Roll No list of 80th Professional Examination to be held on 28/29thJanuary, 2012.
(dtd. 20/1/2012) |
|
 |
| |
|
|
|
Revised Tender Document T-10/2011 for 300 MW power purchase during Feb 12 to May 12.
(dtd. 17/1/2012) |
|
 |
| |
|
|
|
e-Tender Closing Date Extension Notice e-Tender No- EE/PHL/T-2 (2011-12) & EE/PHL/T-3 (2011-12) Tender for Supply of Tools & Plant (T&P) materials whose closing date was 16.1.2012 which is being extended up to 21.1.2012 at 17:00 Hrs.
(dtd. 16/1/2012) |
|
 |
| |
|
|
|
Result of 93rd Marathi Language Examination held on 18th December, 2011.
(dtd. 16/1/2012) |
|
 |
| |
|
|
|
eTender Closing Date extension Notice eTender no. EE/PLG/TECH/2011-2012/T-38, 39, 41, 42, 43 & 44 whose closing date was 10.01.2012 which is being extended up to17.01.2012 at 13.00 Hrs.
(dtd. 12/1/2012) |
|
 |
| |
|
|
|
Filling of TDS returns by field Offices and issuance of TDS Certificates in in respect of Turnkey Contractors.
(dtd. 10/1/2012) |
|
 |
| |
|
|
|
Extension of due date for submission of Bids for Tender T-10/2011 (300MW Power Purchase) upto 17th January'2012 upto 12:00 Hrs.
(dtd. 09/1/2012) |
|
 |
| |
|
|
|
Appointment to the post of Sub-Engineer (Dist) Orientation Training Programme thereof Dt.30.01.2012 to 4.02..2012
(dtd. 09/1/2012) |
|
 |
| |
|
|
|
Corrigendum to RFP documents for 500-660 MW power procurement
utilising coal from Bhivkund Coal block.
(dtd. 07/1/2012) |
|
 |
| |
|
|
|
Corrigendum regarding condition for Security deposit of tenders SE/WSM/T/T-08 to T-13/2011-12.
(dtd. 06/1/2012) |
|
 |
| |
|
|
|
Extension of the date of submission of the E-Tender Corrigendum to Tender T-47 to T-60 Khamgaon, Malkapur, Buldhana Division Under Buldhana Circle.
(dtd. 06/1/2012) |
|
 |
| |
|
|
|
EXTENSION NOTICE II Due date Extension for Request For Proposal (RFP) for supply of 5 star rated Ceiling Fans.
(dtd. 05/1/2012) |
|
 |
| |
|
|
|
eTender no. EE/PLG/TECH/2011-12/T- 38, 39, 41, 42, 43 & 44 whose closing date was 30.12.2011 which is being extended up to 10.01.2012 at 13.00 Hrs. Palghar.
(dtd. 05/1/2012) |
|
 |
| |
|
|
|
The due date of e-Tender for following work is extended up to 17-01-2012 Tender No.SEC/NGP/e-T-05/ 2011-12.
(dtd. 05/1/2012) |
|
 |
| |
|
|
|
Cancellation of eTender No. EE/CNDN/Tech/e-Tender/2011-12/eT-7 published on dated 15.12.2011.
(dtd. 04/1/2012) |
|
 |
| |
|
|
|
Collection of Consumer's Energy Bills through RTGS/NEFT
(dtd. 02/1/2012) |
|
 |
| |
|
|
|
Director V&S regarding Forwarding of first hand information about detection of cases of theft energy.
(dtd. 31/12/2011) |
|
 |
| |
|
|
|
Direcor of Vigilance & Security Compounding of theft cases under Section 152, offence under Section 135 & lodging of FIR as per Electricity Act 2003.
(dtd. 30/12/2011) |
|
 |
| |
|
|
|
Errata to the Tender No. MSEDCL/CGM(IT)/BACKBONE/2011-12/3 (Up-gradation and Expansion of Wide Area Network with MPLS and Broadband Technology in MSEDCL)
(dtd. 30/12/2011) |
|
 |
| |
|
|
|
Announcement for the Tender No R-APDRP Part B T-07- Konkan Zone
(dtd. 29/12/2011) |
|
 |
| |
|
|
|
Result of Essay Competition 2011
(dtd. 29/12/2011) |
|
 |
| |
|
|
|
Addendum-1 to the Tender No. MSEDCL/CGM(IT)/BACKBONE/2011-12/3 (Up-gradation and Expansion of Wide Area Network with MPLS and Broadband Technology in MSEDCL)
(dtd. 28/12/2011) |
|
 |
| |
|
|
|
Notice: Extension of due date for submission of Bids for Tender T-10/2011 (300MW Power Purchase) upto 10th January - 2012 upto 12:00 Hrs.
(dtd. 26/12/2011) |
|
 |
| |
|
|
|
(dtd. 27/12/2011) |
|
 |
| |
|
|
|
Corrigendum tender T-29 to T-46 Date for the submission of tender T-29 to T-42 & T-43 to T-44 is 30.12.2011 instead of prevision submission date.
(dtd. 27/12/2011) |
|
 |
| |
|
|
|
Last Date for Tender Document Sale/Download, Due Date for Submission and Date for Technical Bid Opening for “Up-gradation and Expansion of Wide Area Network with MPLS and Broadband Technology in MSEDCL” is extended.
(dtd. 26/12/2011) |
|
 |
| |
|
|
|
Notice for Due date Extension for Request For Proposal (RFP) for supply of 5 star rated Ceiling Fans.
(dtd. 26/12/2011) |
|
 |
| |
|
|
|
eTender Closing Date extension Notice Tender No. EE/ PLG/ TECH/ 2011-2012/ T-38 to EE/ PLG/ TECH/ 2011-2012/ T-44 are being extended up to 30.12.2011 at 13.00 Hrs.
(dtd. 26/12/2011) |
|
 |
| |
|
|
|
Extension of the date of submission of the E-Tender EE/NUD-1/11-12/T-15 NASHIK URBAN DIVISION-1.
(dtd. 23/12/2011) |
|
 |
| |
|
|
|
:LAST DATE OF BID SUBMISSION FOR CE/PP/T1 MAY 2011 UTILIZING BHIVKUND
COAL BLOCK IS EXTENDED UPTO 15.01.2012.
(dtd. 20/12/2011) |
|
 |
| |
|
|
|
LAST DATE OF BID SUBMISSION FOR CE/PP/T1 MAY 2011 UTILIZING BHIVKUND
COAL BLOCK IS EXTENDED UP TO 22.12.2011.
(dtd. 09/12/2011) |
|
 |
| |
|
|
|
Tender No. SE/VC/TECH/ T-17/ 2011-12, Submit the bids on line through E-Tendering on 27.12.2011 up to 14:00Hrs. Vashi Circle.
(dtd. 16/12/2011) |
|
 |
| |
|
|
|
Advertisement for the post of Chairperson of the Consumer Grievance Redressal Forum at Amravati, Kalyan and Konkan Zone on Contract Basis.
(dtd. 09/12/2011) |
|
 |
| |
|
|
|
Extension for last date of submission Corrigendum Tender No.SE/NRC/T/MSETCL/Koradi/11-12/T-3 last date of submission is extended up to 20/12/2011 NAGPUR RURAL CIRCLE
(dtd. 14/12/2011) |
|
 |
| |
|
|
|
Up-gradation and Expansion of Wide Area Network with MPLS and Broadband Technology in MSEDCL
(dtd. 14/12/2011) |
|
 |
| |
|
|
|
Request For Proposal (RFP) for supply of 5 star rated Ceiling Fans.
(dtd. 13/12/2011) |
|
 |
| |
|
|
|
BID EVALUATION MODEL FOR CE/PP/T1 MAY 2011 UTILIZING BHIVKUND COALBLOCK IS UPLOADED AND DD SUBMISSION BEFORE 21.12.2011.
(dtd. 13/12/2011) |
|
 |
| |
|
|
|
Six monthly departmental examination program w.e.f. Jan 2012 to June 2012.
(dtd. 13/12/2011) |
|
 |
| |
|
|
|
Roll Nos of 93rd Marathi Language Examination to be held on 18thDecember 2011.
(dtd. 13/12/2011) |
|
 |
| |
|
|
|
Orientation Training programme of Sub-Engineer (Dist) at Nashik from 26th Dec 2011 to 31st Dec 2011.
(dtd. 07/12/2011) |
|
 |
| |
|
|
|
Result of 79th Professional Examination held on 23/24th July, 2011.
