Statistics of LT New Service connections (Non AG) Applications from 01-APR-2024

State Statistics of LT New Service connections (Non AG) Applications
Report generated as on 28-Aug-2025
Service Infra Status Area Notified Timeline (Days) Number Of Applications Received Number Of Applications Approved Maximum (Days) Minimum (Days) Mean (Days) Mode (Days) Median (Days) Compliance
Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 52573 51864 140 0 11 9 8 99%
Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 234655 225706 144 1 26 15 21 96%
Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 42809 41782 142 0 21 8 15 98%
Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 84816 73371 144 3 30 11 20 87%
Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 48389 35887 141 23 76 138 78 74%
Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 6897 5452 140 18 44 21 45 79%
Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 895 724 81 13 14 13 14 81%
Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2481 2168 125 30 32 30 30 87%
Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 655 431 124 1 23 6 27 66%
Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 904 647 138 18 61 18 61 72%
Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 362 239 115 75 75 75 75 66%
Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 79 42 69 2 24 6 14 53%
Statistics of LT New Service connections (Non AG) Applications
Report generated as on 28-Aug-2025
Region Zone Circle Division Service Infra Status Area Notified Timeline (Days) Number Of Applications Received Number Of Applications Approved Maximum (Days) Minimum (Days) Mean (Days) Mode (Days) Median (Days) Compliance
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 394 382 57 0 3 0 1 97%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2989 2704 123 0 8 2 5 90%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 10 9 25 0 4 0 0 90%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN I DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 23 23 33 0 8 0 4 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 852 836 107 0 7 1 4 98%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 979 797 86 0 11 1 7 81%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 18 7 12 0 3 1 2 39%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR (U) CIRCLE CH. SAMBHAJINAGAR URBAN II.DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 10 6 11 0 5 6 6 60%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 4575 4341 43 0 10 5 9 95%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 124 51 76 0 17 1 10 41%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 26 25 32 1 11 7 7 96%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL I DIVN. Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 3 88 18 43 18 22 60%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL II DIVN Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2344 2146 95 0 11 5 8 92%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL II DIVN Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 116 63 109 0 38 18 36 54%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE CH. SAMBHAJINAGAR RURAL II DIVN Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 8 8 30 0 10 9 9 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1818 1770 105 0 10 6 8 97%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 394 209 99 0 29 0 17 53%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 13 6 3 0 1 1 1 46%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE KANNAD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 3 0 0 0 0 0 75%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE Sillod Division Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1221 1181 58 0 7 2 6 97%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE CH. SAMBHAJINAGAR CIRCLE Sillod Division Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 71 53 85 2 47 35 57 75%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 594 531 34 0 6 1 4 89%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION I Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 3771 3637 101 0 5 1 3 96%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION I Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 1 5 5 5 5 5 33%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1076 1057 100 0 7 0 3 98%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1887 1690 130 0 19 10 14 90%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 3 9 0 5 0 6 100%
CH. SAMBHAJINAGAR REGION CH. SAMBHAJINAGAR ZONE JALNA CIRCLE JALNA DIVISION II Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 2 9 1 5 1 5 40%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 470 443 71 0 9 2 4 94%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1435 1220 126 0 23 2 16 85%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 2 0 0 0 0 0 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE AMBEJOGAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 3 19 1 10 1 9 60%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 975 911 116 0 12 1 7 93%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 830 595 123 0 19 3 10 72%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 8 20 0 5 0 4 80%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR BEED CIRCLE BEED DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1111 1010 117 0 14 1 9 91%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 794 631 125 0 23 15 17 79%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 9 8 44 0 10 0 1 89%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE DHARASHIV DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 8 7 24 1 9 13 6 88%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 402 363 68 0 13 2 9 90%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1154 913 92 0 14 3 8 79%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 19 1 9 1 7 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR DHARASHIV CIRCLE TULJAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 1 1 1 1 1 50%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 233 232 124 0 12 0 8 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 187 187 33 0 6 7 6 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1297 1136 111 0 15 1 13 88%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 1347 1312 64 0 7 1 5 97%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 10 10 10 10 10 100%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 6 4 2 1 2 2 2 67%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 5 19 1 6 1 5 83%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE LATUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 33 21 15 0 2 0 1 64%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 620 566 59 0 14 2 13 91%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1470 996 104 0 24 26 21 68%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 1 1 1 1 1 1 50%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE NILANGA DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 6 27 0 10 0 4 86%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 990 928 96 0 19 3 14 94%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1311 1129 126 0 23 1 17 86%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 6 41 0 20 0 14 60%
CH. SAMBHAJINAGAR REGION LATUR ZONE, LATUR LATUR CIRCLE UDGIR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 1 16 16 16 16 16 33%
CH. SAMBHAJINAGAR REGION NANDED ZONE HINGOLI CIRCLE HINGOLI DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2692 2563 112 0 11 2 8 95%
