Commercial Circulars

Sr. No. Subject Reference No.
311 Commercial Circular No. 311: Revision in Electricity Tariff w.e.f. 1st September 2018 and Implementation thereof. [For control period 2018-19 (From Sep 2018) and 2019-20]. P-Comm/Tariff/23347
Date: 01/10/2018
310 Commercial Circular No. 310: Third Amendment to Comm. Cir. No. 258 dated: 25.01.2016 in the matter of
MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations,
2015— Procedure for Application, methodology for Metering & Billing, etc.
CE/Comm./Solar Net metering/3rd Amendment /20173
Date: 20/08/2018
309 Commercial Circular No. 309: Release of connections with multiple metering p in respect of consumers in Distribution Franchisee through MOU route area having vertical bus risers. PR3/Cos/DF(MOU)/18902
Date: 03/08/2018
308 Commercial Circular No. 308: Revision in Allowable Distribution Losses and Reimbursement Charges of Distribution Franchisee through MOU route in Urban Township area. PR3/Cos/DF(MOU)/15733
Date: 28/06/2018
307 Commercial Circular No. 307: SECOND AMENDMENT TO COMMERCIAL CIRCULAR NO.258 CE/Comm./Solar Net metering/2nd Amendment/14080
Date: 07/06/2018
306 Commercial Circular No. 306: शासकीय निवासस्थानी राहणाऱ्या अधिकारी /कर्मचारी यांनी निवासस्थान सोडताना महावितरणकंपनीकडून वीज देयकाची थकबाकी नसल्याबद्दलचे प्रमाणपत्र संबंधित कार्यालयाकडे सादर करण्याबाबत ED(Billing)/12001
Date: 01/06/2018
305 Commercial Circular No. 305: Revised Online Bill correction procedure for immediate implementation ED(Billing)/12001
Date: 25/05/2018
304 COMMERCIAL CIRCULAR NO. 304: “AMNESTY SCHEME – 2018” for Permanently Disconnected HT/LT Industrial Consumers. P-Com/Amnesty Scheme/11465
Date: 21/05/2018
303 COMMERCIAL CIRCULAR NO. 303: Setting time frame along with roles and responsibilities for the process of determining Captive Power Plant (CPP) status CE/Comm/Open Access/Captive Status/9680
Date: 26/04/2018
302 COMMERCIAL CIRCULAR No. 302:Revision in Electricity Tariff with effect from 1 April, 2018 and Implementation thereof. CE (COmm.)/Tariff/06990
Date: 31/03/2018
301 वाणिज्य परिपत्रक क्र. ३०१: विदर्भ, मराठवाडा ,उत्तर महाराष्ट्र, D व D+ क्षेत्रातील औद्योगिक ग्राहकांच्या वीज दरातील सवलतीबाबत सुधारित आदेश PR-3/Subsidy/2202
Date: 31/01/2018
300 वाणिज्य परिपत्रक क्र. ३००: विषय : २०१७ च्या खरीप हंगामामध्ये राज्यातील तालुक्यांमध्ये दुष्काळ घोषित करून विविध उपाय योजना व मदत जाहीर करणेबाबत
: कृषिपंपाच्या चालू बिलात ३३.५% सूट व टंचाई जाहीर केलेल्या गावात शेतकऱ्यांच्या शेतीपंपाची वीजजोडणी खंडित ना करण्याबाबत
PR-3/Subsidy/1229
Date: 17/01/2018
299 वाणिज्य परिपत्रक क्र. २९९: शेतकऱ्यांसाठी सुरळीत वीज पुरवठा , योग्य वीज देयक व शासन सवलतीच्या दरानुसार वीज देयक वसुली. ED Billing/AG /31725
Date: 28/12/2017
298 COMMERCIAL CIRCULAR No. 298 (Amendment to Commercial Circular No.224)- Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014 -Implementation thereof. Co-ord cell/LT Ext/30852
Date: 16/12/2017
297 COMMERCIAL CIRCULAR No. 297- revised guidelines for releasing LT Industrial connection up to 150 KVA. Co-ord cell/LT Sanction/028919
Date: 24/11/2017
296 वाणिज्य परिपत्रक क्र. २९६: “मुख्यमंत्री कृषी संजीवनी योजना २०१७” योजनेत सहभागी होण्यासाठी शेतकऱ्यांना सवलत Date: 24/11/2017
295 वाणिज्य परिपत्रक क्र. २९५: कृषी ग्राहकांकडील वीज बिल थडबाकीमध्ये सवलत देण्यासाठी “मुख्यमंत्री कृषी संजीवनी योजना २०१७” ला मुदतवाढ देण्याबाबत Date: 18/11/2017
294 वाणिज्य परिपत्रक क्र. २९४: कृषी ग्राहकांकडील वीज बिल थकबाकीमध्ये सवलत देण्यासाठी “मुख्यमंत्री कृषी संजीवनी योजना २०१७” Date: 01/11/2017
293 COMMERCIAL CIRCULAR No. 293- Residential & Agricultural Amnesty Scheme 2018. P-Com/Accts/R&A Amnesty/22201
Date: 13/09/2017
292 COMMERCIAL CIRCULAR No. 292- Tariff of Renewable Energy Projects for the period from 1st April 2017 to 31st March 2018. CE/PP/NCE/Tariff/17046
Date: 13/07/2017
291 Commercial Circular 290- Revised-delegation of powers in respect of Load sanction, Estimate sanction, Inspection of HT consumer installation, fixing of point of supply, approval of SLD and metering specification thereof & Procedure for release of new HT Connections. ED (Dist-II)IHT-Conn/Metering/15940
Date: 29/06/2017
290 Commercial Circular 290- Incentive to Retired Employees of MSEDCL for PD Recovery P-Com/Accts/PD Amnesty/015311
Date: 21/06/2017
289 वाणिज्य परिपत्रक क्र. २८९: विदर्भ, मराठवाडा ,उत्तर महाराष्ट्र, D व D+ क्षेत्रातील औद्योगिक ग्राहकांच्या वीज दरातील सवलतीबाबत सुधारित आदेश PR-3/Subsidy/13982
Date: 06/06/2017
13811 Commercial Circular No. 13811 - Foremost steps to be taken to wipe out average / faulty / abnormal billings CMD/MSEDCL/13811
Date: 03/06/2017
288 Commercial Circular No.288 - Guide Book for actions regarding theft of electricity u/s 135 and u/s 126 of Electricity Act, 2003. P-Com/Theft/Guide Book/11119
Date: 12/05/2017
287 Commercial Circular No. 287: Extension of Nav Prakash Yojana FY 2016-17. P-Com/ Accts/PD-Amnesty/10019
Date: 29/04/2017
286 Commercial Circular No. 286: Revised guidelines regarding sanction of LT connection within seven days. Co-ord cell/LT Sanction/09761
Date: 27/04/2017
285 Commercial Circular No. 285: Calibrated actions in respect of Collection Efficiency and Billing Efficiency. P-Com/ Accts/08787
Date: 18/04/2017
284 Commercial Circular No. 284: Revision in Electricity Tariff with effect from 1st April 2017 and Implementation thereof. CE (Comm.)/Tariff/7891
Date: 11/04/2017
283 विषय : महाराष्ट्रातील पाणी पुरवठा योजनांना वीज बील भरण्यास द्यावयाच्या सवलीबाबत. पी -कॉम/लेखा /पाणी पुरवठा/सवलत/NO -६०६२
दिनांक : १७-०३-२०१७
282 Commercial Circular No 282 : Extension of period of “Nav Prakash Yojana 2016-17” P-COM/Accts/04658
Date: 28/02/2017
281 Commercial Circular No. 281 – 100% use of Online system for Industrial & Commercial consumers for New Connections and Load enhancement / reduction. Co-ord celI/Online System/04681
Date: 28/02/2017
