| Circular Sr. No. | Name of the Circular | Date of the Circular |
|---|---|---|
| 5 | MSEDCL’s Renewable Energy Circular No.05 dated-16.06.2022 regarding Procedure for purchase of 10% banked Wind/Solar energy by MSEDCL (Size: 1.08 MB, Format: PDF) |
16.06.2022 |
| 4. | Guidelines for online application to the consumers opting 100% Renewable Energy for levy of Green Power Tariff. (Size: 1.61 MB, Format: PDF) |
12.04.2022 |
| 3. | Procedure for levy of Green Power Tariff to the consumers opting for 100% Renewable Energy (Size: 1.53 MB, Format: PDF) |
23.03.2022 |
| 2. | Circular for Procedure of Change in Name/Ownership of Renewable Energy Generators, (Size: 1.05 MB, Format: PDF)
(Size: 126.10 KB, Format: PDF)
B. Draft Undertaking(Size: 19.15 KB, Format: PDF)
C. Draft PPA for Change in Name(Size: 34.77 KB, Format: PDF)
D. Draft PPA for Change in Ownership(Size: 34.94 KB, Format: PDF)
|
09.07.2019 |
| 1. | Circular for Commissioning Procedure of connectivity/commissioning of solar power projects under MSKVY (Size: 77.33 KB, Format: PDF) |
04.12.2018 |