CH. SAMBHAJINAGAR REGION NANDED ZONE HINGOLI CIRCLE HINGOLI DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 30 22 109 0 32 0 24 73%
CH. SAMBHAJINAGAR REGION NANDED ZONE HINGOLI CIRCLE HINGOLI DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 27 0 8 0 4 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE HINGOLI CIRCLE HINGOLI DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE BHOKAR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1895 1854 118 0 11 2 6 98%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE BHOKAR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 78 58 92 3 31 24 25 74%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE BHOKAR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 53 4 23 4 23 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2156 2103 144 0 20 4 14 98%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 18 5 121 11 61 11 44 28%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 8 1 4 1 4 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE DEGLOOR DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 3 3 3 3 3 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 110 110 103 1 16 4 10 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 2286 2262 116 0 11 4 8 99%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 2 1 6 6 6 6 6 50%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 38 15 73 0 16 0 11 39%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 9 7 25 0 7 0 4 78%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1339 1311 134 0 10 1 6 98%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 31 18 123 0 22 9 11 58%
CH. SAMBHAJINAGAR REGION NANDED ZONE NANDED CIRCLE NANDED RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 2 4 0 2 0 2 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1595 1523 138 0 23 7 15 95%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 674 667 142 0 21 8 15 99%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 41 4 73 23 44 23 41 10%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 6 2 47 18 33 18 33 33%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 2 15 0 8 0 8 67%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE PARBHANI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 7 7 54 0 18 1 4 100%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1980 1892 108 0 16 0 8 96%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 30 10 91 0 23 11 11 33%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 0 0 0 0 0 0 0%
CH. SAMBHAJINAGAR REGION NANDED ZONE PARBHANI CIRCLE SELU DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 1 1 1 1 1 100%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2769 2694 116 0 5 1 3 97%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 162 124 90 1 17 1 8 77%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 86 82 71 0 14 1 8 95%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ALIBAUG DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 10 7 55 0 27 55 20 70%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1751 1689 83 0 7 2 5 96%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 72 38 136 1 48 95 35 53%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 89 87 47 0 6 0 1 98%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE GOREGAON DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 12 12 12 12 12 50%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 6733 6210 79 0 9 4 7 92%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 652 547 86 0 29 26 21 84%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 54 48 78 0 17 0 13 89%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE PANVEL RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 3 31 13 20 13 17 50%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2590 2479 50 0 4 1 3 96%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 117 86 51 1 21 35 14 74%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 45 42 28 0 6 3 3 93%
KOKAN REGION BHANDUP (U) ZONE PEN CIRCLE ROHA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 3 58 6 30 6 27 60%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 803 803 20 0 4 1 3 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2800 2440 75 0 10 4 6 87%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 39 32 8 0 2 1 1 82%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE BHANDUP URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 54 31 46 0 3 0 1 57%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 478 478 15 0 3 1 2 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2033 1925 85 0 5 3 4 95%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 33 27 7 0 1 0 1 82%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE MULUND DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 95 81 38 0 3 1 2 85%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 361 357 19 0 2 0 1 99%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 263 256 21 0 3 1 2 97%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 30 26 20 0 2 1 1 87%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-I Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 35 27 35 0 2 2 1 77%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 232 228 14 0 2 1 1 98%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2342 2154 71 0 15 0 8 92%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 22 22 9 0 1 0 0 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE THANE DIVISION-II Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 38 28 69 0 11 3 3 74%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 488 486 8 0 2 2 2 100%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 4412 4095 94 0 8 1 4 93%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 36 34 8 0 2 1 1 94%
KOKAN REGION BHANDUP (U) ZONE THANE (U) CIRCLE WAGLE ESTATE DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 55 36 107 0 6 0 1 65%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 4760 4730 42 0 4 1 3 99%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2177 2018 103 0 14 1 9 93%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 150 133 56 0 7 0 2 89%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE NERUL O DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 32 29 81 0 15 1 6 91%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1352 1310 37 0 4 1 3 97%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2830 2775 37 0 5 3 4 98%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2952 2611 122 0 9 1 6 88%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 4067 3111 117 0 10 2 6 76%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 59 46 81 0 5 1 1 78%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 51 50 25 0 4 2 3 98%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 95 78 68 0 9 0 5 82%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE PANVEL URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 40 32 45 0 8 3 5 80%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 837 832 43 0 6 2 4 99%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 4456 4232 118 0 7 1 5 95%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 21 20 53 0 12 2 6 95%