280 Amalgamation of load sanction circular No. 225 and CE/Dist/D-III/16037 dated 08.06.2012 & processing of applications through online process only. P-COM/NSC/ 02667
Date: 04/12/2017
278 Inspection of internal installations by Third Party PR-3/COS/ 19478
Date: 20/06/2016
277 Commercial Circular No.277 – Modification Nav Prakash Yojna 2016-17 P-Com/Accts/000203
Dt. 04/01/2017
276 Commercial Circular No.276: (Amendment to Commercial Circular No.258) CEPP/NCE/SoIar/Net metering/Amendment/34477
Dt. 19/11/2016
275 Commercial Circular No.275 – Revision in Electricity Tariff – Implementation thereof. CE (Comm.)/Tariff/ 34460
Dt. 18/11/2016
274 Commercial Circular No.274 – About Residential Electricity Connection P-Com/Residential Electricity Connection/33905
Dt. 11/11/2016
273 Commercial Circular No. 273 – Revised Rates of Electricity Duty Notified by the GoM wef Sept. 2016. P-Com/Accts/Elect Duty/033861
Dt. 10/11/2016
272 Commercial Circular No.272 – Withdrawal of legal tender character of existing Rs.500/- & 1000/-Bank notes and extension of due date & time limit for prompt payment discount for LT consumers P-Com/Accts/Billing/33798
Dt. 10/11/2016
271 Commercial Circular No.271 – Revision in transmission charges and transmission losses for open Access consumer CE/Comm/OA/Tr charges/31439
Dt. 15/10/2016
270 Commercial Circular No.270 – Guidelines for Implementation of Amnesty Scheme for PD Consumers 2016-17 P-Com/Accts/31133
Dt. 10/10/2016
269 Commercial Circular No.269 – Amnesty Scheme for PD Consumers 2016-17 P-Com/Accts/029536
Dt. 27/09/2016
268 Commercial Circular No. 268 – Maharashtra Duty Act,1958 regarding charging of Electricity Duty & its Refund P-Com/Accts/Elect Duty Refund/029535
Dt. 27/09/2016
267 Circular No.267: Tariff of Non-conventional Energy (NCE)/ Renewable Energy (RE) Projects for the period from 1st April 2016 to 31st March 2017. CE/Comm/CP/NCE/Tariff/24772
Dt. 04/08/2016
266 Circular No.266: Concession to Industrial consumers in Vidharbha, Marathwada, North Maharashtra, D and D+ region PR-3/Subsidy/24229
Dt. 30/07/2016
265 सन २०१५-१६ च्या रब्बी हंगामातील पिकांची हुंगामी पैसेवारी ५० पैस्यापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत
-वीज बिलात ३३. ५% इतकी सूट व दुष्काळसदृश परिस्तीथी जाहीर केलेल्या गावातील कृषीपम्पाचा वीज पुरवठा खंडित ना करणे .
पीआर – ३/सबसीडी /१७९८४
दिनांक : ०३-०६-२०१६
264 वीज चोरी प्रकरणातील ग्राहकांच्या वीज कायदा -२००३ कलाम १३५ अन्वये घडलेल्या गुन्ह्याच्या तडजोड अर्जाबाबत मार्गदर्शक सूचना(तत्वे) पी -कॉम/ १३७१४
दि . ६-०५-२०१६
263 Exemption of Electricity Duty to New Information Technology or Information Technology Enabled Services (IT or ITES)Units P-Com/Accts/Elect Duty/011866
Dt. 26/04/2016
262 MERC Clarificatory Order dt. 29/01/2016 in the matter of Tariff Order dt. 26/06/2015 in Case No. 121 of 2014.
– Corrigendum to Commercial Circular No. 243 dt. 03/07/2015.
PR-3/Tariff/8054
Dt. 15/03/2016
261 फीडर व्यवस्थापक योजनां -मार्गदर्शकतत्वे (वाणिज्य परिपत्रक क्र . २३९ शुद्धिपत्र ) क्र .फिडर व्यवस्थापक योजना/७७४९
दि . १०-०३-२०१६
260 Tariff of Non-conventional Energy (NCE)/ Renewable Energy (RE)
Projects for the period from 10th November 2015 to 31st March 2016.
CE/Comm/CP/NCE/Tariff/6699
Dt. 26/02/2016
259 Revival of Help Desk for HT Consumer Co.ord Cell/HT/Help Desk/4273
Dt. 06/02/2016
258 Connectivity to the Distribution network of MSEDCL for Consumers installing solar PV projects/systems below 1 MW on Rooftop or any
mounting structure in their premises under the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015— Procedure for Application, methodology for Metering & Billing, etc.
Comm/CP/Solar-Net metering/3051
Dt. 25/01/2016
257 राज्यातील यंत्रमागधारक ग्राहकांना पुरविण्यात येणाऱ्या विजेच्या दारात सुधारणा करणेबाबत पीआर – ३/सबसीडी /२७४०
दि . २0-01-२०१6
256 सन २०१५-१६ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत क्र . पीआर – ३/सबसीडी /४२४४७
दि . २२-१२-२०१५
255 शासकीय (महावितरणचे कामकाज )सोयी /सुविधांकरिता शपथपत्राऐवजी स्वघोषणापत्र व कागदपत्रांच्या स्वयंसाक्षांकित प्रति स्वीकारणेबाबत . पी -कॉम/स्वयंसाक्षांकित/ ४१०४०
दि . ०७-१२-२०१५
254 Average And Excessive Billing P-COM/ACCT/BILLING/041037
Dt. 07/12/2015
253 सन २०१५-१६ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत क्र .पीआर – ३/सबसीडी /४०१४१
दि . २६-११-२०१५
252 राज्यातील पाणी पुरवठा योजनांसाठी “पेयजल पाणी पुरवठा संजिवनी योजना -२०१५”राज्यात लागू करण्याबाबत. क्र .पीआर – ३/पेयजल पाणी पुरवठा संजिवनी योजना/४०१२८
दि . २४-११-२०१५
251 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४”ला दि. ३१-०३-२०१६.पर्यंत मुदतवाढ देणेबाबत. क्र .पीआर – ३/कृषी संजीवनी २०१४/४०१२७
दि . २४-११-२०१५
250 Corrigendum to Commercial Circular No. 224 dt. 05.07.2014. Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution licensees, Period for Giving Supply and Determination of Compensation)Regulations, 2014.- Implementation thereof PR-3/COS/SoP/36694
Dt. 15/10/2015
249 Grant of Open Access to Consumers sourcing power from Renewable energy
generators (Such as Wind, Biomass, Bagasse, Solar, Small Hydro etc.)
— Procedure for Application, levy of Cross Subsidy Surcharge, Standby
supply charges & Additional Charges, Metering & Billing, etc.
Comm/CP/RE-Open Acess/34457
Dt. 19/09/2015
248 धार्मिक उत्सवांना तात्पुरत्या स्वरूपात वीज पुरवठा करणेबाबाबत क्र .पीआर – ३/टॅरिफ /३३९०७
दि . ११-०९-२०१५
247 Revised Guidelines regarding Sanction & Release of Loads without NoC from MSETCL. PR-3/Co-ord Cell/Load Sanction/32086
Dt. 25/08/2015
246 Permission for change of consumer tariff category from HT-Continuous to HT-Non-Continuous- Procedure thereof. PR-3/Tariff/30803
Dt. 11/08/2015
245 On-line Facilities available to prospective consumers and reduction in number of documents to be submitted along with the Application for power supply PR-3/COS/SoP/36694
Dt. 15/10/2015
244 राज्यात माहे फेब्रुवारी व मार्च ,२०१५ मध्ये अवेळी पाऊस व गारपीट यामुळे झालेल्या जीवित व वित्तहानीपोटी आपद्ग्रस्तांना मदत व सवलत देण्याबाबत .
