 89%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 22 22 7 0 2 0 1 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 9 9 9 9 9 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II BADLAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 4998 4840 53 0 7 3 5 97%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II BADLAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 106 81 65 2 15 7 10 76%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II BADLAPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 48 43 40 0 11 0 7 90%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II KALYAN RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 3856 3736 78 0 4 0 3 97%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II KALYAN RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 85 66 79 0 21 21 20 78%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II KALYAN RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 11 34 0 10 1 5 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1164 1129 84 0 9 4 7 97%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION I Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 40 0 0 0 0 0 0 0%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION I Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 4 4 42 0 27 0 34 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 2244 2083 68 0 5 0 2 93%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 130 17 37 0 21 0 23 13%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 31 27 27 0 6 0 3 87%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 7 1 3 3 3 3 3 14%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 9732 8773 88 0 11 3 8 90%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 315 148 85 0 18 15 15 47%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 147 129 101 0 11 0 2 88%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 2 22 7 15 7 15 40%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1256 1075 72 0 17 5 13 86%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 6534 6143 67 0 6 1 4 94%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 26 4 23 16 20 16 20 15%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 245 180 69 1 33 5 27 73%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 25 19 95 0 30 24 24 76%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 27 23 29 0 6 1 2 85%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 45 0 23 0 23 100%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 4 2 1 0 1 0 1 50%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 7339 6969 98 0 5 2 4 95%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 443 159 98 0 18 3 12 36%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 77 70 60 0 7 6 6 91%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 2 2 26 2 14 2 14 100%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1144 1053 51 0 9 2 6 92%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 410 217 89 1 11 4 5 53%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 34 1 17 1 15 100%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 3 99 4 42 4 22 75%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1272 1177 75 0 8 2 5 93%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 203 42 85 3 20 36 15 21%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 37 32 39 1 13 1 13 86%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 19 19 19 19 19 50%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2019 1864 78 0 9 3 6 92%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 426 72 98 0 21 8 12 17%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 113 101 44 0 10 0 6 89%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 8 4 33 0 12 0 7 50%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1382 1258 70 0 9 2 6 91%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 168 87 80 0 22 27 25 52%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 61 47 70 0 16 9 9 77%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 3 43 0 15 0 2 50%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1115 1012 81 0 14 2 10 91%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 154 61 90 3 30 39 27 40%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 80 75 75 0 16 4 12 94%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 6 59 1 29 1 35 86%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1386 1331 59 0 11 7 8 96%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 113 50 76 0 27 5 20 44%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 3 24 3 11 3 7 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 26 26 26 26 26 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1029 955 74 0 9 0 7 93%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1736 1678 87 0 10 7 8 97%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 146 52 100 0 28 14 21 36%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 66 23 66 0 21 24 20 35%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 30 0 11 0 10 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 7 7 34 1 11 1 7 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 2 30 15 23 15 23 50%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE KARJAT (R) DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1226 1156 73 0 7 0 5 94%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE KARJAT (R) DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 132 83 99 0 26 0 21 63%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE KARJAT (R) DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 4 4 4 4 4 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SANGEMNER DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2518 2452 79 0 9 0 6 97%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SANGEMNER DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 366 300 76 0 7 0 3 82%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SANGEMNER DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 9 29 2 9 5 6 90%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SHRIRAMPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1327 1311 65 0 6 1 4 99%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SHRIRAMPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 77 55 75 0 13 2 7 71%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SHRIRAMPUR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 20 0 3 0 0 100%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE KALWAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 538 500 64 0 5 0 3 93%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE KALWAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 48 35 87 0 6 1 1 73%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE KALWAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 13 13 7 0 2 2 2 100%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 347 334 59 0 16 18 14 96%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 276 234 73 2 21 21 18 85%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 27 15 68 4 21 4 18 56%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 27 9 44 6 31 44 40 33%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 33 6 18 6 14 75%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 1 1 34 34 34 34 34 100%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MANMAD RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 867 746 88 0 16 14 14 86%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MANMAD RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 25 14 42 6 22 6 14 56%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MANMAD RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 8 8 8 8 8 100%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE SATANA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 521 458 53 0 12 0 10 88%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE SATANA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 62 35 60 0 10 0 1 56%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE SATANA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 3 13 5 10 13 13 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1013 980 45 0 7 6 6 97%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 138 51 76 0 20 26 13 37%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 7 15 2 5 2 5 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2406 2333 80 0 7 1 5 97%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 713 472 89 0 16 7 8 66%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 