KOKAN REGION BHANDUP (U) ZONE WASHI CIRCLE WASHI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 133 84 69 0 7 1 4 63%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1342 1220 97 0 12 7 8 91%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 52 25 121 0 27 0 19 48%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 975 957 99 0 16 3 13 98%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1059 1040 112 0 15 2 9 98%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 30 17 74 0 38 0 36 57%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 23 21 44 1 7 7 7 91%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 30 30 30 30 30 100%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DHULE URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 8 3 1 0 0 0 0 38%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1447 1418 114 0 15 1 9 98%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 234 208 79 0 19 12 12 89%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 3 18 2 10 2 10 27%
KOKAN REGION JALGAON ZONE DHULE CIRCLE DONDAICHA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 35 35 35 35 35 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE BHUSAWAL UCR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1620 1528 121 0 22 10 17 94%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE BHUSAWAL UCR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 164 102 138 1 39 32 32 62%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE BHUSAWAL UCR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 12 0 6 0 6 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE BHUSAWAL UCR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE CHALISGAON DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1561 1508 107 0 9 1 5 97%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE CHALISGAON DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 97 41 56 0 13 4 4 42%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE CHALISGAON DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 3 1 0 0 0 0 60%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE DHARANGAON DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2450 2382 126 0 18 6 14 97%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE DHARANGAON DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 60 16 117 0 30 0 10 27%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE DHARANGAON DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 19 19 42 4 12 6 6 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE DHARANGAON DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 593 568 129 0 17 4 12 96%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1615 1595 124 0 11 0 6 99%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 39 8 71 6 37 31 31 21%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 196 91 125 0 44 6 45 46%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 4 4 4 4 4 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE JALGAON URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 74 63 74 0 9 0 3 85%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 859 628 104 0 21 12 16 73%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 39 13 50 0 13 2 10 33%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 1 9 9 9 9 9 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE MUKTAINAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1200 1167 129 0 15 3 12 97%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 32 11 74 1 26 1 20 34%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 67 1 24 1 8 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE PACHORA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 23 23 23 23 23 100%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE SAVADA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1718 1687 104 0 16 3 10 98%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE SAVADA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 61 53 90 1 32 19 23 87%
KOKAN REGION JALGAON ZONE JALGAON CIRCLE SAVADA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 1 0 0 0 0 0 0 0%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1210 1163 102 0 16 6 11 96%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 53 18 102 5 38 56 34 34%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 12 12 39 0 12 0 5 100%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE NANDURBAR (O) DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 49 49 49 49 49 100%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE SHAHADA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1123 1112 95 0 6 1 3 99%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE SHAHADA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 769 168 93 2 76 77 78 22%
KOKAN REGION JALGAON ZONE NANDURBAR CIRCLE SHAHADA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 22 1 12 1 15 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1442 1425 34 0 4 2 3 99%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 205 188 26 0 4 1 2 92%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 86 77 42 0 3 1 1 90%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I DOMBIVALI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 4 4 2 0 1 2 2 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 9601 9447 85 0 5 2 3 98%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 437 364 98 0 11 1 4 83%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 53 37 71 0 14 1 2 70%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN (EAST) DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 3 2 121 0 61 0 61 67%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2654 2617 54 0 5 3 3 99%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 311 69 119 3 12 10 10 22%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 44 38 14 0 2 0 1 86%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - I KALYAN URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 9 9 9 9 9 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II BADLAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 6291 6193 109 0 7 3 5 98%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II BADLAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 128 88 65 2 17 7 11 69%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II BADLAPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 61 56 40 0 11 0 7 92%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II KALYAN RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 5440 5349 78 0 4 0 2 98%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II KALYAN RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 129 101 139 0 17 1 12 78%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II KALYAN RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 20 18 34 0 8 3 4 90%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II KALYAN RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 1 1 1 1 1 100%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1535 1517 92 0 8 4 6 99%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION I Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 11 5 42 0 23 0 27 45%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 2861 2802 68 0 4 0 2 98%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 221 85 90 0 19 1 13 38%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 60 39 27 0 5 0 2 65%
KOKAN REGION KALYAN ZONE KALYAN CIRCLE - II ULHASNAGAR DIVISION II Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 12 6 69 1 24 1 12 50%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 12239 11663 102 0 11 3 7 95%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 307 204 128 0 26 15 15 66%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 206 166 125 0 14 0 2 81%