(dtd. 05/12/2011) |
|
 |
| |
|
|
|
Exemption from passing Paper III of Lower Accounts and Paper I andIII of Higher Accounts Examination as per Adm.Cir 345 dt 23-06-11
(dtd. 01/12/2011) |
|
 |
| |
|
|
|
Orientation Training programme of Sub-Engineer (Dist) 'Trainee' 25th Nov to 3rd Dec 2011.
(dtd. 24/11/2011) |
|
 |
| |
|
|
|
Notice for extension of eTender closing date E-Tender No. SE/VC/Tech/AG/2011-12/T-5,6,7 Vasai Circle.
(dtd. 22/11/2011) |
|
 |
| |
|
|
|
Roll Nos of 85th Higher Accounts Examination to be held on 26/27/28th Nov 2011.
(dtd. 21/11/2011) |
|
 |
| |
|
|
|
Recruitment Advertisement No. 9/2011 for Meritorious Sportsperson and Persons with Disability.
(dtd. 21/10/2011) |
|
 |
| |
|
|
|
BId Document for 900MW RTC Power Purchase during 01.12.2011 to 31.03.2012.
(dtd. 18/11/2011) |
|
 |
| |
|
|
|
Notice for extension of eTender closing date E-Tender No. SE/VC/Tech/AG/2011-12/T-5,6,7 Vasai Circle.
(dtd. 17/11/2011) |
|
 |
| |
|
|
|
Extension for last date of submission Corrigendum Tender No. SE/O&M/Cir/G’roli/Backlog/11-12/T-77 to T-96 Gadchiroli.
(dtd. 17/11/2011) |
|
 |
| |
|
|
|
Qualification & Skill Requirements for Appointment of Independent Auditor for Aurangabad & Nagpur DFs(Amended)
(dtd. 16/11/2011) |
|
 |
| |
|
|
|
Corrigendum :Revised Schedule for Appointment of Independent Auditors for audit of Aurangabad & Nagpur DFs
(dtd. 16/11/2011) |
|
 |
| |
|
|
|
WORK CONTRACT FOR PROVIDING OUT SOURCED JUNIOR TECNICIAN
(dtd. 15/11/2011) |
|
 |
| |
|
|
|
Second Extension for last date of submission of bid document for appointment of Independent Auditor for Aurangabad and Nagpur Distribution Franchises.
(dtd. 11/11/2011) |
|
 |
| |
|
|
|
Corrigendum in tender T-56 to T-65 (2011-12) Akola.
(dtd. 15/11/2011) |
|
 |
| |
|
|
|
Backlog as on 30-June-2011.
(dtd. 11/11/2011) |
|
 |
| |
|
|
|
LAST DATE OF BID SUBMISSION FOR CE/PP/T1 MAY 2011 UTILIZING BHIVKUND COAL BLOCK IS EXTENDED UP TO 12.12.2011.
(dtd. 09/11/2011) |
|
 |
| |
|
|
|
Notice for cancellation of Tenders (T-01& T-02) of Khamgaon division.
(dtd. 08/11/2011) |
|
 |
| |
|
|
|
Additional Charge to be levied to all cc nsumer categories for 12 months w.e.f. 1st
November 2011.
(dtd. 05/11/2011) |
|
 |
| |
|
|
|
In the context it is to bring to kind notice of all concern that Estimated cost for Corriendum Tender T-10/2011-12 is
revised from 50.00 to 100.00 lakhs
(dtd. 05/11/2011) |
|
 |
| |
|
|
|
Corrigendum to add the additional condition in activity schedule of Tender No. SE/BLD/11-12/ T-43 to T-46 Buldhana.
(dtd. 05/11/2011) |
|
 |
| |
|
|
|
Corrigendum to add the additional condition in activity schedule of Tender T-43 to T-47 (2011-12).
(dtd. 04/11/2011) |
|
 |
| |
|
|
|
Corrigendum for additional activity in tender T-48 to T-54.
(dtd. 04/11/2011) |
|
 |
| |
|
|
|
Corrigendum to Tender T-09,T-10/2011--12 . Pre bid meeting timereschedule as 11.00 hrs.
(dtd. 04/11/2011) |
|
 |
| |
|
|
|
Extension for last date of sale of bid document CORRGENDUM Tender No.EE/GDL/RGGVY/T-01/2011-12 Gadhinglaj.
(dtd. 02/11/2011) |
|
 |
| |
|
|
|
Corrigendum in Change in Schedule of e-tender No. T-48 to T-54 (2011-12) Akola Circle.
(dtd. 01/11/2011) |
|
 |
| |
|
|
|
Extension for last date of submission of bid document for appointment of Independent Auditor for Aurangabad and Nagpur Distribution Franchises.
(dtd. 28/10/2011) |
|
 |
| |
|
|
|
The last date of submission of e-tender in respect of T-10/11-12 is extened Upto 31/10/2011.
(dtd. 25/10/2011) |
|
 |
| |
|
|
|
Price bid Opening of Tender No: R-APDRP/Part B/T-01 to T-16/11-12.
(dtd. 24/10/2011) |
|
 |
| |
|
|
|
Tender for 1000MW RTC Power Purchase during November'2011(Tender T-8/2011 dt:24.10.11).
(dtd. 24/10/2011) |
|
 |
| |
|
|
|
Price bid Opening of Tender No: R-APDRP/Part B/T-01 to T-16/11-12.
(dtd. 21/10/2011) |
|
 |
| |
|
|
|
Result of 112th Lower GAD Examination held on 21st August, 2011.
(dtd. 21/10/2011) |
|
 |
| |
|
|
|
eTender No.SE/VC/Tech/DSS-OP/2011-2012/T-4 Whose closing date is 20.10.2011 is extended up to 29.10.2011 at 15.00 Hrs.
(dtd. 21/10/2011) |
|
 |
| |
|
|
|
Extension for last date of sale of bid document for appointment of
Independent Auditor for Aurangabad and Nagpur Distribution Franchises.
(dtd. 19/10/2011) |
|
 |
| |
|
|
|
Roll Nos of 93rd Higher GAD Examination to be held on 22/23rdOctober, 2011.
(dtd. 18/10/2011) |
|
 |
| |
|
|
|
eTender no. EE/PLG/TECH/eTender-14/2011-2012 to EE/PLG/TECH/eTender-16/2011-2012 whose closing date was extended up to 17.10.2011 which is again being extended up to 24.10.2011 at 13.00 Hrs.
(dtd. 18/10/2011) |
|
 |
| |
|
|
|
NOTICE INVITING EXPRESSION OF INTEREST (EOI).
(dtd. 17/10/2011) |
|
 |
| |
|
|
|
eTender no. EE/PLG/TECH/eTender-20/2011-2012 & EE/PLG/TECH/eTender-23/2011-2012 whose closing date was extended upto 13.10.2011 which is again being extended up to 17.10.2011 at 13.00 Hrs.
(dtd. 15/10/2011) |
|
 |
| |
|
|
|
Bid Document for 400MW RTC Power Purchase during 16 Oct 2011 to 31 Oct 2011 tender CE/PP/P-7/2011
(dtd. 15/10/2011) |
|
 |
| |
|
|
|
Extention in Closing Date of Etenders i.r.o. Palghar division.
(dtd. 12/10/2011) |
|
 |
| |
|
|
|
Regarding non filling details of prescribed application form forappearing 93rd Higher GAD Exam tobe held on 22/23th Oct 2011.
(dtd. 12/10/2011) |
|
 |
| |
|
|
|
Qualification & Skill Requirements for Appointment of Independent Auditor for Aurangabad & Nagpur DFs
(dtd. 10/10/2011) |
|
 |
| |
|
|
|
MSEDCL'S petition for Final True Up for the year FY 2009-10. Provisional
True Up for the Year 2010-11 and Annual Performance Review for the year FY 2010-11 ----( MERC Case No. 100 of 2011).
(dtd. 08/09/2011) |
|
 |
| |
|
|
|
LAST DATE OF BID SUBMISSION FOR CE/PP/T1 MAY 2011 UTILIZING BHIVKUND COAL BLOCK IS EXTENDED UPTO 11.11.2011.