कृषिग्राहकांना तिमाही वीज बिलात माफी .
क्र .पीआर – ३/सबसीडी /२९९१२
दि . १-०८-२०१५
243 Revision in Electricity Tariff w.e.f. 1 June 2015 – Implementation thereof PR-3/Tariff/27641
Dt. 03/07/2015
242 राज्यात माहे नोव्हेंबर व डिसेंबर ,२०१४ मध्ये अवेळी पाऊस व गारपीट यामुळे झालेल्या जीवित व वित्तहानीपोटी आपद्ग्रस्तांना मदत व सवलत देण्याबाबत . क्र .पीआर – ३/सबसीडी /२२५६२
दि . २०-०५-२०१५
241 महाराष्ट्र शुल्क अधिनियम ,१९५८ विद्युत शुल्क वसुली व परताव्याबाबत क्र .पी -कॉम/विद्युत शुल्क/ २२४१३
दि . १८-०५-२०१५
240 Revised Guidelines regarding Standars of Performance (SoP) No. Co-Ord Cell/Make in India/21283
Dt. 02/05/2015
239 फीडर फ्रॅंचाईजी व्यवस्थापक योजना -सुधारित मार्गदर्शकतत्वे क्र .फिडर व्यवस्थापक योजना/२१२८२
दि . ०२-०५-२०१५
238 फीडर फ्रॅंचाईजी व्यवस्थापक योजना – मार्गदर्शकतत्वे दि . २०-०४-२०१५
237 महावितरण कंपनीच्या कृषी ग्राहकांना वीज दरात सवलत देण्याबाबत क्र .पीआर – ३/सबसीडी /९६९
दि . १२-०१-२०१५
236 महावितरण कंपनीच्या औद्योगिक ग्राहकांना डिसेंबर २०१४ च्या वीज दरात सवलत देण्याबाबत . No. PR-3/Subsidy/38339
Dt. 26/12/2014
235 सन २०१४-१५ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत
-वीज बिलात ३३. ५% इतकी सूट व दुष्काळसदृश परिस्तीथी जाहीर केलेल्या गावातील कृषीपम्पाचा वीज पुरवठा खंडित न करणे .
No. PR-3/Subsidy/37828
Dt. 20/12/2014
234 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४”ला मुदतवाढ देणेबाबत. PR-3/Krishi Sanjivani-2014/37827
Dt. 20/12/2014
233 सन २०१४-१५ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत
-वीज बिलात ३३. ५% इतकी सूट व दुष्काळसदृश परिस्तीथी जाहीर केलेल्या गावातील कृषीपम्पाचा वीज पुरवठा खंडित न करणे .
No. PR-3/Subsidy/35804
Dt. 04/12/2014
232 विशेष अबाहय योजनेला (स्पेशल अमेनिस्टी स्कीम )मुदतवाढ करून देण्याबाबत . No. PR-3/Abhay Yojana/31831
Dt. 20/10/2014
231 Levy of Transmission Charges & Losses for Open Access RUC/OA/Tr.Charges/30596
Dt. 07/10/2014
230 Applicability of HT/LT PWW Tariff for MIDC’s Water Works & Sewage Treatment Plant PR-3/Tariff/28796
Dt. 15/09/2014
229 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४”ला मुदतवाढ देणेबाबत. PR-3/Krishi Sanjivani-2014/28636
Dt. 12/09/2014
228 Tariff of Non-conventional Energy (NCE)/ Renewable Energy (RE) Projects for FY 2014-15. Comm/CP/NCE/Tariff/28362
Dt. 10/09/2014
227 राज्यातील १२३ तालुक्यात टंचाई परिस्तिथी जाहीर करण्यात आलेल्या गावातील कृषी ग्राहकांना वीज बिलात ३३% सवलत देण्याबाबत PR-3/Subsidy/27769
Dt. 05/09/2014
226 Compulsory use of Online New Connection System (NC) for New Connections and Load enhancement / reduction of existing Consumers. Ref. No. Dir.(Operations)/Comm/26138
Dt. 20.08.2014
225 Re-delegation of powers in respect of load sanction No. Co-ord cell/Re-delegation of power/21383
Dt. 05/07/2014
224 Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014. – Implementation thereof PR-3/Tariff/21382
Dt. 05/07/2014
223 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४” PR-3/Krishi Sanjivani-2014/19900
Dt. 20/06/2014
222 राज्यात माहे फेब्रुवारी व मार्च २०१४ मध्ये अवेळी पाऊस व गारपीटीमुळे शेती/फळ पिकांचे झालेल्या नुकसानीकरता विशेष पॅकेजद्वारे वीज बिळात सूट देणेबाबत. क्र .पीआर – ३/सबसीडी /१०८३६
Dt. 02/04/2014
221 Applicability of Interim Charges, GENCO Charge & TRANSCO Charge to be levied to all consumer categories for 12 months as per MERC Orders. PR-3/Tariff/9001
Dt. 15/03/2014
220 Corrigendum to Commercial Circular No. 194 dated 09.04.2013 in the matter of Grant of Open Access to Consumers Sourcing power from Renewable energy generators (Such as Wind, Solar, Small Hydro, Bagasse, Biomass etc.) — Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Billing, etc. CE/Comm/CP/RE-OA/7274
Dt.01/03/2014
219 Guidelines for converting single point supply consumers to Distribution Franchise through MOU route CE-Comm/CP/DF/6738
Dt. 28/02/2014
218 Concession in Electricity Tariff by Govt. of Maharashtra PR-3/Tariff/5791
Dt. 18/02/20144
217 Special Amnesty Scheme (Vishesh Abhay Yojana) under Maharashtra Industrial Policy 2013 for closed industrial units which are beyond the scope of rehabilitation – Delegation of Powers forimplementation of scheme. PR-3/Special Amnesty Scheme/1492
Dt. 17/01/2014
216 Regarding revised Cross Subsidy Surcharge (CSS) applicable for Open Access consumer with effect from 1st September 2013 upto 28th February 2014. No. CE/Comm/CP/CSS/33296
Dt. 07/12/2013
215 Corrigendum to Commercial Circular No. 213 dt. 10/10/2013.-Write off of Bad Debts in respect of Rural / Urban Public Water Works held by LSG and LIS operated by Co-operative Societies where decree is
not executed.
PR-3/Abhay Yojana/31182
Dt. 18/11/2013
214 Increase in Time of Day (ToO) rebate for off-peak consumption. – Continuing for further period from 1 October, 2013 till the issuance of new Tariff Order. PR-3/Tariff/28283
Dt. 10/10/2013
213 1) Write off of Bad Debts in respect of Rural/Urban Public Water Works (Live and PDconsumers) where decree is not executed. 2) Extension to the due date of “Abhay Yojana” for further period of six months upto 31st March,2014 PR-3/Abhay Yojana/28175
Dt. 10/10/2013
212 Guidelines regarding applicability of tariff for IT and ITES Units. PR-3/Tariff/27481
Dt. 01/10/2013
211 Special Amnesty Scheme (Vishesh Abhay Yojana) under Maharashtra Industrial Policy 2013 for closed industrial units which are beyond the scope of rehabilitation. PR-3/Special Amnesty Scheme/27480
Dt. 01/10/2013
210 Redressal of cases where the bills are issued even after permanent disconnection. PR-3/COS/25698
Dt. 16/09/2013
209 Recovery of Additional Energy Charges and Additional FAC- Implementation of MERC
Orders thereof.
PR-3/Tariff/25287
Dt. 07/09/2013
208 New Tariff Category “HTX-Ports” applicable w.e.f. 1st August 2012. REF. PR-3 / TARIFF/ NO 25134
Dt. 06/09/2013
207 Change of Category of Consumer, who runs Small Business from part of
Residential Premises.