KOKAN REGION KALYAN ZONE PALGHAR (MINI) CIRCLE PALGHAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 4 22 5 14 22 15 67%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1567 1510 128 0 18 5 14 96%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 9575 9344 122 0 6 1 4 98%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 88 37 96 0 8 0 0 42%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 357 248 70 1 28 5 17 69%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 24 24 95 0 32 0 24 100%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 75 55 48 0 7 1 2 73%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 2 45 0 23 0 23 67%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VASAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 6 3 26 0 9 0 1 50%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 10286 9899 106 0 5 2 4 96%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 508 402 98 0 10 2 3 79%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 130 84 60 0 7 6 6 65%
KOKAN REGION KALYAN ZONE VASAI CIRCLE VIRAR O DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 3 2 26 2 14 2 14 67%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1467 1369 51 0 9 2 6 93%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 560 329 129 1 15 2 9 59%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 8 34 1 14 6 8 80%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE CHIPLUN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 3 99 4 42 4 22 75%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1633 1540 75 0 8 2 5 94%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 314 152 119 1 21 10 12 48%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 48 41 59 1 14 1 12 85%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE KHED DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 19 19 19 19 19 50%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2736 2583 78 0 9 3 6 94%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 438 127 140 0 44 138 24 29%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 137 130 93 0 11 0 6 95%
KOKAN REGION KOKAN ZONE,RATNAGIRI RATNAGIRI CIRCLE RATNAGARI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 11 5 33 0 15 0 8 45%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1777 1683 84 0 9 2 6 95%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 219 114 125 0 28 27 26 52%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 75 67 95 0 20 0 9 89%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KANKAVALI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 9 4 43 0 14 0 7 44%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1569 1417 113 0 15 1 10 90%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 258 149 124 3 46 39 40 58%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 94 84 85 0 18 4 13 89%
KOKAN REGION KOKAN ZONE,RATNAGIRI SINDUDURG CIRCLE KUDAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 11 9 59 0 23 34 34 82%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1988 1874 75 0 11 7 8 94%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 130 102 119 0 52 86 70 78%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 3 24 3 11 3 7 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 26 26 26 26 26 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1373 1339 79 0 9 0 7 98%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 2674 2654 122 0 9 1 6 99%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 255 132 137 0 26 32 19 52%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 92 42 91 0 21 12 15 46%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 6 30 0 9 0 6 86%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 20 12 34 0 7 0 3 60%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE AHILYANAGAR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 5 42 4 20 4 15 83%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE KARJAT (R) DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1685 1653 73 0 6 0 3 98%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE KARJAT (R) DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 190 155 102 0 29 17 21 82%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE KARJAT (R) DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 4 0 1 0 0 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE KARJAT (R) DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SANGEMNER DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 3554 3499 114 0 8 0 5 98%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SANGEMNER DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 499 433 90 0 10 0 7 87%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SANGEMNER DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 28 19 29 0 5 0 3 68%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SANGEMNER DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 5 5 5 5 5 100%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SHRIRAMPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1945 1925 118 0 6 1 4 99%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SHRIRAMPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 116 96 84 0 17 1 8 83%
KOKAN REGION NASIK ZONE AHILYANAGAR CIRCLE SHRIRAMPUR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 20 0 3 0 0 100%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE KALWAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 992 938 131 0 5 1 3 95%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE KALWAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 75 47 98 0 8 1 2 63%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE KALWAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 27 21 7 0 3 2 2 78%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 935 885 73 0 16 7 13 95%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 70 41 124 1 26 26 19 59%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MALEGAON URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 5 5 34 6 20 6 14 100%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MANMAD RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1265 1223 102 0 15 6 12 97%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MANMAD RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 38 23 59 5 25 6 14 61%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE MANMAD RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 4 8 1 4 1 4 67%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE SATANA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 736 711 56 0 11 0 9 97%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE SATANA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 88 59 90 0 10 0 1 67%
KOKAN REGION NASIK ZONE MALEGAON CIRCLE SATANA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 13 5 10 13 13 75%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1455 1438 45 0 6 2 5 99%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 157 121 121 0 38 56 35 77%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 23 22 15 0 3 0 2 96%
