Addendum 3 – For Procurement Of Power On Long Term Basis Through Competitive Bidding Process (Followed By Reverse E- Auction) From 500 MW Inter/Intra State Grid Connected Wind-Solar Hybrid Projects With Green Shoe Option Of Additional Capacity Upto 500 MW