(dtd. 05/10/2011) |
|
 |
| |
|
|
|
Bid Document for 500 MW power purchase during 10 Oct 2011 to 31 Oct 2011 tender CE/PP/P-6/2011
(dtd. 05/10/2011) |
|
 |
| |
|
|
|
(dtd. 01/10/2011) |
|
 |
| |
|
|
|
NOTICE FOR INVITATION OF TENDER : APPOINTMENT OF INDEPENDENT AUDITOR FOR AUDITING OF ACCOUNTS OF
AURANGABAD AND NAGPUR DISTRIBUTION FRANCHISES.
(dtd. 01/10/2011) |
|
 |
| |
|
|
|
Bid Evaluation model, Corrigendum to RFP and Cost incurred by APCL regarding Bhivkund Coal Block.
(dtd. 29/09/2011) |
|
 |
| |
|
|
|
Result of 84th Higher Accounts Examination held on28/29/30th May, 2011.
(dtd. 29/09/2011) |
|
 |
| |
|
|
|
Orientation Training Programme Sangli RTC there of (10th to 15 th Oct.2011)
(dtd. 27/09/2011) |
|
 |
| |
|
|
|
Orientation Training Programme Amaravati RTC there of (10th to 15 th Oct.2011)
(dtd. 27/09/2011) |
|
 |
| |
|
|
|
Orientation Training Programme Nashik RTC there of (10th to 15 th Oct.2011)
(dtd. 27/09/2011) |
|
 |
| |
|
|
|
Exemption from passing Paper III of Lower Accounts Exam & Paper I &III of Higher Accounts Examination.
(dtd. 26/09/2011) |
|
 |
| |
|
|
|
Roll Nos of 85th Lower Accounts Examination to be held on 24/25th Sept 2011.
(dtd. 20/09/2011) |
|
 |
| |
|
|
|
Turnkey Contractors for Electrification Works for Mahavitaran Infrastructure Plan Phase – VII Addendum Number – 4
(dtd. 19/09/2011) |
|
 |
| |
|
|
|
BID DOCUMENTS FOR POWER PURCHASE THROUGH : COMPETITIVE BIDDING
COMMERICAL AND GENERAL CONDITIONS TENDER NO.CE(PP)T-5/2011.
(dtd. 19/09/2011) |
|
 |
| |
|
|
|
Advertisement for the post of Chairperson of the Consumer Grievance Redressal Forum at Latur Zone on Contract Basis.
(dtd. 14/09/2011) |
|
 |
| |
|
|
|
Addendum-3 to the Tender No R-APDRP/ Part B/ T-01 to T-16/11-12
(dtd. 13/09/2011) |
|
 |
| |
|
|
|
Extension of bid submission date for R-APDRP / Part-B / T01-16/11-12 tenders.
(dtd. 13/09/2011) |
|
 |
| |
|
|
|
Recruitment Advertisement No. 7/ 2011 for the post of Company Secretary .
(dtd. 12/09/2011) |
|
 |
| |
|
|
|
Addendum-2 to the Tender No: R-APDRP/Part B/T-01toT-06/11-12.
(dtd. 09/09/2011) |
|
 |
| |
|
|
|
Tender Notice 11-12 /T-24 in respect of Katol Division.
(dtd. 08/09/2011) |
|
 |
| |
|
|
|
Addendum to the Tender No: R-APDRP/Part B/T-01toT-06/11-12.
(dtd. 31/08/2011) |
|
 |
| |
|
|
|
Zero load sheding Audit reports for the quarter Jan 2011 to March 2011.
(dtd. 30/08/2011) |
|
 |
| |
|
|
|
Extension of bid submission date for R-APDRP /Part -B / T-01 -16 / 11-12.
(dtd. 26/08/2011) |
|
 |
| |
|
|
|
Exemption Order No. 1620 dtd 24th August, 2011.
(dtd. 25/08/2011) |
|
 |
| |
|
|
|
Revised RFP documents for 500-660 MW power procurement utilizing coal from Bhivkund Coal BlocK is uploaded on MSEDCL e tendering website.
(dtd. 24/08/2011) |
|
 |
| |
|
|
|
Tender document for 500 MW RTC power purchase during Sept 2011.
(dtd. 24/08/2011) |
|
 |
| |
|
|
|
Roll Nos of 112th Lower GAD Examination to be held on 21st
August, 2011.
(dtd. 12/08/2011) |
|
 |
| |
|
|
|
Press Release -11 August 2011.
(dtd. 11/08/2011) |
|
 |
| |
|
|
|
Recruitment Advertisement No. 7/ 2011 for the post of Company Secretary.
(dtd. 11/08/2011) |
|
 |
| |
|
|
|
Result of 92nd Higher GAD Examination held on 23/24th April, 2011.
(dtd. 05/08/2011) |
|
 |
| |
|
|
|
Extension of bid submission date for RFP Identification no: CE (APDRP) /R-APDRP / Part A / SCADA / T-01 /11-12.
(dtd. 05/08/2011) |
|
 |
| |
|
|
|
Zero Load Shedding Audit Reports.
(dtd. 02/08/2011) |
|
 |
| |
|
|
|
Result of 84th Lower Accounts Exam held on 26/27th March 2011.
(dtd. 29/07/2011) |
|
 |
| |
|
|
|
Corrigendum dated 29.07.2011 to RFP for Appointment of SCADA DMS Implementation agency RFP Identification No. CE(APDRP) / R-APDRP / PART A / SCADA / T-01 /11-12.
(dtd. 29/07/2011) |
|
 |
| |
|
|
|
Addendum No.1 for Tender No : R-APDRP Part B / T-01 to R-APDRP Part B / T-16 for R_APDRP Part B project
(dtd. 29/07/2011) |
|
 |
| |
|
|
|
List of Sub-Engineers (Training) Internal Notification
(dtd. 27/07/2011) |
|
 |
| |
|
|
|
Sub-Engineer (Dist) ' Trainee ' Specimen order letter & forms thereof ...
(dtd. 27/07/2011) |
|
 |
| |
|
|
|
Advertisement for the post of Chairperson of the Consumer Grievance Redressal Forum at Kolhapur Zone on Contract Basis.
(dtd. 22/07/2011) |
|
 |
| |
|
|
|
Extension of bid submission date for RFP Identification No. CE/APDRP/Part A/SCADA/T-01/11-12.
(dtd. 22/07/2011) |
|
 |
| |
|
|
|
Corrigendum to Empanelment of Auditor dated on 31-12-2010.
(dtd. 29/03/2011) |
|
 |
| |
|
|
|
Addendum to Tender No.CE/DSPC/LT CAPS /T-2 /11-12 for installation of LT APP Shunt Capacitors 25 KVAR & 30KVAR (fixed type) with control circuit.
(dtd. 21/07/2011) |
|
 |
| |
|
|
|
Appointment to the Post of Company Secretary on contract basis.
(dtd. 20/07/2011) |
|
 |
| |
|
|
|
Sub-Engr. (Dist.) 'Trainee' - 2nd batch for Nashik Training.
(dtd. 20/07/2011) |
|
 |
| |
|
|
|
Sub-Engr. (Dist.) 'Trainee' - 2nd batch for Amravati RTC Training
(dtd. 20/07/2011) |
|
 |
| |
|
|
|
Sub-Engr. (Dist.) 'Trainee' - 2nd batch for Sangli RTC Training
(dtd. 20/07/2011) |
|
 |
| |
|
|
|
Roll Nos of 79th Professional Examination to be held on 23/24 July, 2011.
(dtd. 19/07/2011) |
|
 |
| |
|
|
|
Result of 92nd Marathi Language Examination conducted on 25th June, 2011 at Eklahare, Nashik .
(dtd. 19/07/2011) |
|
 |
| |
|
|
|
Corrigendum to MSEDCL /CGM (IT) / AAMR / 2011-12 / 01.
(dtd. 18/07/2011) |
|
 |
| |
|
|
|
Tender for installation of 25KVAR/30KVAR fixed capacitors with control circuits on 63KVA and 100KVA DTCs in various zones.
(dtd. 15/07/2011) |
|
 |
| |
|
|
|
Addendum - CE/APDRP/RGGVY/T-1/2011-12 - Turnkey contract for electrification of wadi/ pada under Special Action Plan in Akkalkuva & Dhadgaon Taluka under
Shahada Division in Nandurbar Circle.
(dtd. 15/07/2011) |
|
 |
| |
|
|
|
Corrigendum to Maintenance Contract of Hardware, Networking Equipment
at Data Centre, Prakashganga, Bandra Kurla Complex, Mumbai alongwith Facility
Management Services for the period of 3 Years.
(dtd. 29/03/2011) |
|
 |
| |
|
|
|
Result of Essay Competition 2011 for Engineers.