KOKAN REGION NASIK ZONE NASHIK CIRCLE CHANDWAD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 61 61 61 61 61 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 3248 3179 99 0 6 1 4 98%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 848 652 111 0 21 8 14 77%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 28 25 16 0 5 1 3 89%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 73 19 46 19 46 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. I Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 3034 2999 23 0 1 0 0 99%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. I Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 250 230 103 0 9 0 0 92%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. I Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 40 25 5 0 0 0 0 63%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. I Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 4 4 4 4 4 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 7123 7042 33 0 2 1 1 99%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2918 2880 67 0 5 3 4 99%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 663 578 87 0 6 1 2 87%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 611 556 99 0 12 4 9 91%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 32 28 2 0 1 0 1 88%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 22 14 9 0 2 1 1 64%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 2 2 6 3 5 3 5 100%
KOKAN REGION NASIK ZONE NASHIK CIRCLE NASIK URBAN DN. II Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 5 8 2 4 3 3 83%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1905 1795 132 0 24 7 18 94%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 125 41 131 0 60 119 50 33%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 12 12 60 1 20 1 18 100%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 37 37 37 37 37 100%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1494 1451 109 0 18 8 12 97%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 314 73 123 0 43 21 31 23%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOLA URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 33 17 124 0 9 0 1 52%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOT DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1177 1135 98 0 18 6 12 96%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOT DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 75 39 134 2 61 69 69 52%
NAGPUR REGION AKOLA ZONE AKOLA CIRCLE AKOT DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 28 3 10 3 5 100%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE BULDHANA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1830 1792 111 0 13 0 8 98%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE BULDHANA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 142 103 98 0 31 0 22 73%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE BULDHANA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 6 27 0 6 0 2 55%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1437 1407 114 0 18 0 13 98%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 201 106 135 1 50 106 47 53%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 19 11 7 0 2 0 1 58%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE KHAMGAON CONSTRUCTION DIV Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 17 17 17 17 17 100%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE MALKAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1597 1565 127 0 21 11 17 98%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE MALKAPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 104 54 132 5 47 38 40 52%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE MALKAPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 3 2 0 1 0 0 100%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE Mehkar Division Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1767 1695 140 0 20 3 13 96%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE Mehkar Division Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 242 61 82 0 24 5 9 25%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE Mehkar Division Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 4 26 18 23 18 24 100%
NAGPUR REGION AKOLA ZONE BULDHANA CIRCLE Mehkar Division Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 0 0 0 0 0 100%
NAGPUR REGION AKOLA ZONE WASHIM CIRCLE WASHIM DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2586 2483 140 0 26 5 21 96%
NAGPUR REGION AKOLA ZONE WASHIM CIRCLE WASHIM DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 96 39 128 0 38 14 26 41%
NAGPUR REGION AKOLA ZONE WASHIM CIRCLE WASHIM DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 6 60 0 19 0 13 86%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE ACHALPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2974 2876 106 0 12 6 9 97%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE ACHALPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 122 66 139 0 65 109 61 54%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE ACHALPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 26 23 27 1 5 1 4 88%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1671 1632 97 0 10 0 7 98%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 172 100 117 0 29 0 21 58%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 4 3 5 0 2 0 1 75%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI CONSTRUCTION DN Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 10 0 5 0 5 100%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2446 2365 75 0 11 0 7 97%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 168 67 65 0 13 8 8 40%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 26 10 31 0 8 0 3 38%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE AMARAVATI URBAN DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 2 2 19 18 19 18 19 100%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE MORSHI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1304 1282 66 0 8 2 5 98%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE MORSHI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 97 70 128 2 37 11 32 72%
NAGPUR REGION AMARAVATI ZONE AMARAVATI CIRCLE MORSHI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 9 10 0 2 0 2 90%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1996 1920 111 0 12 3 8 96%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 74 41 84 0 30 12 28 55%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 3 6 1 3 1 1 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE Darvha Division Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 1 21 21 21 21 21 50%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1812 1745 104 0 14 6 11 96%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 58 26 68 0 34 47 34 45%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 10 10 28 2 16 2 16 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PANDHARKAWADA DN. Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 3 3 3 3 3 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PUSAD DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2132 2011 131 0 17 15 15 94%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PUSAD DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 84 57 81 0 33 25 31 68%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE PUSAD DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 8 49 2 20 16 16 73%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1211 1202 139 0 13 1 8 99%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 107 83 128 0 21 28 16 78%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 16 16 14 0 3 1 1 100%