14 11 16 1 6 1 4 79%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 73 19 46 19 46 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2281 2255 11 0 1 0 0 99%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. I Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 185 154 71 0 3 0 0 83%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. I Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 7 6 5 0 1 0 0 86%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 5268 5065 33 0 2 1 1 96%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2192 2103 67 0 6 4 4 96%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 474 380 69 0 6 1 2 80%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 415 365 77 0 12 4 9 88%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 11 10 2 0 1 1 1 91%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 7 9 0 3 0 1 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 3 3 3 3 3 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 3 8 3 5 3 5 60%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1321 1138 103 0 27 11 22 86%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 73 22 94 0 49 52 45 30%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 9 7 60 1 25 1 20 78%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 37 37 37 37 37 100%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1113 956 92 0 19 8 14 86%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 166 36 103 8 39 21 21 22%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 7 5 14 0 4 0 1 71%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOT DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 857 723 98 0 20 6 14 84%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOT DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 64 11 85 4 37 20 21 17%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOT DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 28 4 13 4 6 75%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE BULDHANA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1230 1176 94 0 15 0 11 96%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE BULDHANA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 80 45 98 0 34 9 29 56%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE BULDHANA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 27 0 8 0 2 100%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1056 998 93 0 22 6 17 95%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 138 40 83 1 34 3 39 29%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 4 7 0 3 0 2 80%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 17 17 17 17 17 100%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE MALKAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1145 1084 93 0 25 11 21 95%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE MALKAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 71 38 87 13 42 38 39 54%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE MALKAPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 0 0 0 0 0 100%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE Mehkar Division Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1215 1142 86 0 23 8 18 94%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE Mehkar Division Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 85 7 70 0 36 53 53 8%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE Mehkar Division Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 26 18 23 18 24 100%
NAGPUR REGION AKOLA ZONE WASHIM CIRCLE WASHIM DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1856 1644 102 0 27 39 24 89%
NAGPUR REGION AKOLA ZONE WASHIM CIRCLE WASHIM DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 77 17 88 0 24 14 18 22%
NAGPUR REGION AKOLA ZONE WASHIM CIRCLE WASHIM DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 4 24 0 13 0 13 80%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE ACHALPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2223 2066 69 0 14 7 11 93%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE ACHALPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 83 26 89 0 43 12 43 31%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE ACHALPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 14 14 27 1 7 2 4 100%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1204 1150 71 0 12 0 9 96%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 117 32 91 0 38 35 38 27%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 2 1 0 1 0 1 100%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 10 10 10 10 10 50%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1886 1803 75 0 13 6 9 96%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 144 51 65 0 14 8 8 35%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 8 8 31 0 10 0 5 100%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 18 18 18 18 18 100%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE MORSHI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 978 953 66 0 9 1 6 97%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE MORSHI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 66 40 73 3 35 11 31 61%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE MORSHI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 10 0 3 2 2 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1270 1220 87 0 15 3 12 96%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 62 25 60 0 25 12 19 40%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 6 6 6 6 6 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 21 21 21 21 21 50%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1364 1291 80 0 15 9 14 95%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 49 16 64 0 34 47 30 33%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 9 6 26 2 15 2 16 67%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 3 3 3 3 3 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PUSAD DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1546 1368 84 0 17 15 16 88%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PUSAD DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 66 40 81 0 36 25 30 61%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PUSAD DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 8 5 16 2 11 16 15 63%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 841 828 80 0 14 3 11 98%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 100 73 64 0 16 28 14 73%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 13 13 14 0 4 1 1 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1744 1625 77 0 11 7 11 93%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 133 87 97 0 20 12 13 65%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 19 17 26 0 7 0 4 89%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 30 30 30 30 30 100%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 724 669 53 0 11 0 9 92%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 763 716 69 0 9 3 7 94%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 28 5 90 10 34 10 23 18%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 48 10 49 0 20 29 17 21%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 17 15 18 0 4 0 2 88%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 4 4 27 4 13 4 11 100%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1020 946 84 0 13 9 11 93%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 73 12 39 0 19 6 22 16%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 12 9 10 1 6 4 4 75%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 1 47 47 47 47 47 33%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1528 1456 66 0 13 8 12 95%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 44 30 67 0 16 0 13 68%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 9 65 1 14 7 7 90%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 52 52 52 52 52 100%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1011 988 18 0 4 1 2 98%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 45 24 67 0 13 0 3 53%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 19 18 6 0 3 3 3 95%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 3 1 2 1 2 100%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1372 1238 50 0 10 6 8 90%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 39 23 82 0 29 19 31 59%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 132 119 42 0 13 6 9 90%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 9 5 27 1 14 1 17 