Distribution Section Circulars

Circular Reference Date Subject View / download
CE(Dist)/D-III/Non DDF Stoppage/147472 15/06/2018 Circular-Stoppage of Non- DDF CC&RF scheme for release of power supply to prospective consumers- Amendment to circular thereof.
क्र. मु.अ. (वितरण)/डी-३/NHAI Circular/२३७९९ 28/09/2017 परिपत्रक विषय – राष्ट्रीय महामार्ग प्राधिकरण, सार्वजनक बांधकाम विभाग, स्थानिक संस्था यांचेमार्फत रस्ता रुंदीकरण / नवीन रस्ते बांधणे / पुल बांधणी कामासाठी विद्युत वाहिनी स्थलांतर करताना मार्गदर्शक सुचना
CE(Dist)/D-III/NSC/10992 15/05/2018 Circular- Infrastructure development for release of new connections
CE/Testing/NET/ABT Meter/9692 26/04/2018 Circular- Utilization of existing installed ABT meter (SEM) as Net meter for Soalar rooftop projects.
ED(Dist)/D-III/Non DDF Stoppage/9245 23/04/2018 Circular- Stoppage of Non DDF CC&RF scheme
CE/Testing/HT-EHV/Metering/Circular/CM-CF/8378 16/04/2018 Circular- Guidelines regarding Metering in respect of HT/EHV consumers
ED(Dist)/D-III/Physical verification of Assests/1593 22/01/2018 Circular for Physical verification of MSEDCL assets
CE/Testing/Spare/CTPT insp./Std. Guidlines/1507 20/01/2018 Circular reagarding guidelines for keeping spare metering CTs and PTs in r/o EHV consumers/Generators
CE/Dist/D-IV/MERC/31793 29/12/2017 Amendment in Circular No. 25079 dt. 12.10.2017, for refund of SLC, ORC & Meter Cost Refund to Consumers.
CE/Dist/D-III/DTC Capacity & Metering /29874 07/12/2017 Use of commensurate capacity DTC and provision of DTC metering.
CE/Dist/D-IV/MERC/25079 12/10/2017
CE/Dist/D-IV/MERC/25079 12/10/2017 Circular – Refund of SLC, ORC & Meter Cost to consumers
CE/Dist/D-III/23799 28/09/2017 Guidelines – Preparation of estimates for shifting of existing distribution electrical infrastructure due to road widening, construction of bridges etc. by National Highway Authority of India (NHAI), Public Works Deptt. (PWD), Local bodies, etc.)
CE/MMC/SM/e-auction/002312 21/07/2017 Circular dtd. 21-07-2017 for Timely disposal of scrap/obsolete materials lying at various zones through e-auction
मु.अ. (वितरण )/ग्रावि /परिपत्रक /१५८७१ 07/06/2017 परिपत्रक : सन्माननीय लोक प्रतिनिधी यांना त्यांच्या विभागातील कामकाजाबाबत अवगत करण्याबाबत
CE(Dist)/R-III/AG-Pump/DDF/14025 07/06/2017 Revised Guidelines for releasing new Agriculture connections under DDF scheme.
CE/Testing/Star Rated/DT/9923 28/04/2017 Implementation of revised energy performance standard for Distribution Transformers up to 2500 KVA rating
CE/DIST/D-IV/7846 06/04/2017 Circular Notified voltage
CE/DIST/D-III/Circular/Safety/1084 17/01/2017 Circular – Preventive measures to reduce accidents
CE/DIST/T/24615 03/08/2016 Guidelines for ensuring separate earthing of solar roof-top PV project and safety thereof
CE(Dist)/D-III/MERC/SOC/399387 03/11/2007 Recovery of Supervision Charges
CE(Dist)/D-IV/Centages/DDF works /24007 29/07/2016 Recovery of Centages for DDF Scheme Works
CE(Dist)/D-III/Main Tran Cap less than 1000 kva/23650 27/07/2016 Maintenance schedule of transformers of capacities less than 1000 KVA
CE(Dist)/D-III/Continuous Supply/HT Consumer/07388 04/03/2016 Maintaining continuous supply to HT Consumer by reducing Planned/Forced outages-Directives thereof
CE(Dist)/D-III/Continuous Supply/HT Consumer/07388 04/03/2016 Maintaining continuous supply to HT Consumer by reducing Planned/Forced outages-Directives thereof
CE(Dist)/D-III/43000 31/12/2015 Waival of 1.3% supervision charges of the works carried out by MIDC Authority under DDF schemes in MIDC / Industrial cluster area
CE(Dist)/D-IV/39028 10/11/2015 पंचायत /ग्रामपंचायत कार्यालयात महावितरणचे अधिकारी व कर्मचारी यांची नावे व भ्रमणध्वनी क्रमांक असलेले फलक लावणेबाबत
CE(Dist)/D-III/Req. of Land/39010 09/11/2015 Supplement to Circular No. CE(Dist)/D-III/Req. of Land/28792 Dt:17.07.2015
CE(Dist.)RE-III/Tenders/36360 3/10/2015 To Avoid Sending of un-necessary copies of correspondence to H.O.