PR-3/Tariff/24539
Dt. 02/08/2013
206 Revision of Compounding Charges payable as per sec. 152 of Electricity Act-2003 CE/Comm/23646
Dt. 22/08/2013
205 धार्मिक उत्सवांना तात्पुरत्या स्वरूपात वीज पुरवठा करणेबाबत. PR-3/Tariff/23085
Dt. 17/08/2013
204 Procedure for refund of Electricity Duty to Duty Exempted Consumers. P-Com/Accts/ED-Exmp/22550
Dt. 08/08/2013
203 Application of “HT IX – Public Service” Tariff Category to “Spiritual
Organisation which are service oriented” w.e.f. 1st August 2012.
PR-3/Tariff/19768
Dt. 16/07/2013
202 Ref: 1. Commercial Circular No. 133 dated 15.02.2011.
2. Government Notification dated 14 May 2013.
No. P-com /Theft / ti 1 9 1 4 0
Date: 08 JUL 2013
201 31st March 2012 under “Abhay Yojana” in respect of Rural/Urban Public Water
Works (Live and PD consumers).
REF.PR-3/Abhay Yojana/ MJ1 9 1 3 8
REF.PR-3/Abhay Yojana/ MJ1 9 1 3 8
200 Section 126: Unauthorized use of electricity – guidelines thereof. No. P-com / Theft / no 18884
Dt. 05/07/2013
199 Corrigendum to Commercial Circular No.190 dated 14.03.2013 and 194 dated
09.04.2013 in the matter of CSS applicable to RE open access.
CE/Comm/CP/CSS/Corrigendum/ 17728
Dt. 25/06/2013
198 Levy of transmission charges and losses for Open Access. Comm/SOC/OA/Tr.Charges/16711
Dt. 12/06/2013
197 सन २०१२-१३ च्या रब्बी अंतिम हंगामातील ५० पैशापेक्षा कमी अंतिम पैसेवारी असलेल्या टंचाईग्रस्त परिस्तीथी जाहीर करण्यात आलेल्या गावातील कृषिग्राहकांना वीज बिलात ३३. ५% सवलत देणेबाबत. PR-3/SUBSIDY/12434
Dt. 09/05/2013
196 Tariff of Non-coventional Energy(NCE)/ Renewable Energy Projects for
FY 2013-14
CE/COMM/CP/NCE/Tariff/11675
Dt .29.04.2013
195 Inclusion of Live and P.D. Street Light Connections of Mahanagar Palika
& Nagar Palika and Live HT LIS & Extension to “Abhav Yojana” for
implementation thereof.
PR-3/Abhay Yojana/105174
Dt. 15/04/2013
194 Grant of Open Access to Consumers Sourcing power from Renewable Energy
Generators (Such as Wind, Solar, Small Hydro) — Procedure for
Application, levy of Cross Subsidy Surcharge, Standby Charges &
Additional Charge, Metering & Billing, etc.
CE/Comm/CP/Open Access/ RE/ 10075
Dt. 09/04/2013
193 Monitoring of B-80 proposals by Zone, Circle and Division offices P-Com/Accts/B-80/9307
Dt. 02/04/2013
192 Increase in Time of Day (ToD) rebate for off-peak consumption.
– Continuing up to September 2013 there off.
PR-3/Tariff/9257
Dt. 01/04/2013
191 Clarification regarding Directives under Commercial Circular No.143 PR-3/COS/DF/8207
Dt. 20/03/2013
190 Regarding revised Cross Subsidy Surcharge (CSS) applicable for Open Access consumer. CE/Comm/CP/CSS/ 7511
Dt. 14/03/2013
189 सन २०१२-१३ च्या खरीप हंगामातील ५० पैशापेक्षा कमी अंतिम पैसेवारी असलेल्या टंचाईग्रस्त परिस्तीथी जाहीर करण्यात आलेल्या गावातील कृषिग्राहकांना वीज बिलात ३३. ५% सवलत देणेबाबत. PR-3/Subsidy/7260
Dt. 12/03/2013
188 यंत्रमागधारकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. PR-3/Subsidy/6700
Dt. 05/03/2013
187 Online New Connection & Web Self Service Systems PR-3/COS/5091
Dt. 15/02/2013
185 Levy of transmission charges and losses for Open Access Comm/SOC/OA/Tr. Charges/3357
Dt. 01/02/2013
184 टंचाईग्रस्थ गावातील स्वतंत्र ग्रामीण पाणीपुरवठा योजनांच्या दि १ एप्रिल २०१२ पासूनच्या चालू वीज देयकाचा भरणा कारणाच्या शासनाच्या तरतुदीबाबत . PR-3/Subsidy/839
Dt. 11/01/2013
183 Increase in Time of Day (ToO) rebate for off-peak consumption. PR-3/Tariff/333
Dt. 04/01/2013
182 Extension to the due date of “Abhay Yojana” for Recovery of arrears PR-3/Tariff/33662
Dt. 05/12/2012
181 यंत्रमागधारकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. PR-3/Subsidy/34342
Dt. 12/12/2012
180 Application of tariff category to Printing Press. PR-3/Tariff/33662
Dt. 05/12/2012
179 यंत्रमागधारकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. क्र. पी .आर -३/सबसिडी /No 33247
Dt. 01/12/2012
178 कृषीपंपधारक ग्राहकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. क्र. पी .आर -३/सबसिडी /No 32019
Dt. 16/11/2012
177 Change of Category of Commercial/Industrial Consumers. PR-3/Tariff/27190
Dt. 25/09/2012
176 कृषी ग्राहकांकडील थकबाकी वसुलीकरता “कृषी संजीवनी योजना -२०११” ची अंबलबजावणी व शेवटचे वीज देयक करणेकरीता अंगारलेली पध्दत . PR-3/Krishi Sanjivani/26424
Dt. 14/09/2012
175 Revision in Electricity Tariff – Implementation thereof.
HT – LT Tariff Booklet
PR-3/Tariff/25230
Dt. 05/09/2012
174 Schedule of charges along with applicable wheeling charges and losses for OpenAccess in the FY2012-13. Comm/SOC/OA/25229
Dt. 05/09/2012
173 Accounting of auxiliary consumption on feeders going to MSPGCLfrom
MSETCL/MSEDCL Sub Stations & netting off thereof.
PR-3/General/21463

Dt. 26/07/2012

172 Extension for implementation of “Abhay Yojana”.
– Change in cut-off date to write off of bad debt of PD AG consumer.
PR-3/Abhay Yojana/18317
Dt. 30/06/2012
171 Corrigendum to Commercial Circular No. 149 dt. 04/11/2011.
– Issue raised by M/s Torrent Power Ltd, M/s. SPANCO & M/s GTL on
Commercial Circular No 149 regarding Additional Charges
PR-3/Tariff/17155
Dt. 20/06/2012
170 Grant of Open Access Permission for Fossil Fuel based Captive Power
Plants (CPP) -EMBEDDED and NON EMBEDDED CPP’s-Procedure for Application,
levy of Cross Subsidy Surcharge, Standby Charges& Additional
Charge, Metering & Billing, etc.
CE/Comm/CP/Open Access/ CPP/16411
Dt. 13/06/2012
169 Grant of Open Access to Consumers sourcing power from Conventional
Generator (Except for Non Conventional Energy Generator & captive
Power Plants)- Procedurefor Application, levy of CrossSubsidy Surcharge,
Standby Charges& Additional Charge, Metering & Billing, etc.