56%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE BHANDARA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1774 1673 103 0 12 6 9 94%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE BHANDARA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 93 29 83 0 27 0 24 31%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE BHANDARA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 13 10 18 0 6 0 5 77%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE SAKOLI O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 663 629 33 0 5 2 4 95%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE SAKOLI O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 46 17 57 0 26 0 22 37%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE SAKOLI O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 5 2 0 1 0 1 83%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE DEORI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1025 887 70 0 13 6 10 87%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE DEORI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 176 121 76 0 16 6 10 69%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE DEORI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 8 8 14 1 5 1 4 100%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE GONDIA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1714 1544 79 0 12 4 8 90%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE GONDIA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 97 28 74 1 25 1 23 29%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE GONDIA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 19 17 41 0 8 1 3 89%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE KATOL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 650 628 38 0 5 1 4 97%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE KATOL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 41 26 101 1 23 1 17 63%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE KATOL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 5 0 3 2 2 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2593 2423 77 0 7 0 6 93%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 65 14 88 4 41 41 41 22%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 21 21 42 1 11 4 8 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 1 41 41 41 41 41 14%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE SAONER DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1097 1044 47 0 6 2 5 95%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE SAONER DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 86 46 78 0 16 6 12 53%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE SAONER DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 14 14 13 0 3 0 2 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 865 819 23 0 3 1 2 95%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 41 11 78 0 34 46 40 27%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 43 42 11 0 2 1 1 98%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 244 229 5 0 0 0 0 94%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1761 1664 52 0 4 2 3 94%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 85 77 24 0 6 6 6 91%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 82 70 76 0 14 11 11 85%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 2 2 0 0 0 0 0 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 33 32 8 0 2 1 2 97%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 0 0 0 0 0 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 3 43 0 14 0 0 50%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1360 1328 22 0 1 1 1 98%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 863 804 57 0 2 2 1 93%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 12 12 18 0 2 1 1 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 3 3 3 0 1 0 1 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1281 1260 33 0 1 0 1 98%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2263 2191 91 0 4 1 3 97%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 38 34 45 0 15 1 14 89%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 86 64 42 0 10 18 5 74%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 11 11 15 0 2 0 0 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 7 6 0 3 1 3 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR GANDHIBAUG DIV. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1618 1562 34 0 1 1 1 97%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR GANDHIBAUG DIV. Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 10 8 46 0 11 0 6 80%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR GANDHIBAUG DIV. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 6 6 2 0 1 1 1 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR MAHAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1888 1859 34 0 2 1 1 98%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR MAHAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 90 64 68 0 15 10 13 71%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR MAHAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 13 13 27 0 4 1 2 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 587 567 61 0 6 1 4 97%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 59 34 81 1 34 23 28 58%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 3 0 2 1 2 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 1 1 1 1 1 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 751 721 30 0 5 4 4 96%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 50 20 56 3 33 8 33 40%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 17 0 9 17 10 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 16 16 16 16 16 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1251 1219 38 0 6 4 5 97%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 101 50 68 0 19 0 17 50%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 23 20 13 0 5 2 3 87%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 13 13 13 13 13 50%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2027 1864 83 1 11 7 9 92%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 580 374 98 0 19 6 14 64%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 43 18 29 18 27 75%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2481 2299 71 0 12 13 11 93%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 357 66 70 2 24 15 19 18%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 16 11 35 0 13 5 5 69%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 4 31 0 9 0 2 80%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE SASWAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 846 766 75 0 9 1 7 91%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE SASWAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 563 306 70 0 17 12 12 54%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE SASWAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 1 0 0 0 0 0 50%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2119 2008 66 0 8 1 6 95%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 177 51 73 1 21 14 14 29%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 33 0 8 1 3 100%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 1 28 28 28 28 28 33%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1526 1433 51 0 6 1 4 94%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 171 37 72 1 14 2 11 22%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 5 3 0 1 0 0 83%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2072 2002 66 0 9 2 5 97%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 159 73 90 0 17 2 11 46%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 17 16 21 0 5 0 3 94%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 8 8 8 8 8 100%
PUNE REGION BARAMATI ZONE SATARA CIRCLE VADUJ DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1145 1048 91 0 12 4 10 92%
PUNE REGION BARAMATI ZONE SATARA CIRCLE VADUJ DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 144 25 69 5 27 25 25 17%