(dtd. 07/07/2011) |
|
 |
| |
|
|
|
The terms & conditions for Deputation of Employees of Aurangabad Zone to GTL Ltd. Aurangabad.
(dtd. 05/07/2011) |
|
 |
| |
|
|
|
The terms & conditions for Deputation of Employees of Nagpur Urban Zone to SPANCO Ltd. Nagpur.
(dtd. 05/07/2011) |
|
 |
| |
|
|
|
Addendum to SCADA /DMS Implementation tender no CE( APDRP ) / R-APDRP/ Part A/ SCADA/ T-01 /11-12.
(dtd. 05/07/2011) |
|
 |
| |
|
|
|
Addendum No. 5 for Infra Plan VID 1 under Tender No.T-144 for Gadhinglaj & Kolhapur (R-1) Division under Kolhapur Zone.
(dtd. 05/07/2011) |
|
 |
| |
|
|
|
Prebid meeting on 12.07.2011 for CE/PP/T-1 dtd 06.05.2011 for power procurement utilizing coal from Bhivkund Coal Block.
(dtd. 05/07/2011) |
|
 |
| |
|
|
|
Sub-Engineer (Dist) ' Trainee ' Nashik Training thereof....
(dtd. 28/06/2011) |
|
 |
| |
|
|
|
Sub-Engineer (Dist) 'Trainee ' Amravati Training thereof....
(dtd. 28/06/2011) |
|
 |
| |
|
|
|
Sub-Engineer (Dist) ' Trainee ' Sangli Training thereof....
(dtd. 28/06/2011) |
|
 |
| |
|
|
|
Sub-Engineer (Dist) ' Trainee ' Specimen order letter & forms thereof ....
(dtd. 28/06/2011) |
|
 |
| |
|
|
|
Stopping of Interest on Provident Fund.
(dtd. 27/06/2011) |
|
 |
| |
|
|
|
Tender for Gaothan Feeder Separation Scheme for Shrirampur Division under Ahmednagar Circle (Tender No.CE/DSPC/GFSS/T-1/11-12).
(dtd. 27/06/2011) |
|
 |
| |
|
|
|
Recruitment of persons under various posts in Maharashtra Electricity Regulatory Commission.
(dtd. 24/06/2011) |
|
 |
| |
|
|
|
Corrigendum to Maintenance Contract of Hardware, Networking Equipment at Data Centre, Prakashganga, Bandra Kurla Complex, Mumbai alongwith Facility Management Services for the period of 3 Years.
(dtd. 24/06/2011) |
|
 |
| |
|
|
|
Maintenance Contract of Hardware, Networking Equipment at Data Centre, Prakashganga, Bandra Kurla Complex, Mumbai alongwith Facility Management Services for the period of 3 Years.
(dtd. 23/06/2011) |
|
 |
| |
|
|
|
Addendum No. 4 for Infra Plan Ph. VI D to Tender Number : CE(Infra)/Infra Plan-VI (D)/ Mumbai /11-12.
(dtd. 23/06/2011) |
|
 |
| |
|
|
|
Roll Nos of 92nd Marathi Language Examination to be held on 25th June, 2011.
(dtd. 18/06/2011) |
|
 |
| |
|
|
|
Tender Notice for Selection of SCADA & DMS Implementation Agency.
(dtd. 17/06/2011) |
|
 |
| |
|
|
|
Addendum No. 3 for Infra Plan Ph. VI D to Tender Number : CE(Infra)/Infra Plan-VI (D)/ Mumbai /11-12.
(dtd. 15/06/2011) |
|
 |
| |
|
|
|
Postponement of Tender schedule for R-APDRP Part B Tenders T-01 to T-11.
(dtd. 15/06/2011) |
|
 |
| |
|
|
|
Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase VI - D Addendum Number -2 Tender Number : CE(Infra)/Infra Plan-VI -(D) /Mumbai /11-12.
(dtd. 13/06/2011) |
|
 |
| |
|
|
|
Appointment to the Post of Director - Marketing and Operations in PTC India Ltd.
(dtd. 13/06/2011) |
|
 |
| |
|
|
|
Select List for the post of Sub-Engineer (Distribution).
(dtd. 08/06/2011) |
|
 |
| |
|
|
|
Minutes of the Pre-Bid Meeting of Infra Plan Phase VI-D.
(dtd. 06/06/2011) |
|
 |
| |
|
|
|
Jalgaon Distribution Franchise Agreement.
(dtd. 06/06/2011) |
|
 |
| |
|
|
|
ADVERTISEMENT No. CIO-2 FOR SELECTION OF INVESTIGATION OFFICERS IN MSEDCL.
(dtd. 02/06/2011) |
|
 |
| |
|
|
|
Addendum-4 to Tender for Gaothan Feeder Separation Scheme for Shrirampur Division under Ahmednagar Circle (Tender No.CE/DSPC/GFSS/T-1/11-12).
(dtd. 02/06/2011) |
|
 |
| |
|
|
|
Revision in tendering schedule in respect of Tender No.CE/Dist./T-01/Vasai/2011-12.
(dtd. 01/06/2011) |
|
 |
| |
|
|
|
Addendum-3 to Tender for Gaothan Feeder Separation Scheme for Shrirampur Division under Ahmednagar Circle (Tender No.CE/DSPC/GFSS/T-1/11-12).
(dtd. 01/06/2011) |
|
 |
| |
|
|
|
Grant of Open Access (English).
(dtd. 24/05/2011) |
|
 |
| |
|
|
|
(Marathi)
(dtd. 24/05/2011) |
|
 |
| |
|
|
|
Addendum-2 to GFSS Tender for Shrirampur Division under Amhednagar Circle (Tender No.CE/DSPC/GFSS/T-1/11-12).
(dtd. 27/05/2011) |
|
 |
| |
|
|
|
Pre-Bid Queries Reply for GFSS Tender for Shrirampur Division under Amhednagar Circle (Tender No.CE/DSPC/GFSS/T-1/11-12).
(dtd. 27/05/2011) |
|
 |
| |
|
|
|
Select list of eligible candidate for the interview for the post of Director (Projects) MSETCL
as per advertisement dt.15/01/2011.
(dtd. 27/05/2011) |
|
 |
| |
|
|
|
Tender Document for 300MW RTC Power Purchase during June 2011.
(dtd. 26/05/2011) |
|
 |
| |
|
|
|
Addendum No. 1 for Infrastructure Plan Phase - VI D.
(dtd. 25/05/2011) |
|
 |
| |
|
|
|
Invitiation for Bids for turnkey contract for supply, erection, testing & commissioning of infrastructure improvement works involving erection of new 22kV feeders, establishment of new DTC's, L.T.lines, & allied works under Vasai Circle.
(dtd. 23/05/2011) |
|
 |
| |
|
|
|
Addendum-1 for Tender No. CE/DSPC/GFSS/T-1/11-12 for GFSS work in Shrirampur Division under Ahmednagar Circle.
(dtd. 21/05/2011) |
|
 |
| |
|
|
|
Exemption order of Higher Accounts Examination.
(dtd. 21/05/2011) |
|
 |
| |
|
|
|
Roll Nos of 84th Higher Accounts Examination to be held on 28/29/30th May 2011.
(dtd. 20/05/2011) |
|
 |
| |
|
|
|
Advertisement for the post of Member of the Consumer Grievance
Redressal Forum at Bhandup Zone.
(dtd. 13/05/2011) |
|
 |
| |
|
|
|
Advertisement for the post of Chairperson of the Consumer Grievance
Redressal Forum at Amravati, Pune, Bhandup and Nagpur(Rural) Zone
on Contract Basis.
(dtd. 12/05/2011) |
|
 |
| |
|
|
|
Result of 111th Lower GAD Examination held on 26th Feb 2011.
(dtd. 11/05/2011) |
|
 |
| |
|
|
|
Application for grant of Distribution License for Reliance Infrastructure area of supply.
(dtd. 10/05/2011) |
|
 |
| |
|
|
|
Result of 78th Professional Examination held on 22/23th January, 2011.
(dtd. 09/05/2011) |
|
 |
| |
|
|
|
Advertisement No. 3/2011 for the post of Company Secretary.
(dtd. 07/05/2011) |
|
 |
| |
|
|
|
Filling up of one post of Chief Electrical Engineer Group 'A' Gazetted in the pay scale of Rs. 37400 - 67000 and Grade Pay Rs. 8700 in Electricity Department, Government of Goa, by transfer on deputation.