NAGPUR REGION AMARAVATI ZONE YAVATMAL CIRCLE YAVATMAL DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2204 2124 77 0 11 7 10 96%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 146 97 105 0 24 12 13 66%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 27 22 27 0 7 0 4 81%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE BALLARSHAH DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 30 30 30 30 30 100%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 903 879 86 0 11 2 9 97%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 974 946 76 0 8 4 7 97%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 34 12 90 6 41 55 42 35%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 60 23 140 0 18 8 8 38%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 18 18 18 0 5 0 3 100%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 35 22 27 0 5 0 2 63%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE CHANDRAPUR DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 1 1 2 2 2 2 2 100%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1278 1232 117 0 12 9 10 96%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 101 53 104 0 30 6 24 52%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 14 14 11 1 5 2 4 100%
NAGPUR REGION CHANDRAPUR ZONE CHANDRAPUR CIRCLE WARORA DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 1 47 47 47 47 47 33%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2052 1876 104 0 13 5 11 91%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 54 35 67 0 15 0 13 65%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 15 13 65 1 11 7 7 87%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE ALLAPALLI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 52 52 52 52 52 100%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1242 1232 59 0 3 1 2 99%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 79 56 74 0 17 2 9 71%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 33 32 10 0 3 1 3 97%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE BRAMHAPURI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 4 3 1 2 3 3 100%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1936 1816 113 0 9 7 7 94%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 51 37 82 0 31 2 33 73%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 152 142 59 0 13 6 10 93%
NAGPUR REGION CHANDRAPUR ZONE GADCHIROLI CIRCLE GADCHIROLI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 10 8 27 1 16 1 18 80%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE BHANDARA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2278 2226 126 0 11 1 8 98%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE BHANDARA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 136 74 124 0 43 0 36 54%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE BHANDARA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 27 16 18 0 6 0 4 59%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE SAKOLI O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 843 822 33 0 5 1 4 98%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE SAKOLI O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 72 41 121 0 45 13 31 57%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE SAKOLI O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 7 7 24 0 5 0 1 100%
NAGPUR REGION GONDIA ZONE BHANDARA CIRCLE SAKOLI O DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 54 54 54 54 54 100%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE DEORI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1313 1249 70 0 13 2 10 95%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE DEORI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 208 165 102 0 23 14 14 79%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE DEORI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 19 12 14 0 4 1 1 63%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE GONDIA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2303 2168 106 0 11 4 8 94%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE GONDIA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 99 47 108 1 33 1 29 47%
NAGPUR REGION GONDIA ZONE GONDIA CIRCLE GONDIA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 27 22 41 0 7 1 4 81%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE KATOL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 855 826 42 0 5 1 4 97%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE KATOL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 62 46 117 0 26 1 13 74%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE KATOL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 5 5 0 3 2 2 83%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 3527 3447 77 0 7 0 6 98%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 85 30 121 1 42 41 41 35%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 27 26 42 0 10 4 8 96%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE MOUDA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 10 3 91 37 56 37 41 30%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE SAONER DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1420 1364 47 0 6 1 5 96%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE SAONER DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 120 65 117 0 20 6 12 54%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE SAONER DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 20 18 13 0 3 0 2 90%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE SAONER DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1368 1347 23 0 3 1 2 98%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 54 20 113 0 43 37 43 37%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 53 53 12 0 2 1 1 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (R) CIRCLE UMRED DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 343 339 5 0 0 0 0 99%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2358 2294 85 0 4 2 3 97%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 153 136 71 0 11 7 7 89%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 155 126 77 0 12 11 6 81%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 3 3 2 0 1 0 0 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 41 39 38 0 4 1 2 95%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 1 1 0 0 0 0 0 100%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE MIDC METER NAGPUR Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 9 4 45 0 22 0 22 44%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1682 1661 118 0 2 1 1 99%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 1144 1087 57 0 2 2 1 95%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 26 20 18 0 2 1 1 77%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CIVIL LINES DIVN. Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 9 6 5 0 2 0 1 67%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1682 1664 33 0 1 1 1 99%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2789 2694 91 0 4 1 3 97%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 55 44 45 0 13 1 11 80%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 109 90 56 0 13 2 8 83%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 58 48 15 0 1 0 0 83%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR CONGRESS NAGAR DIV Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 14 10 6 0 3 1 3 71%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR GANDHIBAUG DIV. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2125 2096 34 0 1 1 1 99%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR GANDHIBAUG DIV. Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 24 12 103 0 30 7 9 50%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR GANDHIBAUG DIV. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 12 8 2 0 1 0 1 67%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR MAHAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2502 2463 40 0 2 1 1 98%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR MAHAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 163 115 119 0 17 10 10 71%