PUNE REGION BARAMATI ZONE SATARA CIRCLE VADUJ DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 48 47 28 0 1 1 1 98%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 861 808 56 0 10 5 8 94%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 90 32 100 6 27 7 21 36%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 18 18 48 0 10 16 6 100%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 7 27 0 10 11 11 100%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 949 904 59 0 5 3 3 95%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 210 43 50 0 22 27 26 20%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 2 5 1 3 1 3 100%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1723 1623 77 0 11 3 8 94%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 531 278 91 0 23 12 18 52%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 8 7 7 1 3 1 1 88%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1863 1736 67 0 9 0 7 93%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 694 282 92 0 24 24 20 41%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 27 19 20 0 6 6 6 70%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 2 0 0 0 0 0 29%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2060 1954 103 0 11 5 7 95%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 652 380 91 0 19 6 13 58%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 9 9 34 0 14 10 10 100%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 3 18 2 11 2 14 50%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1907 1819 50 0 5 2 3 95%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 563 406 87 0 10 5 7 72%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 7 7 10 0 4 0 2 100%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 1 0 0 0 0 0 0 0%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE GADHINGLAJ DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 983 945 27 0 5 2 4 96%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE GADHINGLAJ DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 372 209 100 1 27 60 19 56%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE GADHINGLAJ DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 11 34 0 6 0 1 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 379 369 14 0 2 1 2 97%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 694 674 26 0 3 1 2 97%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 49 5 48 12 23 16 16 10%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 93 60 50 2 21 15 15 65%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 17 2 7 2 5 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 2 2 2 1 2 1 2 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1355 1304 28 0 5 1 4 96%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 210 115 85 0 19 5 11 55%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 13 13 13 0 5 0 5 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL I DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1956 1886 30 0 5 1 3 96%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL I DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 260 57 97 2 32 4 22 22%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL I DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 11 6 1 2 1 1 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2416 2321 25 0 4 1 2 96%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 405 270 92 1 19 4 10 67%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 17 17 23 0 8 5 7 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 7 4 6 4 6 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1861 1825 86 0 3 1 2 98%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 157 47 30 1 7 2 6 30%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 9 9 12 0 5 1 6 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1187 1146 24 0 6 1 5 97%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 109 33 59 1 16 7 12 30%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 2 7 4 6 4 6 67%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 23 18 21 18 21 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 958 924 33 0 8 3 6 96%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 440 75 77 1 24 25 24 17%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 25 25 25 25 25 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 75 75 75 75 75 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1275 1232 51 0 6 1 4 97%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 190 75 85 1 21 3 13 39%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 31 5 11 7 7 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 12 12 12 12 12 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 836 807 23 0 3 1 2 97%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 1005 795 88 0 14 7 8 79%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 4 4 8 0 4 0 4 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 2 2 2 1 2 1 2 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1549 1479 79 0 6 1 5 95%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 314 135 92 0 24 8 17 43%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 26 25 21 0 4 1 2 96%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 39 39 39 39 39 50%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 842 841 40 0 6 1 6 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 10728 9176 99 0 19 9 12 86%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 2 2 7 1 4 1 4 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 37 22 59 0 14 0 6 59%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 75 75 8 0 3 1 1 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1900 1673 70 0 14 3 9 88%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 7 7 6 0 2 1 1 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 15 13 46 0 13 9 9 87%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 923 923 41 0 10 2 7 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 9425 5865 106 0 24 4 18 62%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 2 2 15 13 14 13 14 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 21 9 61 0 21 13 13 43%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 172 167 52 0 12 7 7 97%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 3937 2765 89 0 14 10 10 70%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 2 2 14 8 11 8 11 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 25 14 27 0 12 1 9 56%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1602 1527 75 0 9 2 7 95%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 164 96 87 2 21 4 14 59%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 6 19 0 10 0 9 86%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 1 60 60 60 60 60 33%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 9120 8706 77 0 10 5 8 95%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 499 364 82 0 15 5 12 73%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 9 41 8 17 8 12 82%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 6 30 8 13 10 10 86%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2350 2271 60 0 9 0 8 97%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 4885 4370 89 0 14 7 10 89%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 9 12 0 5 0 5 90%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 23 18 59 0 7 0 2 78%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2309 2300 41 0 7 2 5 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 3945 2957 91 0 13 9 10 75%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 3 3 6 0 3 0 2 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 5 4 33 2 17 2 16 80%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 844 830 26 0 4 2 2 98%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 3621 3230 88 0 12 1 9 89%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 5 5 15 1 6 4 4 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 10 8 74 0 17 0 7 80%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1589 1545 57 0 5 1 4 97%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1820 1667 80 0 8 2 5 92%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 3 3 35 0 16 0 13 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 8 8 72 3 21 3 17 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PARVATI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 438 437 16 1 8 9 8 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PARVATI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 3913 3226 91 0 15 6 11 82%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PARVATI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 15 12 31 3 19 23 21 80%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 239 233 37 0 5 1 3 97%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1832 1368 88 0 14 7 11 75%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 1 1 2 2 2 2 2 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 7 5 22 0 8 0 4 71%