(dtd. 05/05/2011) |
|
 |
| |
|
|
|
Six monthly programme of depttl.exam from July 2011 to Dec 2011.
(dtd. 30/04/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids in respect of tender no.CE/Dist./T-08/Wada-Vasai/2010-11.
(dtd. 25/04/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids in respect of tender no.CE/Dist./T-09/Buldhana/2010-11.
(dtd. 25/04/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids in respect of tender no.CE/Dist./T-07/Washim/2010-11.
(dtd. 25/04/2011) |
|
 |
| |
|
|
|
Cancellation of Tender T-26 in r/o NRC, Nagpur.
(dtd. 25/04/2011) |
|
 |
| |
|
|
|
Deputation of MSEDCL Employees to M/s SPANCO, Nagpur.
(dtd. 19/04/2011) |
|
 |
| |
|
|
|
Nagpur Distribution Franchise agreement between MSEDCL and M/s Spanco.
(dtd. 13/04/2011) |
|
 |
| |
|
|
|
Roll Nos of 92nd Higher GAD Examination to be held on 23/24th April 2011.
(dtd. 19/04/2011) |
|
 |
| |
|
|
|
Cancellation of E-Short Tender No.SE/NRC/T/Reorien/10-11/T-27.
(dtd. 19/04/2011) |
|
 |
| |
|
|
|
Select List for the posts Advertised vide Advt. No.11/2010.
(dtd. 18/04/2011) |
|
 |
| |
|
|
|
Interview schedule for the post of Sub-Engineer(Dist.)
(dtd. 18/04/2011) |
|
 |
| |
|
|
|
Addendum to Tender No.CE/Dist./T-09/Buldhana/2010-11.
(dtd. 18/04/2011) |
|
 |
| |
|
|
|
Addendum to Tender No.CE/Dist./T-08/Wada-Vasai/2010-11.
(dtd. 18/04/2011) |
|
 |
| |
|
|
|
Addendum to Tender No.CE/Dist./T-07/Washim/2010-11.
(dtd.18/04/2011 ) |
|
 |
| |
|
|
|
Deputation of MSEDCL Employees to M/s. GTL, Aurangabad.
(dtd. 15/04/2011) |
|
 |
| |
|
|
|
Aurangabad Distribution Franchise agreement between MSEDCL and M/s GTL.
(dtd. 13/04/2011) |
|
 |
| |
|
|
|
Corrigendum to Cancellation of E-Tender No.EE-I/NGP/TECH/E-Tender/10-11/T-05.
(dtd. 06/04/2011) |
|
 |
| |
|
|
|
Result of 83rd Higher Accounts Examination held on 27/28/29th Nov 2010.
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids under Tender No.CE/Dist./T-08/Wada-Vasai/2010-11.
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
Extention of due date for submission of bids under Tender No.CE/Dist./T-07/Washim/2010-11.
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids under Tender No.CE/Dist./T-09/Buldhana/2010-11.
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
Grant of higher grade benefit on 3rd occasion to the posts having no channel of promotion – Prescribing pay scales thereof.
(dtd. 01/04/2011) |
|
 |
| |
|
|
|
Cancellation E-Tender No.EE-I/NGP/TECH/E-Tender/10-11/T-05.
(dtd. 31/03/2011) |
|
 |
| |
|
|
|
ADVERTISEMENT NO. 2/2011 For the post of Member of the Consumer Grievance Redressal Forum at Bhandup Urban Zone on Contract Basis.
(dtd. 30/03/2011) |
|
 |
| |
|
|
|
Performance Appraisal System.
(dtd. 29/03/2011) |
|
 |
| |
|
|
|
Submission of disciplinary action / vigilance report in respect of the UDCs (GAD).
(dtd. 25/03/2011) |
|
 |
| |
|
|
|
Enhancement of compensation for Permanent Disability in the case of non-fatal accidents to outsiders (Human Being only).
(dtd. 24/03/2011) |
|
 |
| |
|
|
|
Revising rates of Conveyance Allowance.
(dtd. 24/03/2011) |
|
 |
| |
|
|
|
Notice of Cancellation of re-invited Tenders under infrastructure plan Phase VI, VIA, (Group - II) & VIB.
(dtd. 22/03/2011) |
|
 |
| |
|
|
|
Exemption from appearing paper III of Lower Account s Examination.
(dtd. 22/03/2011) |
|
 |
| |
|
|
|
Call for papers in international conference on advances in energy research at IIT Mumbai.
(dtd. 21/03/2011) |
|
 |
| |
|
|
|
(dtd. 19/03/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids under Tender No.CE/Dist./T-07/Washim/2010-11 .
(dtd. 18/03/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids under Tender No.CE/Dist./T-08/Wada-Vasai/2010-11 .
(dtd. 18/03/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids under Tender No.CE/Dist./T-09/Buldhana/2010-11
(dtd. 18/03/2011) |
|
 |
| |
|
|
|
Roll No. 84th Lower Accounts Examination to be held on 26/27th March 2011
(dtd. 18/03/2011) |
|
 |
| |
|
|
|
Zonewise Allocation of Departmental employees selected for the post of LDC/Office Assistant notified vide Internal Notification No.33660 dated 02/11/2010.
(dtd. 16/03/2011) |
|
 |
| |
|
|
|
Addendum No.1 to Bidding Document-Tender No.CE/Dist./T-07/Washim/2010-11.
(dtd. 15/03/2011) |
|
 |
| |
|
|
|
(dtd. 09/03/2011) |
|
 |
| |
|
|
|
Addendum-3 for Tender No. CE/DSPC/SPP/T-9/10-11.
(dtd. 05/03/2011) |
|
 |
| |
|
|
|
INVITIATION FOR BIDS for turnkey contract for estt. of 9 nos. of new 33/11kV sub-stns. and allied works under Buldhana Circle
.
(dtd. 03/03/2011) |
|
 |
| |
|
|
|
INVITIATION FOR BIDS for turnkey contract for estt. of 3 nos. of 22 kV Switching Stations and allied works under Vasai Circle
.
(dtd. 03/03/2011) |
|
 |
| |
|
|
|
INVITIATION FOR BIDS for turnkey contract for estt. of 9 nos. of new 33/11kV sub-stns. and allied works under Washim Circle
.
(dtd. 03/03/2011) |
|
 |
| |
|
|
|
Reply to queries raised by various bidders in the Pre-bid meeting for tender no. CE/DSPC/SPP/T-9/10-11.
(dtd. 03/03/2011) |
|
 |
| |
|
|
|
Addendum-2 for Tender No. CE/DSPC/SPP/T-9/10-11 .
(dtd. 05/02/2011) |
|
 |
| |
|
|
|
Addendum-1 to Tender No. CE/DSPC/SPP/T-9/10-11 .
(dtd. 05/02/2011) |
|
 |
| |
|
|
|
Extension of due date for submission of bids under tender No.CE/Dist./T-06/Mahape/2010-11.
(dtd. 25/02/2011) |
|
 |
| |
|
|
|
Addendum to Bidding document in respect of Tender No.CE/Dist/T-06/Mahape/2010-11 - Extension of due date for submission.
(dtd. 17/02/2011) |
|
 |
| |
|
|
|
Minutes of pre-bid meeting held at Circle Office Akola on dtd.15.02.2011.
(dtd. 17/02/2011) |
|
 |
| |
|
|
|
Addendum No. 1 to Bidding Document – Tender No. CE/Dist./T-05/Jalna Ag./2010-11.
(dtd. 14/02/2011) |
|
 |
| |
|
|
|
Tender for execution of work of Single Phasing Scheme for left-out vil ages/wadies on 100% turnkey basis in
Nanded, Baramati, Aurangabad, Nashik, Latur & Jalgaon Zones.
(dtd. 05/02/2011) |
|
 |
| |
|
|
|
Invitation for Bids for releasing of 4384 Nos. of Ag. pumps & allied works under Jalna Circle.
(dtd. 05/02/2011) |
|
 |
| |
|
|
|
Invitation for Bids for Evacuation of Power from 220/22kV Mahape EHV Sub-Station.
(dtd. 31/01/2011) |
|
 |
| |
|
|
|
Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VIB Addendum Number – 8 to Tender Number : CE(Infra)/Infra Plan-VIB/ Mumbai /10-11.
