Case No.
Date |
Description of matter |
Complainant |
Order dated |
View/
download |
2
2006 |
Illegal Disconnection of power supply of factory and compensation thereoff. |
M/s.Tedlecast Heavy Engineering |
4/11/2006 |
|
3
2006 |
Non payment of Interest by MSEDCL on wrongly recovered excess amount of energy bills. |
M/s. Pudmjee Paper Mills |
18/10/2006 |
|
4
2006 |
|
Shri.Santosh Goyal, 384(New) Rasta Peth Pune-11. |
18/10/2006 |
|
7
2006 |
Due to mistake in connected load by MSEDCL, fixed charges are recovered for last 10 years |
Mr.Kantilal Babasaheb Dhumal, S.No.49 Rajendranagar Anand park Wadgaonsheri Pune-14 |
20/12/2006 |
|
1
2007 |
Erronous High Bill due to incorrect meter No. on bill |
Mr.R.K.Divate, Dhankawadi |
17/02/2007 |
|
3
2007 |
Not issuing new connection after payment of estimated amount of Rs. 1,25,000/0 in May-1994 |
M/s.Omkar Sahakari Grihrachana Sanstha |
5/3/2007 |
|
4
2007 |
Refund of security deposit and slc paid for connection |
Dr.Shyam B.Mukhi,39,Tulsidas Apt. Pune-411001. |
16/04/2007 |
|
5
2007 |
Bill increasing though consumer was permanently disconnected |
Shri.Tukaram Govind Gaikwad,Aundhgaon Pune |
18/04/2007 |
|
6
2007 |
Low voltage problem |
Shri.A.V.Dixit,Anand Nagar Pune-29 |
16/05/2007 |
|
7
2007 |
Not taking reading while issuing bill and compensation thereof |
Shri.Madhav Bapat ,Sinhagad Road Pune |
4/6/2007 |
|
8
2007 |
The work under 1.3% scheme will be carried out by Dhruv Auto. The charges to be paid are incorrect |
M/s.Dhruv Autocraft Pvt.Ltd. Chikhali, Tal Haveli |
28/05/2007 |
|
9
2007 |
A.G.Connection supply cut off
not restoring time and required
compensation |
Mrs.S.A.Darekar, Tal.Shirur, Dist.Pune |
27/06/2007 |
|
10
2007 |
Cheque dishonour case and
cancellation of Dept. circular |
Shri.Ashok Suresh More,at & Post Sanaswadi Tal.Shirur,Dist.Pune |
27/06/2007 |
|
12
2007 |
Disconnect the illegally extended supply in applicant's premise |
Shri.S.N.Dhole ,Kasabapeth Pune-11 |
29/08/2007 |
|
13
2007 |
Complaint about changing tariff from commercial to residential |
Shri.J.R.Jagade,520, Shukrawarpeth Pune-2 |
17/10/2007 |
|
14
2007 |
Non sanction of development period connection |
M/s.Durabuild Techno;pgoes Pvt.Ltd., Ranjangaon Shirur |
25/10/2007 |
|
15
2007 |
Average bill with wrong method was unacceptable |
Shri.N.B.Dhighe,Tal.Shirur, Dist Pune |
7/11/2007 |
|
16
2007 |
Bill issued for 20 months without taking reading in between |
Shri.M.P.Sankpal ,Navipeth ,Pune-30 |
19/12/2007 |
|
17
2007 |
Commercial tariff applied be changed to industrial tariff. |
Shri. P.D.Shah ,Kasarwadi Pune-34 |
26/12/2007 |
|
18
2007 |
ASC & IASC charged from 2005 be refunded |
Mrs.K.M.More,Yerwada Pune-6 |
11/1/2008 |
|
19
2007 |
Recovery of wrong bill without meter verificatrion. |
Mr.S.R.Bhole,Yerwada,Pune-6 |
21/1/2008 |
|
20
2007 |
Bill be corrected as per meter reading |
Shri.Sudhir Batra,Pune-11 |
11/1/2008 |
|
21
2007 |
Paid bill in 2000 yt. But disconnection done without notice. |
Shri.G.D.Sakore, Tal.Shirur,Dist.Pune |
3/3/2008 |
|
22
2007 |