NAGPUR REGION NAGPUR ZONE NAGPUR (U) CIRCLE NAGPUR MAHAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 39 28 27 0 2 0 1 72%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 790 777 98 0 6 1 4 98%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 89 51 105 0 35 23 28 57%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 7 3 0 1 0 1 64%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE ARVI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 1 1 1 1 1 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 967 954 30 0 5 3 4 99%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 53 31 124 3 41 56 42 58%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 17 0 9 17 10 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE HINGANGHAT DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 16 16 16 16 16 100%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1602 1570 38 0 6 1 5 98%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 118 73 104 0 25 0 19 62%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 30 24 15 0 6 0 5 80%
NAGPUR REGION NAGPUR ZONE WARDHA CIRCLE WARDHA DIVSION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 115 13 64 13 64 100%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2677 2529 92 0 11 2 8 94%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 992 754 118 0 21 11 15 76%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 8 6 60 0 25 0 23 75%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE BARAMATI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 3166 3051 126 0 12 13 11 96%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 600 218 139 1 23 3 19 36%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 18 17 35 0 12 5 10 94%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE DOUND DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 4 31 0 9 0 2 57%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE SASWAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1091 1051 98 0 10 1 7 96%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE SASWAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 774 535 133 0 22 12 16 69%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE SASWAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 2 8 0 4 0 4 67%
PUNE REGION BARAMATI ZONE BARAMATI CIRCLE SASWAD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2715 2628 66 0 8 2 6 97%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 306 153 98 1 18 14 14 50%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 16 8 33 0 6 1 2 50%
PUNE REGION BARAMATI ZONE SATARA CIRCLE KARAD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 5 3 28 4 17 4 18 60%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1941 1874 51 0 6 1 4 97%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 259 165 107 1 31 97 17 64%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 18 8 7 0 2 0 0 44%
PUNE REGION BARAMATI ZONE SATARA CIRCLE PHALTAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2456 2415 82 0 8 2 5 98%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 525 446 97 0 12 1 6 85%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 38 37 22 0 3 0 1 97%
PUNE REGION BARAMATI ZONE SATARA CIRCLE SATARA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 1 8 8 8 8 8 25%
PUNE REGION BARAMATI ZONE SATARA CIRCLE VADUJ DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1652 1534 91 0 11 5 9 93%
PUNE REGION BARAMATI ZONE SATARA CIRCLE VADUJ DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 220 68 120 5 38 25 31 31%
PUNE REGION BARAMATI ZONE SATARA CIRCLE VADUJ DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 48 48 31 0 2 1 1 100%
PUNE REGION BARAMATI ZONE SATARA CIRCLE VADUJ DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1178 1133 116 0 10 2 8 96%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 145 73 105 0 38 14 35 50%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 23 21 48 0 9 16 6 91%
PUNE REGION BARAMATI ZONE SATARA CIRCLE WAI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 7 27 0 10 11 11 100%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1359 1296 59 0 5 3 3 95%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 314 66 82 0 23 27 21 21%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 2 2 5 1 3 1 3 100%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE AKLUJ O DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 0 0 0 0 0 0 0%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2447 2298 111 0 11 2 8 94%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 688 432 123 0 26 12 19 63%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 17 13 15 0 4 1 2 76%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE BARSI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 28 28 28 28 28 100%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2427 2351 135 0 8 0 6 97%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 901 555 128 0 26 7 18 62%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 36 33 20 0 7 6 6 92%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE PANDHARPUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 8 3 24 0 8 0 0 38%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2702 2571 133 0 11 5 7 95%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 1021 662 118 0 21 6 13 65%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 12 10 34 0 12 10 10 83%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 6 5 24 2 12 2 14 83%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 2313 2270 67 0 5 2 3 98%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 1034 884 87 0 9 5 6 85%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 21 14 10 0 3 1 2 67%
PUNE REGION BARAMATI ZONE SOLAPUR CIRCLE SOLAPUR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 1 0 0 0 0 0 0 0%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE GADHINGLAJ DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1267 1232 27 0 5 2 4 97%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE GADHINGLAJ DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 568 374 116 1 29 4 19 66%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE GADHINGLAJ DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 21 18 34 0 5 0 2 86%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE GADHINGLAJ DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 4 1 17 17 17 17 17 25%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 527 523 14 0 2 1 1 99%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 952 938 26 0 3 1 2 99%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 45 24 113 10 44 42 47 53%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 136 115 88 0 18 15 13 85%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 8 7 17 2 6 2 4 88%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 5 3 4 1 2 1 2 60%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE ICHALKARANJI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 1 1 2 2 2 2 2 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1793 1755 28 0 4 1 3 98%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 310 207 116 0 28 3 15 67%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 34 24 13 0 4 0 4 71%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE JAYASINGPUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 3 3 3 3 3 100%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL I DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2612 2551 38 0 4 1 3 98%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL I DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 318 140 133 1 48 4 49 44%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL I DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 21 19 9 1 3 1 2 90%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 3162 3080 25 0 3 1 2 97%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 594 444 98 0 22 4 10 75%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 29 24 23 0 7 1 5 83%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR RURAL II DIV. Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 2 7 4 6 4 6 67%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 2363 2300 86 0 3 1 2 97%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 189 152 74 0 30 3 10 80%