CE(Dist.)/RE-III/Tenders/33936 11/09/2015 Qualitative and Quantitative inspection of works carried out for Ag.Pump energization under special package and Backlog Funds.
CE/Dist./32900 03/09/2015 Effective Implementation (Circular No.CE/Dist./32900 Dt.03.09.2015)
CE(Dist.)/Ag pump/EE/RE-I/29874 31/07/2015 Task Force for Inspection of AG Energisation Works,under special package and Backlog scheme
CE(Dist.)/D-III/29450 24/07/2015 Revision of Delegation of powers in case of administrative approval / sanction of DDF proposals costing more than Rs.10 Crs.
CE(Dist)/D-III/Req. of Land/ 28792 17/07/2015 Revised Guidelines for Requirement of adequate land for Distribution Transformer Centers and Substations while releasing connection to
Residential/Commercial/Industrial etc. complexes/township/establishments, having multiple numbers of connections.
Dir(O)/MSEDCL/SS&online Cap/28777 16/07/2015 CIRCULAR :Providing and maintaining 33/11KV Substation & HT Line Capacitors
CE(Dist.)/R-III/Tenders/24267 28/05/2015 Agricultural Pump energization -Sub Division wise tender orders to be places at circle level-powers for Price Negotiations thereof
CE(Dist.)/RE-III/Tenders/22784 21/05/2015 Modification in guidelines in common tender documents for Ag pump energization
CE(Dist.)/D-IV/Unemployed Engrs Scheme/22200 15/05/2015 CIRCULAR :Allocation of Works by Lottery System to Unemployed Engineers
CE(Dist.)/R-III/21521 08/05/2015 Action Plan for improvement in pro-active response/detail monitoring of various issues by Executive Engineer
CE(Dist.)/D-III/EHV/Circular/27960 06/09/2014 Guidelines for framing proposals regarding Establishment of new EHV substations / Augmentation / Additional Power Transformers.
CE(Dist.)/RE-III/Tenders/19875 20/06/2014 Guidelines for submission of proposals to AG. Turnkey Contracts..
CE(Dist.)/RE-III/Circular/16375 28/05/2014 Guidelines for Use of RSJ pole for erection of Transformer DP Structure.
CE(Dist.)RE-1/Ag.PUMP/15531 19/05/2014 Chronological Order for releasing Ag Pump Connections.
CE(Dist.)/RE-III/Tenders/20016 16/04/2015 Forwording of sample total turnkey tender document for Ag.pump energization.
CE(Dist.)/RE/Ag.Pump/4900 12.02.2014 Revise Guidelines for releasing of new Agriculture connections. . . clarification thereof.
Dir(proj)/3090 30/01/2014 Execution of paid pending Ag pump Energisation works under full turnkey contract
CE(Dist.)/RE/Ag.Pump/3030 29.01.2014 Revise Guidelines for releasing of new Agriculture connections..
CE(Infra)/30208 11/11/2013 Inspection of Ag Pump energization works..
CEC/Coporate/BND 0240 25/02/2013 Enhancement in the limit of expenditure on hiring of vehicles for flying squads.
CE/DIST-III/SOC/24500 30/08/2012 Revision in Schedule of Charges.
CE/Dist/D-III/16037 08.06.2012 Redelegation of powers for technical sanction for works related to LT & HT connections under all schemes.
CE/Dist/D-III/15754 06.06.2012 Requirement of adequate land for Distribution Transformer Centers and Substations while releasing connection to bigger societies/builders.
CE(Dist)/D-III/Circular/25680 19-06-08 Procedure to plan for electrifying  areas preparation of schemes  (DPRs) and   releasing new  connections
CE(Dist)/D-III/Circular/25680 19-06-08 राज्यातील निरनिराळ्या भागांच्या विद्युतीकरणासाठी योजना आखणे , तपशीलवार प्रकल्प अहवाल तयार करणे नवीन विद्युत जोडण्या देणे यासाठीची कार्यपद्धती
20-05-08 नवीन सेवा जोडण्या देण्याकरिता व क्षमता वाढ करण्याकरिता मार्गदर्शक सूत्रे
CE(Dist)/D-III/Circular/22197 20-05-08 Guidelines for releasing new connections and augmentation
Ref : CE/Dist/D-III/MERC/ 03-09-07 Refund of meter cost
Font Resize