Shri.V.P.Sarangdhar,Shivajinagar Pune-4 |
Shri.V.P.Sarangdhar,Shivajinagar Pune-4 |
21/1/2008 |
|
23
2007 |
For industrial consumer commercial tariff was applied since 2001 Feb. |
Shri.Pathak S.M. Pune Satara Road Pune |
5/3/2008 |
|
25
2007 |
On 26/03/07 supply failed for 12 Hrs. |
Shri.A.S.Phatak,Erandavane,Pune-4 |
20/2/2008 |
|
1
2008 |
Billing complaint ,Bills are not as per DTC meter |
Mr.Kohali, Katraj Pune |
10/3/2008 |
|
2
2008 |
Biling complaint |
Shri.Chandrakant Bajirao Chavan |
26/3/2008 |
|
3
2008 |
Change of tariff |
M/s.Hasina Resort,Tungarli |
26/5/2008 |
|
4
2008 |
Billing complainant for excess bill. |
Shri.R.L.Lakhawade,Yerwada Pune-6 |
30/06/2008 |
|
5
2008 |
Correction of bill, provision of transformer and not depositing cheque |
Shri.Girish Sanghavi,Khetewadi Mumbai |
18/06/2008 |
|
6
2008 |
Billing complaint and compensation for wrong billing |
Shri.R.R.Mandhare,Vaiduwadi Hadapsar |
16/07/2008 |
|
7
2008 |
Service wire stolen and bill issued for non supply |
Shri.Sonawane,Tanaji Madhavrao, Tal.Daund,Dist.Pune |
13/08/08 |
|
8
2008 |
Supply disconnected without serving disconnection notice |
Shri.Paranjape Chandrakant Keshav,Aranyeshwar,Taware colony |
21/08/08 |
|
9
2008 |
A.G.Connection supply cut off not restoring time and required compensation |
Shri.V.V.Sahashtrabudhe,Talegaon Dabhade |
1/9/2008 |
|
10
2008 |
Cheque dishonour case and cancellation of Dept. circular |
Shri.Shripad Deshmukh,Shaniwarpeth Pune-30 |
10/9/2008 |
|
11
2008 |
Requirement of new connection against arrears on premises |
Mrs.S.S.Chitnis,Bhandarkar road Pune-4 |
24/09/2008 |
|
12
2008 |
Recovery of slow meter by flying squad and correction of bill |
Shri.D.K.Choudhari, Dhankawadi,Pune |
29/09/2008 |
|
13
2008 |
Non release of A.G.connection hence Compensation |
Shri.S.S.Dhavale,Tal.Shirur.Dist.Pune |
13/10/08` |
|
14
2008 |
Change of Name of H.T.Connekction |
M/s.Swarovski India Pvt.Ltd. Ranjangaon,Shirur |
27/10/2008 |
|
15
2008 |
Rrefund of bill of theft case |
M/s.Techno Auto Craft, Akurdi Bhosari |
26/11/08 |
|
16
2008 |
H.T.connection refund of bills for late applying of MF. |
M/s.Venko Research & Breeding Farms,Ltd. Singhagad road Pune |
5/11/2008 |
|
17
2008 |
Bills issued without taking reading and required compensation |
Shri.S.K.Dharane,Sahakarnagar Pune-9 |
26/11/08 |
|
18
2008 |
Late distribution of bill and required refund of prompt discount payment |
Shri.V.A.Lele,Bhandarkar road Pune-4 |
10/11/2008 |
|
19
2008 |
| Billing complaint due to meter change and ompenation requird |
|
Smt.V.P.Musale, Chinchad PUNE |
26/11/2008 |
|
20
2008 |
Interruption in power supply |
Mr.Damale, Chintamaninagar,Wadgaon Maval |
17/12/2008 |
|
21
2008 |
Release of new service connection Mr.K.B.Kasabe,Kondhwa |
Withdrawn case as compramised |
10/12/2008 |
|
22
2008 |
Billing complaint for wrong reading |
Shri.S.K.Pawar,Thergaon |
29/11/2008 |
|
23
2008 |
Illegal disconnection of supply |
Shri.K.B.Manyar, |
12/01/2008 |
|
24
2008 |
Billing complaint |
Shri.P.V.Poul,Susgaon |
21/01/2008 |
|