PUNE REGION KOLHAPUR ZONE KOLHAPUR CIRCLE KOLHAPUR URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 102 67 12 0 2 1 1 66%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1627 1571 36 0 5 2 5 97%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 125 56 136 1 32 8 17 45%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 11 4 13 4 7 4 6 36%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE ISLAMPUR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 2 2 23 18 21 18 21 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1394 1332 121 0 7 3 6 96%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 576 142 141 1 28 25 20 25%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 3 2 25 8 17 8 17 67%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE KAVATHEMAHANKAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 75 75 75 75 75 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 1619 1571 51 0 6 1 4 97%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 354 215 111 1 19 2 9 61%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 6 6 31 0 9 7 7 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI RURAL DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 12 12 12 12 12 100%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Urban 7 1109 1074 23 0 3 1 2 97%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Urban 90 1397 1190 113 0 14 7 8 85%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Urban 7 41 22 8 0 1 1 1 54%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE SANGLI URBAN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Urban 90 12 2 2 1 2 1 2 17%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2010 1973 79 0 6 1 4 98%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 394 205 105 0 27 8 19 52%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 37 30 22 0 5 1 2 81%
PUNE REGION KOLHAPUR ZONE SANGLI CIRCLE VITA DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 3 2 39 32 36 32 36 67%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 891 884 40 0 6 1 5 99%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 14663 12399 140 0 18 1 11 85%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 2 2 7 1 4 1 4 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE BHOSARI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 61 37 104 0 14 0 6 61%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 75 75 8 0 3 1 1 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2816 2449 102 0 15 9 9 87%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 21 15 6 0 2 1 1 71%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE KOTHRUD DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 48 33 46 0 9 4 6 69%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 931 931 140 0 10 2 7 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 11735 9397 144 0 28 4 20 80%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 2 2 15 13 14 13 14 100%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE PIMPRI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 37 18 138 0 33 4 15 49%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 185 183 52 0 11 7 7 99%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 5815 4923 99 0 17 10 13 85%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 12 8 14 1 4 2 2 67%
PUNE REGION PUNE ZONE GANESHKHIND (U) CIRCLE SHIVAJI NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 43 34 77 0 13 0 6 79%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2286 2178 106 0 8 2 6 95%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 273 184 87 2 23 4 18 67%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 9 8 19 0 10 0 9 89%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE MANCHAR O&M DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 1 1 60 60 60 60 60 100%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 12406 12043 103 0 9 2 7 97%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 578 448 116 0 18 5 12 78%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 21 20 41 1 11 1 9 95%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE PUNE DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 7 6 30 8 13 10 10 86%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Rural 15 2934 2858 133 0 9 0 7 97%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Rural 90 6883 6541 136 0 13 7 9 95%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Rural 15 17 17 12 0 3 0 1 100%
PUNE REGION PUNE ZONE PUNE (R) CIRCLE RAJGURUNAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Rural 90 48 37 112 0 12 0 2 77%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2416 2413 41 0 6 2 5 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 6363 5711 112 0 13 9 10 90%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 5 3 6 0 3 0 2 60%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE BUNDGARDEN DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 23 12 33 1 10 1 10 52%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 1014 989 26 0 4 2 2 98%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 4842 4420 89 0 12 1 8 91%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 10 9 15 0 3 1 1 90%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE NAGAR DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 22 17 77 0 14 3 3 77%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 2022 1975 57 0 4 1 3 98%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2671 2500 80 0 8 2 5 94%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 11 7 35 0 8 1 1 64%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PADMAVATI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 17 8 72 3 21 3 17 47%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PARVATI DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 439 438 16 0 8 9 8 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PARVATI DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 5160 3966 122 0 15 6 11 77%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PARVATI DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 1 1 3 3 3 3 3 100%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE PARVATI DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 50 36 31 0 9 2 3 72%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Permanent INFRA NOT REQUIRED Metro 3 261 252 37 0 5 1 3 97%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Permanent INFRA REQUIRED Metro 90 2754 2281 112 0 15 11 11 83%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Temporary INFRA NOT REQUIRED Metro 3 12 6 4 1 2 1 2 50%
PUNE REGION PUNE ZONE RASTAPETH (U) CIRCLE RASTAPETH DIVISION Obtaining Electricity Connection-Temporary INFRA REQUIRED Metro 90 20 16 107 0 11 2 2 80%

Urja
Empowering the Consumer