Maharashtra State Electricity Distribution Co. Ltd.

भाषा -

मेनू

संग्रहित

Addendum 2- For Procurement Of Power On Long Term Basis Through Competitive Bidding Process (Followed By Reverse E- Auction) From 1150 MW Inter/Intra State Grid Connected Wind-Solar Hybrid Projects With Green Shoe Option Of Additional Capacity Upto 1150 MW

(Click here to view)

File size: (111.70 KB, PDF)

Urja
Empowering the Consumer