(dtd. 29/01/2011) |
|
 |
| |
|
|
|
Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VIA, Group -II Addendum Number – 14 to Tender Number : CE(Infra)/Infra Plan-VIA/ Mumbai /10-11
(dtd. 29/01/2011) |
|
 |
| |
|
|
|
Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VI Group -II
Addendum Number – 15 to Tender Number : CE(Infra)/Infra Plan-VI/ Mumbai /10-11
(dtd. 29/01/2011) |
|
 |
| |
|
|
|
Corrigendum - I to Tender for Energy Bill Collection work in the area of Thane Urban Circle and Vashi Circle under Bhandup Urban zone on commission basis through mode of Credit Co.Op. Society.
(dtd. 25/01/2011) |
|
 |
| |
|
|
|
Internal Audit Section: Division wise Capital Expenditure and Capitalization of Infrastructure Plan Scheme for the F.Y.2009-10.
(dtd. 24/01/2011) |
|
 |
| |
|
|
|
Addendum to Bidding document in respect of Tender No.CE/Dist./T-04/Beed/2010-11....Extension of due date for submission.
(dtd. 17/01/2011) |
|
 |
| |
|
|
|
(dtd. 17/01/2011) |
|
 |
| |
|
|
|
Internal Audit Section: Expression of Interest for Empanelment of Audit firms .
(dtd. 29/12/2010) |
|
 |
| |
|
|
|
ADVERTISEMENT FOR THE POST OF DIRECTOR.
(dtd. 15/01/2011) |
|
 |
| |
|
|
|
Addendum to Tender No.CE/Dist./T-04/Beed/2010-11.
(dtd. 11/01/2011) |
|
 |
| |
|
|
|
EXTENSION FOR LAST DATE OF SUBMISSION OF TECHNICAL AND FINANCIAL BIDS FOR JALGAON UCR DIVISION DISTRIBUTION FRANCHISE.
(dtd. 10/01/2011) |
|
 |
| |
|
|
|
Request for Proposal for Appointment of Distribution Franchisee for Shil,Mumbra & Kalwa sub-divisions under Thane urban circle. Bid Specification No.: DF-5/2010-11.
(dtd. 10/01/2011) |
|
 |
| |
|
|
|
Minutes of Pre-Bid Meeting dt.28.12.2010 - Addendum-1 in r/o Tender No.SE/NRC/T/DTC-M/10-11/T-26.
(dtd. 06/01/2011) |
|
 |
| |
|
|
|
Corrigendum to Addendum to Bidding Document for Tender No.CE/Dist./T-03/Pune/2010-11.
(dtd. 06/01/2011) |
|
 |
| |
|
|
|
Addendum to Bid Document of Tender No.CE/Dist./T-03/Pune/2010-11.
(dtd. 05/01/2011) |
|
 |
| |
|
|
|
Exemption order No. 3133 dt 31-12-2010.
(dtd. 05/01/2011) |
|
 |
| |
|
|
|
Extension of last date for submission of bids under Tender No.CE/Dist,/T-04/Beed/2010-11.
(dtd. 04/01/2011) |
|
 |
| |
|
|
|
Bid Submission venue for tender number MSEDCL/IT/ERP/10-11/1 Version 3.0.
(dtd. 03/01/2011) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase - VIA(Group-II) Addendum No.-13 to Tender no.: CE(Infra)/Infra Plan - VIA/Mumbai/10-11.
(dtd. 29/12/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase - VIB Addendum No.-7 to Tender no.: CE(Infra)/Infra Plan -VIB/Mumbai/10-11.
(dtd. 29/12/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase - VI(Group-II) Addendum No.-14 to Tender no.: CE(Infra)/Infra Plan - VI/Mumbai/10-11.
(dtd. 29/12/2010) |
|
 |
| |
|
|
|
Extension of last date for submission of bids under tender No.CE/Dist./T-03/Pune/2010-11.
(dtd. 29/12/2010) |
|
 |
| |
|
|
|
Corrigendum - II to ERP tender no. MSEDCL/IT/ERP/10-11/1 dt.25-11-10.
(dtd. 28/12/2010) |
|
 |
| |
|
|
|
Qualification Criteria for Shil,Mumbra & Kalwa sub-divisions under Thane urban circle Distribution Franchisee Bid specification no. DF-5/2010-11.
(dtd. 22/12/2010) |
|
 |
| |
|
|
|
Minutes of Pre-Bid Meeting dt.20.12.2010 to Addendum-1 in r/o Tender No.SE/NRC/T/Koradi/10-11/T-25.
(dtd. 21/12/2010) |
|
 |
| |
|
|
|
MVAT Circular VAT-1505/192/TAXATION-1 for tender document number MSEDCL/IT/ERP/10-11/1.
(dtd. 16/12/2010) |
|
 |
| |
|
|
|
Corrigendum and pre-bid query responses to Tender Document No. MSEDCL/IT/ERP/10-11/1.
(dtd. 15/12/2010) |
|
 |
| |
|
|
|
Enhancing the limit of expenditure on hired vehicle for the Flying Squads.
(dtd. 14/12/2010) |
|
 |
| |
|
|
|
Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VI C
Addendum Number – 2 to Tender Number : CE(Infra)/Infra Plan-VI C/ Mumbai /10-11 .
(dtd. 14/12/2010) |
|
 |
| |
|
|
|
Capex Circular No.1: Reconciliation of Capital Expenditure as per Financial Account with expenditure reported as per physical progress reports submitted by concerned C.E’s at H.O.
(dtd. 14/12/2010) |
|
 |
| |
|
|
|
Corringendum for 'Inviation for Bids' in respect of No.CE/Dist./T-04/Beed/2010-11for Beed Circle.
(dtd. 13/12/2010) |
|
 |
| |
|
|
|
RFP for Providing Mobile Payment & SMS services to MSEDCL.
(dtd. 09/12/2010) |
|
 |
| |
|
|
|
Clarification to bidders Queries in Infra Plan Phase VIC.
(dtd. 10/12/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for
Mahavitaran Infrastructure Plan Phase – VIC Addendum Number – 1 to Tender Number : CE(Infra)/Infra Plan-VIC/ Mumbai /10-11.
(dtd. 10/12/2010) |
|
 |
| |
|
|
|
Revision in Tender Schedule in respect of Tender No.CE/Dist./T-05/Jalna Ag./2010-11 for energisation of Ag. pumps under Jalna Circle.
(dtd. 10/12/2010) |
|
 |
| |
|
|
|
The RFP & PPA in respect of 2000 ( + 20%) MW Power Procurement on medium term revised. Bid submission on 22.12.2010.
(dtd. 10/12/2010) |
|
 |
| |
|
|
|
Invitiation for Bids for Estt. of 9 Nos. of 33/11kV Sub-Stations and allied works under Beed Circle.
(dtd. 09/12/2010) |
|
 |
| |
|
|
|
Invitiation for Bids for Power Evcaution from 132/11kV Rastapeth GIS and 220/22kV Magarpatta EHV Sub-Station under Rastapeth Circle.
(dtd. 09/12/2010) |
|
 |
| |
|
|
|
Submission of Distribution License application in the Area of Supply served by MPECS.
(dtd. 08/12/2010) |
|
 |
| |
|
|
|
MSEDCL ERP: As discussed in the Pre Bid meeting on Dec 6, 2010, the Pre-Bid Query format is attached for submitting queries.Please mail your queries in the attached format on msedclerp@mahadiscom.in before 08 th December, 5 pm. Kindly note that Queries after the deadline will not be entertained.
(dtd. 07/12/2010) |
|
 |
| |
|
|
|
DISTRIBUTION FRANCHISEE AGREEMENT
Only for those Developers who have fully developed the Electrical Infrastructure at their own cost and also who undertake to develop additional infrastructure in future).
(dtd. 07/12/2010) |
|
 |
| |
|
|
|
Extension of Due Date for submission of Bids under Tender No.CE/Dist./T-02/Solapur/2010-11.
(dtd. 06/12/2010) |
|
 |
| |
|
|
|
Bid Document T-11/2010 for Power Purchase during January 2011 to June 2011 (Amended) .
(dtd. 29/11/2010) |
|
 |
| |
|
|
|
Extension of Pre Bid meeting for REQUEST FOR PROPOSAL (RFP) for selection of ‘Implementation Partner/System Integrator’ to assist the Maharashtra State Electricity Distribution Company Limited for ERP SOLUTION implementation and Integration.
(dtd. 03/12/2010) |
|
 |
| |
|
|
|
Delegation of Powers for Recording, Countersigning and Acceptance of Annual Confindential
Reports in respect of staff working in newly created Departmental Vigilance (DV) Oragnisation.