CE/Comm/CP/Open Access/ General/16410
Dt. 13/06/2012
168 Applicability of Tariff to Liquefied Petroleum Gas (LPG) Bottling Plant. PR-3/Tariff/15570
Dt. 04/06/2012
167 Implementation of Pilot Scheme in respect of PWW consumers. P-Com/PWW Pilot/14913
Dt. 29/05/2012
166 Methodology for calculation of interest in One Time Settlement package. P-Com/Recovery/14256
Dt. 22/05/2012
165 Installation of Prepaid Meters at Government owned residence of
employees (with transferable jobs) of various courts, State Government,
Central Government, Local Bodies, etc; Procedure to be followed while
installing the same.
P-Com/Prepaid Meter/13434
Dt. 14/05/2012
164 Tariff of Non-conventional Energy (NCE)/ Renewable Energy Projects for FY2012-13. CE/Comm/CP/NCE/Tariff/10212
Dt. 20/04/2012
163 ““Abhay Yojana” Schemes for Recovery of arrears from:
1. Live & PD Public Water Works
2. PD Industrial Consumers
3. Live & PD Residential (BPL/Tribal/RGGVY Consumers)
4. Other Residential Consumers (Only PD)
5. PD Agricultural consumers
PR-3/Abhay Yojana/10045
Dt. 19/04/2012
162 सन २०११-१२ च्या खरीप हंगामातील ५० पैशापेक्षा कमी अंतिम पैसेवारी असलेल्या गावांना उपाययोजना व सवलती देणेबाबत.
PR-3/Subsidy/9196
Dt. 09/04/2012
161 Corrigendum to Commercial Circular No. 145 dated 29.09.2011.
• Theft of electricity under Section 135 of Electricity Act, 2003
– Monetary Rewards to outsider informants/MSEDCL employees.
PR-3/COS/8047
Dt. 29/03/2012
160 Release of connections to the consumers after payment of proportionate
amount of arrears and submission of undertaking for proportionate total
arrears as per Commercial Circular No. 53.
PR-3/COS/8047
Dt. 29/03/2012
159 सन २०११-१२ मध्ये टंचाईग्रस्त परिस्तीथी जाहीर करण्यात आलेल्या गावातील कृषिग्राहकांना वीज बिलात सवलत देणेबाबत. PR-3/Jivan Sanjivani/4741
Dt. 23/02/2012
158 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या ” जीवन संजीवनी ” योजनेला ३१ मार्च २०१२ पर्यंत मुदतवाढ PR-3/Jivan Sanjivani/4741
Dt. 23/02/2012
157 Appellate Authority for the purpose of Section 127 of Electricity Act 2003. P-Com/Theft/3698
Dt. 09/02/2012
156 Grant of Open Access Permission for Fossil Fuel based Captive Power
PlantsGrant of Open Access Permission for Fossil Fuel based Captive
Power Plants (CPP) – EMBEDDED and NON EMBEDDED CPP’s-Procedure for
Application, levy of Cross Subsidy Surcharge, Standby Charges &
Additional Charge, Metering & Billing, etc.
CE/Comm/CP/Open Access/ CPP/221
155 Grant of Open Access to Consumers Sourcing power from Renewable energy
generators (Such as Wind, Biomass, Bagasse, Solar, Small Hydro etc.) —
Procedure for Application, levy of Cross Subsidy Surcharge, Standby
Charges & Additional Charge, Metering & Bil
CE/Comm/CP/Open Access/ RE/2213
154 “Grant of open access to Consumers sourcing power from Conventional
Generator (Except for Non Conventional Energy Generator & captive
Power Plants)- Procedure for Application, levy of Cross Subsidy
Surcharge, StandbyCharges & Additional Charge, Metering &
Billing etc. “
CE/Comm/CP/Open Access/ General/2212
153 कृषी ग्राहकांकडील थकबाकी वसुलीकरता “कृषी संजीवनी योजना -२०११” ला ३१ मार्च २०१२ पर्यंत मुदतवाढ क्र. पी .आर -३/कृषी संजीवनी /२२७
Dt. 03/01/2012
152 Corrigendum to Commercial Circular No. 151-Release of power supply to
individual entrepreneurs commong under one premises through
multi-partite agreement – Redelegation of powers
PR-3/COS/38365
Dt. 29/12/2011
151 Release of power supply to individual entrepreneurs commong under one
premises through multi-partite agreement – Rdelegation of powers
PR-3/COS/35111
Dt. 25.11.11
150 Additional Charge to be levied to all consumer categories for _12_months w.e.f, 1st
November 2011.
REF.PR-3 / TARIFF/ 33484
DATE: 09.11.11
149 Additional Charge to be levied to all cc nsumer categories for 12 months w.e.f. 1st
November 2011.
REF.PR-3 ! TARIFF! 33176
DATE: 04.11.11
147 Grant of Open Access to Consumers Sourcing power from Renewable energy generators
(Such as Wind, Biomass, Bagasse, Solar, Small Hydro etc.) — Procedure for Application,
levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Billing, etc.
CE/Comm/CP/Open Access/RE/29753
Dt. 30/09/2011
146 Grant of Open Access to Consumers sourcing power from Conventional
Generator (Except for Non Conventional Energy Generator & captive Power Plants)-
Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional
Charge, Metering & Billing, etc.
CE/Comm/CP/Open Access/General/29783
Dt. 30/09/2011
145 Theft of electricity under Section 135 of Electricity Act, 2003 – Monetary
Rewards to outsider informants/MSEDCL employees.
P.Com/Theft Reward/29621
Dt. 29/09/2011
144 Reference of the Legal Disputes u/s. 135 to Lok Adalat – Guidelines &
Implementation.
P.Com/lok Adalat/28174
Dt. 17/09/2011
143 Directives for converting Single point supply consumers to Franchisee
through MOU Route.
PR-3/COS/27922

Dt. 16/09/2011

142 Corrigendum to Commercial Circular No. 140 dt. 17/08/2011. PR-3/Tariff/27760
Dt. 15/09/2011
141 Additional Energy Charges as per 12 months sales applicable w.e.f.
1st September 2011.
PR-3/Tariff/25502
Dt. 18/08/2011
140 Recovery of Additional Charges payable to MSPGCL(MAHAGENCO) in
six equal monthly installments – Implementation of MERC Orders
thereof.
PR-3/Tariff/25450
Dt. 17/08/2011
139 Delegation of power in respect of grant of Prompt Payment Discount. P-Com/Prompt Payment/24365
Dt. 05/08/2011
138 Re-delegation of powers in respect of release of HT connections. Co-ord cell/Re-delegation of power/18961
Dt. 21/06/2011
137 Tariff of Non-conventional Energy (NCE)/ Renewable Energy Projects for FY 2011-12.. CE/Comm/CP/NEC/Tariff/18440
Dt. 16/06/2011
136 Issue of assessment bill under Section 126 & 135 as per Electricity Act 2003. P-Com/Theft/18065
Dt. 13/06/2011
135 Re-delegation of powers in respect of load sanction. Co-ord cell/Re-delegation of power/15311
Dt. 13/05/2011
134 कृषी ग्राहकांकडील थकबाकी वरील व्याजात सवलत देण्यासाठी “कृषी संजीवनी योजना -२०११” पी .आर -३/कृषी संजीवनी /१०८१०
Dt. 01/04/2011
133 Theft of Electricity – Assessment of Civil Liability & Compounding of Offence –
Guidelines thereof
PR-3/COS/5626
Dt. 15/02/2011
132 Compounding of theft cases under Section 152, offence under
Section 135 & lodging of FIR as per Electricity Act 2003.
