Maharashtra State Electricity Distribution Co. Ltd.

Archived

Addendum to Tender No.  MSEDCL/RE/2023/500 MW Solar/Ph-X/T-19 Dated 14.02.2023  for procurement of 500 MW Intra State Solar power with Green Shoe option of additional 500 MW on a long term basis

1. Pre bid reply 500 MW Intra Solar Phase X 

(Size: 393.55 KB, Format: PDF)

2. Addendum II 500 MW Solar Phase X

(Size: 429.50 KB, Format: PDF)

3. Addendum-III 

(Size: 726.21 KB, Format: PDF)

Urja
Empowering the Consumer