(dtd. 06/12/2010) |
|
 |
| |
|
|
|
(dtd. 03/12/2010) |
|
 |
| |
|
|
|
ADVT.NO.13/2010 - ADVERTISEMENT FOR THE POST OF SUB-ENGINEER(DIST.).
(dtd. 03/12/2010) |
|
 |
| |
|
|
|
INTERNAL NOTIFICATION FOR THE POST OF SUB-ENGINEER(DIST.) FROM AMONGST THE DEPARTMENTAL QUALIFIED EMPLOYEES.
(dtd. 03/12/2010) |
|
 |
| |
|
|
|
Notice for Registration under E-Tendering system for supply of PSC Poles.
(dtd. 03/12/2010) |
|
 |
| |
|
|
|
Invitation for Bids for energisation of 6800 No. of Ag. Pumps under Jalna Circle.
(dtd. 03/12/2010) |
|
 |
| |
|
|
|
Addendum to Tender No.CE/Dist./T-02/2010-11 for solapur circle.
(dtd. 30/11/2010) |
|
 |
| |
|
|
|
Clarification Tender No.CE/Dist./T-02/2010-11 for solapur circle.
(dtd. 30/11/2010) |
|
 |
| |
|
|
|
600 MW LTPP Bidding documents under Case - I utilising Bhivkund Coal Block.
(dtd. 30/11/2010) |
|
 |
| |
|
|
|
RFP for Proposal for Appointment of Distribution Franchisee at Jalgaon U.C.R.Division.
(dtd. 29/11/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VI B Addendum Number – 6 to Tender Number : CE(Infra)/Infra Plan-VIB/ Mumbai /10-11.
(dtd. 29/11/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VIA Addendum Number – 12 to Tender Number : CE(Infra)/Infra Plan-VIA/ Mumbai /10-11.
(dtd. 29/11/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VI Addendum Number – 13 to Tender Number : CE(Infra)/Infra Plan-VI/ Mumbai /10-11.
(dtd. 29/11/2010) |
|
 |
| |
|
|
|
Extension of due date for submission of Bids under Tender No.CE/Dist./T-02/2010-11 .
(dtd. 26/11/2010) |
|
 |
| |
|
|
|
Time table of departmental examination from Jan 2011 to June 2011.
(dtd. 25/11/2010) |
|
 |
| |
|
|
|
Grant of higher grade benefit on 3rd occasion to the categories of posts having no channel of promotion – Prescribing of Pay scales thereof.
(dtd. 23/11/2010) |
|
 |
| |
|
|
|
(dtd. 23/11/2010) |
|
 |
| |
|
|
|
Bid Document for 176 MW Power Purchase during December 2010 to June 2011.
(dtd. 18/11/2010) |
|
 |
| |
|
|
|
Corrigendum for implementing Automatic Meter Reading [AMR] of Agriculture Consumers & Distribution Transformers under Ahmednagar Circle.
(dtd. 15/11/2010) |
|
 |
| |
|
|
|
ADDENDUM-3 in Tender for 66 kV Level Elimination Scheme - Tender No: CE/ DSPC/ 66 kV Level
Elimination/ T- 8/10-11.
(dtd. 09/11/2010) |
|
 |
| |
|
|
|
INVITATION FOR BIDS FOR ESTABLISHMENT OF 31 NOS. OF NEW 33/11KV SUB-STATIONS AND ALLIED WORKS UNDER SOLAPUR CIRCLE.
(dtd. 09/11/2010) |
|
 |
| |
|
|
|
Qualification Criteria for Jalgaon Distribution Franchisee, Tender no. DF-4 / 2010-11.
(dtd. 09/11/2010) |
|
 |
| |
|
|
|
Reply to queries during pre-bid meeting held on 21st October, 2010 for 66 kV Level Elimination Scheme
tender (Tender No. CE/ DSPC/ 66 kV level Elimination/ T- 8/10-11).
(dtd. 28/10/2010) |
|
 |
| |
|
|
|
Revenue Budget: Budget Estimates for F.Y.2011-12.
(dtd. 28/10/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VI Addendum Number – 12 to Tender Number : CE(Infra)/Infra Plan-VI/ Mumbai /10-11.
(dtd. 28/10/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VIA Addendum Number – 11 to Tender Number : CE(Infra)/Infra Plan-VIA/ Mumbai /10-11.
(dtd. 28/10/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for Electrification Works for Mahavitaran Infrastructure Plan Phase – VI B Addendum Number – 5 to Tender Number : CE(Infra)/Infra Plan-VIB/ Mumbai /10-11.
(dtd. 28/10/2010) |
|
 |
| |
|
|
|
ADDENDUM-2 in Tender for 66 kV Level Elimination Scheme - Tender No: CE/ DSPC/ 66 kV Level Elimination/ T- 8/10-11.
(dtd. 28/10/2010) |
|
 |
| |
|
|
|
ADDENDUM-I in Tender for 66 kV Level Elimination Scheme- Tender No:CE/ DSPC/ 66 kV level Elimination/ T- 8/10-11.
(dtd. 18/10/2010) |
|
 |
| |
|
|
|
Amended Medium Term Power Procurement (MTPP) RFP, PPA under Case - I.
(dtd. 12/10/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for evaluation of Amravati District. Integrated Scheme / Project.
(dtd. 06/10/2010) |
|
 |
| |
|
|
|
Addendum 4 to Tender for 25 & 30 KVAR LT APP Shunt Capacitors.
(dtd. 01/10/2010) |
|
 |
| |
|
|
|
Minutes of the Pre-Bid Meeting to Tender No. SE/KCK-I/Tech/MRI/T-6 to T-08.
(dtd. 01/10/2010) |
|
 |
| |
|
|
|
Extension of bid submission date in respect of tender nos : CE /APDRP /T-4 /2010 , CE /APDRP /T- 5 /2010 , CE /APDRP /T-6 / 2010 .
(dtd. 29/09/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for
Electrification Works for Mahavitaran Infrastructure Plan
Phase – VIA Addendum Number – 10 to
Tender Number : CE(Infra)/Infra Plan-VIA/ Mumbai /10-11 .
(dtd. 27/09/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for
Electrification Works for Mahavitaran Infrastructure Plan
Phase – VIB Addendum Number – 4 to
Tender Number : CE(Infra)/Infra Plan-VIB/ Mumbai /10-11.
(dtd. 27/09/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Document Turnkey Contract for
Electrification Works for Mahavitaran Infrastructure Plan
Phase – VI Addendum Number – 11 to
Tender Number : CE(Infra)/Infra Plan-VI/ Mumbai /10-11.
(dtd. 27/09/2010) |
|
 |
| |
|
|
|
Addendum-3 to Tender for 25 & 30 kVAr LT APP Shunt Capacitors (Tender No. CE/DSPC/LT CAPS/T-6/09-10).
(dtd. 27/09/2010) |
|
 |
| |
|
|
|
RFP Bid extension for procurement of 660 MW power using BHIVKUND coal block.
(dtd. 21/09/2010) |
|
 |
| |
|
|
|
Addendum-2 to Tender for 25 & 30 kVAr LT APP Shunt Capacitors (Tender No. CE/DSPC/LT CAPS/T-6/09-10).
(dtd. 20/09/2010) |
|
 |
| |
|
|
|
Reply to Additional Queries raised by some of the prospective Bidders of tender for GFSS Scheme for left-out Villages/Wadies Tender No. CE/DSPC/GFSS/T-7/10-11.
(dtd. 20/09/2010) |
|
 |
| |
|
|
|
Reply to the Queries raised by various prospective bidders of Tender for 25 & 30 kVAr LT APP Capacitors during pre-bid meeting held on 14th September, 2010.
(dtd. 18/09/2010) |
|
 |
| |
|
|
|
Addendum-2 to Tender for GFSS left-out Villages/Wadies (Tender No. CE/DSPC/GFSS/T-7/10-11).
(dtd. 16/09/2010) |
|
 |
| |
|
|
|
For Engaging consultancy services for load study report/ survey of District Integrated Scheme of Vasai Circle.
(dtd. 16/09/2010) |
|
 |
| |
|
|
|
Addendum-1 to Tender No.CE/DSPC/GFSS/T-7/10-11 for GFSS left-out villages/wadies.
(dtd. 14/09/2010) |
|
 |
| |
|
|
|
Plan for promotion panel for 2010-2011.