P-Com/Theft/01299
Dt. 13/01/2011
131 Additional EnergyChargesapplicable w.e.f. 01/12/2010. PR-3/Tariff/01258
Dt. 13/01/2011
130 राज्यातील कृषी ग्राहकांकडून इंधन व इतर समायोजन आकार माफ करणेबाबाबत पी .आर -३/कृषी/37046
Dt. 07/12/2010
129 Schedule of Chareges- Recovery of processing fee thereof. PR3-COS/36124
Dt. 01/12/10
128 Release of power supply at the voltage higher than stipulated in the MERC Supply of Power Regulation 2005. Co-ord cell/Higher Voltage/ No.33357
Dt. 30/10/10
127 Administrative approval for filing legal suit against the defaulters
for recovery of arrears.
No. P-com/Legalj No.33352
Dt.30/10/10
126 Delegation of powers for Chanqe of Name of consumers and the new Form “U” for effecting change of name. No.PR-3/ COS/ No.33350
Dt.30/10/10
125 कृषीपंपधारक ग्राहकांना वीज बिलात इंधन समायोजन कर आकारणेबाबत . पी .आर -३/कृषी/32400
Dt.21/10/10
124 Revision in Tariff – Implementation thereof PR-3/Tariff/31779
Dt. 14/10/2010
123 Clubbing of common meters of Residential Housing Societies & Commercial Complexes. – Additional guidelines thereof. PR-3/Tariff/31671
Dt. 14/10/2010
122 Tariff of Non-Convetional Energy (NCE) / Renewable Energy Projects for FY 2010-11.
CE/Comm/NCE/Tariff/31371
Dt. 12/10/2010
121 फिरत्या पथकाद्वारे विद्युत कायदा -२००३ मधील कलम १३५ व १२६ नुसार संबंधित ग्राहांकांविरुद्ध केलेल्या कारवाईच्या अनुशंघाने वीज देयके वितरित करणेबाबत . पी .आर -३/कॉस /२९४७०
Dt. 29.09.2010
120 Re-delegation of powers in respect of load sanction. Co-ord cell/Re-delegation of power/28964
Dt. 16/09/2010
119 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या ” जीवन संजीवनी ” योजनेला मुदतवाढ पी .आर -३/जीवन संजीवनी /२३११३
Dt. 21/07/2010
118 Checking of Zero, faulty & average billed consumers. PR-3/General /No/19345
Dt. 18/06/2010
117 Clarificatory Order dt. 12/05/2010 in the matter of MERC’s ARR and Detail Tariff Order dt. 17/08/2009. PR-3/Tariff/18862
Dt. 15/06/2010
116 Sanction & Release of power supply at the voltage higher than stipulated in the
MERC Standard of Performance, Regulation, 2005.
PR-3/Tariff/17146
Dt. 28/05/2005
115 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या ” जीवन संजीवनी ” योजनेला मुदतवाढ पी .आर -३/जीवन संजीवनी /16080
Dt. 18/05/2010
114 Release of power supply at the voltage higher than stipulated in the MERC Standard of Performance, Regulation, 2005. Ref. PR – 3 / Tariff/ Rs 11531
Date: 17/04/2010
113 Applicability Of tariff with effect from 1ST April 2010. Ref. PR – 3 / Tariff / No 11314
Date: 16/04/2010
112 Levy of Voltage Surchrge to consumers who are suppied power at lower voltage than precribed voltage as per per SOp regulations in case of HT Consumers. No. Co-ord Cell /Voltage Surcharge,
Date: 15/04/2010
111 महाराष्ट्र विद्युत नियामक अयोग विनिमय २००५ मधील भाग ८. ४ नुसार ग्राहक तपासणी लॉग बुक नोंदी अद्ययावत ठेवणेबाबत. पी .आर -३/कॉस /०७१८५
Dt. 09/03/2010
110 Clubbing of common meters of Residential Housing Societies & Commercial Complexes. No. PR-3/Tariff/04778
Date: 16/02/2010
109 राज्यातील मराठवाडा व विदर्भातील चंद्र्पुर व यवतमाळ जिल्हा व उर्वरित महाराष्ट्रातील टंचाईग्रस्त तालुक्यात टंचाईसदृश्य परिस्तिथी जाहीर करून उपाययोजना करण्याबाबत —–वीज सवलत देणेबाबत पी .आर -३/सबसिडी /१२६९
Dt. 13/01/2010
108 Formation of “Damini Squad” at Circle Level for cross checking and control of meter reading activities of Agencies >No. PR-3/Damini Squad/01648
Date: 15/01/2010
107 Errata and Corrigendum Order dt. 21/12/2009 in the matter of MERC’s ARR and Detail Tariff Order dt. 17/08/2009. No. PR-3/Tariff/40060
Date: 31/12/2009
106 Recovery of additional capacity charges payable to Ratnagiri Gas and Power Private Limited (RGPPL) – Implementation of MERC Order thereof. No. PR-3/Tariff/38174
Date: 08/12/2009
105 Release of power supply at the voltage higher than stipulated in the MERC Standard of Performance, Regulation, 2005. No. PR-3/COS/36986
Date: 26/11/2009
104 Rrocedure of Reduction in Contract Demand / Sanctioned Load in accordance with MERC (Electricity Code and other Conditions of Supply) Regualtions, 2005 – Delegation of powers thereof— Corrigendum No. PR-3/COS/36429
Date: 21/11/2009
103 Guidelines for allotting the work of Photo Meter Reading and Bill Distribution to Mahila Bachat Gats / Mahila Mandals / Women Welfare Associations पी.कॉम /फोटो मीटर /३६२०३
Dt. 19/01/2009
102 Transfer of Cost of Completed Work to Asset Account-need for expeditious action for preparation of Work Completion Report for clearance of Work In Progress Reference NO. Dir (Proj) MSEDCL / CAS / WIP /752
Date: 13/11/2009
101 Procedure of Reduction in Contract Demand / Sanctioned Load in accordance with MERC (Electricity Supply and Other Conditions of Supply) Regulation, 2005 – Delegation of Powers thereof No. PR-3/COS/33445
Date: 16/10/2009
100 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या ” जीवन संजीवनी ” योजनेबद्दल पी .आर -३/कृषी संजीवनी /२८८४३
Dt. 31/08/2009
99 Assessment u/s and /or Offence u/s 135 of the Electricity Act, 2003 No. PR-3/COS/27533
Date: 29/08/2009
98 Authorisation of Field Officers for One Time Settlement in case of LT Consumers and delegation of powers thereof No. P-Com/Accts/26321
Date: 07/08/2009
97 Release of connections to the consumers who have purchased property during Court Auction and withdrawal of the condition No. 3 of Commercial Circular No. 53 dt. 07/05/2007. No. PR-3/COS/24859
Date: 28/07/2009
96 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी आलेल्या ” जीवन संजीवनी ” योजना लागू करण्याबाबत . पी .आर -३/जीवन संजीवनी /२४१९०
Date: 20/07/2009
95 Recovery of Additional Security Deposit – Modification in Commercial Circular No. 57 dt. 07/07/2007 in view of the decision of Ombudsman in representation No. 23/2009 dt. 26/03/2009 No. PR-3/COS/23833
Date: 19/07/2009
94 यंत्रमाग ग्राहकांना दिनांक ०१ जानेवारी २००९ पासून लागू होणारे शासनाचे सवलतीचे दर- शुध्दीपत्र. पी .आर -३/यंत्रमाग /५७४२
Date: 21/02/2009
93 यंत्रमाग ग्राहकांना दिनांक ०१ जानेवारी २००९ पासून लागू होणारे शासनाचे सवलतीचे दर पी .आर -३/यंत्रमाग /५३६२
Dt. 18/02/2009
92 खरीप[ हंगाम २००८ मध्ये टंचाई परिस्तिथि जाहीर आलेल्या गावातील कृषी ग्राहकांना वीज बिलात देण्याबाबत . पी .आर -३/सबसिडी /४४०४
Dt. 07/02/2009
91 DTC Metering and DTC Energy Audit – Modification of Billing System No. PR-3/COS/42646
Date: 04/12/2008
90 Concession in the payment of Additional Security Deposit in respect of Powerloom Consumers and Agricultural consumers No. PR-3/COS/38788
Date: 22/10/2008
89 वीज पुरवठा कायमस्वरूपी खंडित करण्यात आलेल्या घरगुती वीज ग्राहकांसाठी मुदतवाढ देणेबाबत . PR-3/Navprakash Yojana/36619
Dt. 30/09/2008
88 Provisions of Clarificatory Order dated 12th September, 2008 in the matter of the detailed Tariff Order of MERC dated 20th June, 2008 PR-3/PR-3/Tariff /36292/
Date: 26/09/2008
87 Extention to “Navprakash Yojana upto 30 September 2008 PR-3/Navprakash Yojana/33464
Date: 30/08/2008
86 Theft cases under erstwhile E.A., 1910 – vis-à-vis Compounding of offences under Section 152 of E.A., 2003 PR-3/COS/29789
Date: 25/07/2008
85 Recovery of Additional Security Deposit in 6 equal instalments in respect of Domestic Consumers PR-3/COS/SD/29788
Date: 25/07/2008
84 सन २००८ च्या वर्षातील खरीप हंगामात राज्यात दि . १ जुलै २००८ ते आत्तापर्यंतच्या कालावधीत पडणाऱ्या सरासरी पावसाच्या तुलनेत कमी पाऊस झालेल्या ठिकाणी शेतकऱ्यांचा वीज पुरवठा थकीत बिलांच्या कारणात्सव खंडित न करणेबाबत . पी .आर -३/सबसिडी /२८५७७
Date: 15/07/2008
83 Navprakash Yojana PR-3- Navprakash Yojana/ 28574
Date : 15/07/2008
82 Subsidy in tariff to Government Lift Irrigation Scheme. PR-3/ Subsidy/27959
Date : 09/07/2008
81 Revision in tariff – Implementation thereof.
PR-3- Tariff/ 27692
Dated : 07/07/2008
80 Revision in tariff (2008-09) – Implementation thereof. PR-3- Tariff/ 24556
Dated : 31/05/2008
79 Exemption from payment of Security Deposit to the employees of MSETCL/MAHAGENCO for availing single phase residential / commercial connections. PR-3- Tariff/ 23180
Dated : 30/05/2008
78 Consideration of power factor of 0.80 for computation of derived contract demand of LT consumers – guidelines thereof PR-3- Tariff/ 8864
Dated : 28/03/2008
77 Subsidized rates to powerloom consumers w.e.f. 1 April 2007 No.PR-3/Powerloom/6134
Dated: 01/03/2008
76 Compounding of offences under Section 152 of Electricity Act,2003 – Modified guidelines thereof. No.No. PR-3/COS/2814
Dated : 30.01.2008
75 Appeal to the consumer for getting the meter tested while letting the premises on rental basis or purchasing the premises. No. PPR-3/COS /2705
Dated : 29/01/2008
74 Provisions of Clarificatory Order dated 17th December 2007 in respect of the Clarificatory Order dated 11th September 2007 in the matter of the detailed Tariff Order of MERC dated 18th May, 2007 in Case No.65 of 2006. No.PR-3/Tariff /1508
Dated: 16/01/2008
73 Recovery of Demand Charges (Fixed Charges) from Sate Government’s undertaking Irrigation colony.(Marathi) No. PR. 3 / Tariff / 43598
Dated: 13/12/2008
72 Application of appropriate tariff to H.T. connections of Educational Institution, Hotels etc. No. PR. 3 / Tariff / 43598
Dated: 13/12/2007
71 Categorization of HT I Consumers in Continuous and Non-continuous process – Corrigendum to Commercial Circular No. 52 dt. 07/05/2007. No.PR-3 / Tariff / 43385.
Dated: 12/12/2007
70 Delegation of powers to engage advocates for conducting theft of energy cases & other criminal cases before Special and other Courts & fees scheduled. Ref. No. PR-3/Tariff/37050
Dated:- 05/10/2007
69 Subsidized rates to powerloom consumers w.e.f. 1 April 2007. No.PR-3/Powerloom/40575
Date: 12/11/2008
68 Issue of Average/ Supplementary/ Amendment bills to the consumers – corrigendum to Commercial Circular No. 65. No.PR-3/Tariff /40470
Date: 08/11/2007
67 Issue of Average/ Supplementary/ Amendment bills to the consumers – corrigendum to Commercial Circular No. 65. P.Com./Acctts/Supple bills/39630
Dated: 1/11/2007
66 Categorization of HT I Consumers in Continuous and Non-continuous process – Corrigendum to Commercial Circular No. 52 dt. 07/05/2007. No.PR-3/Tariff/38471
Dated: 19/10/2007
65 Issue of Average / Supplementary / Amendment bills to the consumers. P.Com./Acctts/Supple.bills/38675
Dated: 20/10/2007
64 Recovery of Security Deposit from all the consumers including Government Departments, Municipalities, Local Authorities including Zilla Parishads and Licensees, etc. No. Pr-3/COS/35937
Dated: 24/09/2007
63 Categorisation of HT I Consumers in Continuous and Non-continuous Process – Corrigendum to Commercial Circular No. 52 Dated . 07/05/2007 No. Pr-3/Tariff/35001
Dated: 11/09/2007
62 Provisions of Clarificatory Order Dated 24th Aug 2007 in respect of the  detailed Tariff/ Order of MERC Dated 18th May, 2007 in Case No.65 of 2006 No. Pr-3/Tariff/34883
Dated: 10 Sept 2007
61 सन २००६-२००७ च्या वर्षातील खरीप हंगामासाठी टंचाई जाहीर झालेल्या ठिकाणी कृषी ग्राहकांचा वीज पुरवठा खंडित न करणेबाबत . पी .आर -३/सबसिडी /३४६५५
Date: 07/09/2007
60 Categorisation of HT I Consumers in Continuous and Non-continuous Process – Corrigendum to Commercial Circular No. 52. No. Pr – 3 / Tariff / 33003
Dated: 22 Aug 2007
59 कृषीपंपासाठी तात्पुरत्या वीज पुरवठ्याचे दर कमी होणेबाबत. पी .आर -३/कृषी /३२८३७
DATE: 19.08.2007
58 Authorization of officers of the MSEDCL to disconnect supply line of electricity upon detection of theft of electricity – Section 135 (IA) of the Electricity Act 2003, amendments thereof. No. Pr-3/AG/32837
Dated: 19/08/2007
57 Compounding of offences under Section 152 of Electricity Act, 2003. – Corrigendum to Commercial Circular No. 49 Dated 21.12.2006 Pr-3/COS/28519
Dated: 12 July 2007
56 Meter reading through Digital photography P-Com / ACCT / MRTDP / 26426
Dated . 21/6/2007
55 Categorisation of HT I Consumers in Continuous and Non-continuous  Process – Corrigendum to Commercial Circular No. 52. Pr-3/Tariff//26203
Dated: 20/6/ 2007
54 Revision in Tariff/ – Implementation thereof Enclosure to Commercial Circular No. 54 (Tariff/ Booklet) Pr – 3 / Tariff//25485
Dated: 14/06/2007
53 Release of connections to the consumers who have purchased Property during Court Auction. No. Pr-3 / Tariff / 21378
Dated: 07.05.2007
52 Categorisation of HT I consumers in continuous and non-continuous . No. Pr-3 / Tariff / 21377
Dated: 07.05.2007
51 Change in demand charges in respect of LT-V catagary. No. Pr-3 / Tariff / 20940
Dated : 03/05/2007
50 Extending Bulk Discount Facility to Railway Traction Consumers No. Pr – 3 /Tariff / 17097
49 Compounding of offences under Section 152 of Electricity Act, 2003 Pr-3/COS/45813
Dated :- 21-12- 2006
48 Load factor incentive to H.T. Industrial consumers in case of exceeding The contract demand during the period 22.00 hrs. to 6.00 hrs. Pr-3/Tariff//43892
Dated :- 02/12/2006
47 Revision in Tariff/ – Implementation thereof. Pr – 3 / Tariff/ / 40506
Dated : 04.11.2006
46 Authorization of employees of the MSEDCL to perform various functions under the Electricity Act 2003. Pr-3/COS /37722
Dated : 16/10/2006
45 Revision in Tariff / – Implementation thereof. Pr – 3 / Tariff//36771
Dated :09/10/ 2006
44 Corrigendum to Commercial Circular No.43 Dated 27-09-2006 Pr – 3 / COS / 36606
Dated : 07/10/2006
43 Schedule of Charges REF.: Pr – 3 / COS /34587
Dated : 27/09/2006
42 Concessional rate to Powerloom Consumer for the Year 2006 – 07. Pr-3/Subsidy / Powerloom 26938
Dated .19.08.2006.