(dtd. 14/09/2010) |
|
 |
| |
|
|
|
SUMMARY TENDER DOCUMENT FOR THE IMPLEMENTATION OF ERP SOLUTION AT MSEDCL.
(dtd. 13/09/2010) |
|
 |
| |
|
|
|
NIT for Procurement of 1. LT AC 3 phase 4 wire CT /PT operated fully static AMR Compatible Tri - Vector Meters for DTC, 2. LT
DTC meter boxes for modem and energy meters, & 3.Tender for 3 phase,4 wire AMR compatible H.T. tri-vector energy meters for
substation feeders.
(dtd. 09/09/2010) |
|
 |
| |
|
|
|
Reply to queries during pre-bid meeting held on 4th September, 2010 for GFSS Left-out villages/wadies tender (tender no. CE/DSPC/GFSS/T-7/10-11.
(dtd. 09/09/2010) |
|
 |
| |
|
|
|
ADDENDUM-1 to Tender No. . CE/ DSPC/ LT CAPS /T-6/10-11 - Turnkey Contract for 25kVAr & 30kVAr LT APP Shunt Capacitor Scheme .
(dtd. 07/09/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for evaluation of Dhule District. Integrated Scheme / Project.
(dtd. 07/09/2010) |
|
 |
| |
|
|
|
Addendum to bidding document tender No. SE/OSBD/TS/10-11/T-01 to T-18 for
Ag energisation works in various units under Osmanabad circle.
(dtd. 04/09/2010) |
|
 |
| |
|
|
|
Extension of due date of submission of offers for consultancy services for evaluation of District Integrated Scheme for Ahmednagar District.
(dtd. 03/09/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for evaluation of Sangli district.Integrated Scheme / Project.
(dtd. 01/09/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for evaluation of Kolhapur District.Integrated Scheme / Project.
(dtd. 01/09/2010) |
|
 |
| |
|
|
|
Rescheduling of dates of Tender No. CE/DSPC/LT CAPS /T-6/10-11 for LT shunt Capacitors Scheme.
(dtd. 31/08/2010) |
|
 |
| |
|
|
|
Postponement of Bid submission date RFP identification no : CE/APDRP/Tech – A/01/10-11 version 3.0 Dated 23.08.2010 for appointment of ITIA in 35 towns under R-APDRP part 'A'.
(dtd. 31/08/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for evaluation of Latur, Beed, Osmanabad District.Integrated Scheme / Project.
(dtd. 31/08/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase Infra Plan-VI- Addendum No.10.
(dtd. 30/08/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase Infra Plan--VIB- Addendum No.3.
(dtd. 30/08/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase Infra Plan--VIA- Addendum No.9.
(dtd. 30/08/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for Solapur District Integrated Scheme/Project.
(dtd. 30/08/2010) |
|
 |
| |
|
|
|
Errata to RFP for appointment of ITIA in 35 Towns under R-APDRP Part A
RFP Identification no CE /APDRP/ Tech A /01/10-11 /version 3.0 dated 23/08/10.
(dtd. 27/08/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for evaluation of Jalgaon District Integrated Scheme / Project.
(dtd. 27/08/2010) |
|
 |
| |
|
|
|
Invitation of applications for nomination as Member on Consumer Grievances Redressal Forum, Government of Goa.
(dtd. 25/08/2010) |
|
 |
| |
|
|
|
Advertisement for engaging Consultancy Services for evaluation of Ahmednagar District Integrated Scheme / Project.
(dtd. 23/08/2010) |
|
 |
| |
|
|
|
Advertisement for engaging consultancy services for evaluation of Pune
District(Pune rural circle area) Integrated Scheme / Project.
(dtd. 23/08/2010) |
|
 |
| |
|
|
|
RFP for appointment of ITIA in 35 towns under R-APDRP Part A : RFP Identification no: CE /APDRP / Tech - A /01/ 10-11 , version 3.0.
(dtd. 21/08/2010) |
|
 |
| |
|
|
|
Publication of Advertisement for engaging consultancy services for evalation of Nashik District Integrated Scheme / Project.
(dtd. 21/08/2010) |
|
 |
| |
|
|
|
RFP for Appointment of ITIA in balance 35 Towns under R-APDRP Part A :
RFP Identification No.CE/APDRP/Tech – A/01/10-11 version 3.0
(dtd. 20/08/2010) |
|
 |
| |
|
|
|
Revising the method of filling for the posts of Upper Division Clerk (Accounts) and Upper Division Clerk (GAD).
(dtd. 13/08/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase VI B- Addendum No. 2.
(dtd. 11/08/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase VI A- Addendum No. 8..
(dtd. 11/08/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase VI Final - Addendum No. 9.
(dtd. 11/08/2010) |
|
 |
| |
|
|
|
The Pre-Bid Meeting for L.T.A.C. Static Single Phase Energy Meters 5-30 Amps with MSEDCL's officials is arranged at 16.00 hrs. on 09.08.2010 at Prakashgad, 6th Floor, Bandra(East), Mumbai-400051
(dtd. 09/08/2010) |
|
 |
| |
|
|
|
Tender SP/T-1003/0510 for LT Distribution Boxes of Various Ratings is extended upto 15=00 Hrs on 07/09/2010
(dtd. 05/08/2010) |
|
 |
| |
|
|
|
Addendum to Bidding Documents against Tender No. CE/Dist./T-01/2010-11 and Minutes of pre-bid meeting held on dt: 21.07.2010 in respect of turnkey contract for 08 nos. for 33 kV sub-station and allied works under Baramati Circle.
(dtd. 03/08/2010) |
|
 |
| |
|
|
|
Grant of Higher Grade Benefit on 3rd occasion to the employees of the MSEDCL.
(dtd. 29/07/2010) |
|
 |
| |
|
|
|
Postoned of Schedule opening Date of Commercial Bid of Tender no EE/O & M/DRN/T-2 to T-4.
(dtd. 27/07/2010) |
|
 |
| |
|
|
|
Contracts awarded under Infrastructure Projects - Issue of C-Forms to the Contracts for materials procured from outside the state of Maharashtra.
(dtd. 23/07/2010) |
|
 |
| |
|
|
|
Tentative programme for promotion panels for the year 2010 -2011 for Distribution & Civil cadre.
(dtd. 23/07/2010) |
|
 |
| |
|
|
|
Tender SP/T-1004/0610 for LTAC Three Phase Static TOD Energy Meters 10-40Amps is extended upto
15=00 Hrs on 20/08/2010 .
(dtd. 21/07/2010) |
|
 |
| |
|
|
|
Prebid held on dated 12.07.2010-Bidders queries
clarification therof as Adenda-II T-06 to T-43(2010-11) Ag Tenders
(AMZ) .
(dtd. 21/07/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase VI B- Addendum No. 1.
(dtd. 14/07/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase VI A - Addendum No. 7 .
(dtd. 14/07/2010) |
|
 |
| |
|
|
|
Infrastructure Plan Project Phase VI - Addendum No.8 .
(dtd. 14/07/2010) |
|
 |
| |
|
|
|
REVISED SCHEDULE OF E-TENDERING PROCESS IN RESPECT OF TENDER NO.CE/(DIST.)/T-01/2010-11.
(dtd. 14/07/2010) |
|
 |
| |
|
|
|
Pre bid Meeting of tender for Supply of 660 MW Power on
long-term basis under Case-I ,utilising Bhivkund Coal Block.
(dtd. 13/07/2010) |
|
 |
| |
|
|
|
Announcement for issue of Revised RFP for Appointment of ITIA in Balance 35 towns under R-APDRP Part -A
(dtd. 12/07/2010) |
|
 |
| |
|
|
|
2000 ( 20 % ) MW medium term Power Procurement bid submission date postponed (dtd. 12/07/2010) |
|
 |
| |
|
|
|
Postponed of Pre-Bid meeting Tender No CE/AMZ/AKL/T-06 to 43 in Amravati Zone .
(dtd. 08/07/2010) |
|
 |
| |
|
|
|
Request for Proposal for Appointment of SCADA / DMS Consultant (SDC).
(dtd. 08/07/2010) |
|
 |
| |
|
|
|
Addendum and time extension for REC-P:IE tenders under Karad division
(dtd. 01/07/2010) |
|
 |
| |
|
|
|
Bid Notice for RFP Identification No.CE/APDRP/SCADA/02/10-11 Dated 05.07.2010 for selection of SCADA/DMS consultant.
(dtd. 30/06/2010) |
|
 |
| |
|
|
|