41 Amnesty Scheme – II for Permanently Disconnected Domestic and Comercial Consumers — Extention thereof Pr-3 / COS /24502
Dated .17.08.2006.
40 Disconnection of Agriculture pumps. Pr-3/General/23857
Dated . 14.08.2006.
39 Procedure to be followed for assessment and filing of theft case where Consumers meter is found abnormally slow. Pr-3 / COS / theft / 21266
Dated .21.07.2006.
38 दुष्काळग्रस्त गावातील कृषी ग्राहकांचा वीज पुरवठा खंडित न करणेबाबत . पी .आर -३/जनरल /२०९५२
Dt. 19/07/2016
37 Power of Police to investigate, search etc. under Electricity Act 2003 and Electricity Act 2005. Pr-3 / COS /20283
Dated .13.07.2006
36 Compounding of offence under Section 152 of Electricity Act,2003 and receipt of payment. – Modification thereof. Pr-3 / COS /19460
Dated .03.07.2006.
35 Amnesty Scheme – II Action Plan thereof. Pr-3 / COS /14510
Dated .03.06.2006
34 Amnesty Scheme – II for Permanently Disconnected Domestic and Comercial Consumers. Pr-3 / COS /11905
Dated .12.05.2006.
33 Theft of Energy and Compounding Charges. Pr-3 / COS /8110
Dated .03.04.2006.
32 Clarification relating compounding of offence under Section 152 of the Electricity Act 2003 and receipt of payment thereof. Pr-3 / COS /7658
Dated .28.03.2006.
31 Recovery of amount of theft of energy and compounding charges. Pr-3 / COS / 6073
Dated .09.03.2006.
30 Delegation of powers in respect of load sanction   for Motive power load Pr-3 / Gen/ 5257
Dated .01.03.2006.
29 वीज ग्राहकांकरिता वीज देयके भरण्याची अंतिम मुदत निश्चिती व शासकीय कार्यालयांना वीज देयके भरण्यास मुदतवाढ देणेबाबत . पी .आर -३/कॉस /4263
DATE: 17.02.2006
28 Theft of energy Electricity -Cash awards to outsider informants / MSEDCL’s employees. Pr-3 / COS / 3615
Dated . 08. 02.2006.
27 Data retrieval of static Tri-Vector TOD meters installed to consumers. Pr-3 / General / 3342
Dated . 06.02.2006.
26 Designating all the Court of Additional District and Session judges at the District Head Quarter for trial of cases under the Electricity Act.2003. Pr-3 / COS / 1469
Dated . 18.01.2006
25 Provisions pertaining to Power Factor Penalty and Power Factor Incentive. Pr-3 / COS / 1226
Dated . 13 01. 2006
24 Procedure to be followed while assessing the consumer (under electricity act 2003) for unauthorised use of electricity. Pr-3 / COS / 0482
Dated .06.01.2006.
23 Amnesty Scheme for Permanently Disconnected Low Tension Consumers. —- Extention thereof. Pr-3 / COS / 0521
Dated .06.01.2006.
22 Providing of Cheque Boxes at all the Section Office and Sub-Division Office. Pr-3 / General / 00212
Dated .03. 01.2006.
21 कृषी ग्राहकांना तात्पुरत्या स्वरूपाचा विद्युत पुरवठा कारणेबाबाबत. पी .आर -३/कृषी /३७७८४
Dt. 06/12/2005
20 Commercial Utilisation for display of advertisement by fixing Kiosks on HT /LT poles, Sub-Station structures, fencing etc. Pr-3 / General / 37483
Dated . 06.12.2005.1
19 Release of Power supply on Priority basis to Agricultural consumers-‘ KRISHI – VIKAS – III SCHEME’ Pr-3 / AG / 35758
Dated . 21.11.2005.
18 Re-delegation of Power to initiate legal action for recovery of arrears of energy bill. Pr-3 / COS / 35004
Dated . 09.11.2005.
17 Theft of energy Electricity – Assessment of Civil Liability and Compounding of offence – Guidelines therefore. Pr-3 / COS / 33598
Dated . 18.10.2005.
16 Sanction and release of power supply on Low Tension for load more than 67 / 100 HP. Pr-3 / COS / 33472
Dated . 17.10.2005
15 Re-delegation of powers in respect of load sanctioned for Industrialpurpose. P.Com / Co.Ord.Cell /   32836
Dated . 10.10.2005.
14 Implementation of Spot Billing and instructions regarding stopping of average bills. Pr-3 / General / 32682
Dated . 07.10.2005.
13 Amnesty Scheme for Permanently Disconnected L.T. Consumers. Pr-3 / COS / 31374
Dated . 29.09.2005.
12 Sub delegation of power to the Zonal Recovery Committee for  recovery of arrears of HT Consumers. P.Com / Acctt. / 31316
Dated . 29.09.2005.
11 Subsidy in Tariff/ to High Tension Powerloom consumers for the periodYear 2005-06. Pr-3 / Subsidy / 31090
Dated . 27.09.2005.
10 Concessional Tariff/ for Temporary connection to SarvajanikGaneshotsav Mandals during Ganpati Festival. Pr-3 / Tariff/ / 30727
Dated . 23.09.2005.
9 Installation of LTMD meters to LT comsumers of industrial and Commercial category having load of 20 KW and above. Pr-3 / Tariff/ / 30457
Dated . 21.09.2005.
8 Corrigendum to Deptt.Cir.(Comm.) No.722 Dated . 17.11.04 Determinationof “Load Factor” in Respect of Hight Tension Consumers. Pr-3 / Tariff/ / 30079
Dated .16.09.2005.
7 Deferment / Instalments / Relief to consumers affected by heavy rains and floods. Pr-3 / General / 28805
Dated . 15.09.2005.
6 Power supply to individual enter Preurs coming under one Premise to establish Powerloom. Pr-3 / COS / 28357
Dated . 01.0 9.2005.
5 Excess Connected Load and Penalty thereof – L.T. Tariff/ Booklet. Pr-3 / Tariff/ / 27729
Dated . 26.08.2005.
4 Unauthorised connection/ reconnection with electric lines of the Distribution Licenses-Action under Section 138 of the Elect. Act.2003. Pr-3 / COS / 24976
Dated . 26.07.2005.
3 Issue of monthly bill in Urban Areas from August-2005. P-Com / Acctts. / Monthly Bills / 21882
Dated . 01.07.2005.
2 Assessment of civil liability in the matter of theft of electricity Revised guidelines. Pr-3 / COS / 21907
Dated . 01.07.2005
1 Lodging of complaint of theft of electricity with the local Police Station Pr-3 / COS / 21906
Dated . 01.07.2005.

Last Updated on

Font Resize